PRomCf REVIEW COMMITTEE REPORT
October 22, 1992
SUBmCf:
Scott Mendell
2800 Longmire Drive., College Station, TX 77845
Earl Havel, Garrett Engineering
P. O.Box 4063, Bryan, TX 77805,TX 75205
projec.t. R. e.viewc..om. ,mitte.:C. if
Jane Kee, Senior Plan~eS/)
Veronica Morgan, Assista ,~ tP. the City Engineer
Mike Lane,P & Z CommiSsioner
Others Attending:
Natalie Thomas, Planning Technician
Samantha. Smith, Engineering Assistant
Deborah Keating, Project Engineer
Shirley Yolk, Development C.oordinator
Mark Smith, Asst Director of Public Services
George Spain, Fire Inspector
Coy Perry, Building Official
Laverne Akin, G.T.E. Representative
Mike Lavender, TCA Cable Representative
Don Fazzino, Lone Star Gas Representative
Claude Cunningham, CSISD Cunningham
PARKING LOT PLAN - Batting Cages; to be located on the northeast
qua.drant of the intersection of Texas Avenue and Krenek Tap Roadl. (92-
423)
TO:
FROM:
The Project Review Committee met on. Wednesday, October 21, 1992 to discuss the
above mentioned parking lot plan. The following comments were made by the various
reviewing agents:
BUILDING:
Suggested moving the batting cage structure to thee.ast approximately 5' in order
to keep the proposed fencing out .of the public utility easement.
W ATER/WASTE. WATER:
Show existing water <and sanitary sewer mains and distinguish between proposed
and existing water and sanitary sewer lines.
Submit sanitary sewer demands with construction documents.
.,..'
PRe Report
Batting Cages
Case #92-423
Page 2
PLANNING:
Parking requirements.. for this. .development . will be . determined by the Planning
and Zoning Commission on Thursday, November 5, 1992. Once a parking
requirement is established, add a parking legend to the site plan.
Submit completed. application for site. plan review.
Show zoning district classifications of surrounding property.
Submit landscape plan complete with legend. Coordinate requirements with
Nanette Manhart at (409) 764-3570.
Note that the existing gravel drive will be removed and seeded or sodded.
A wooden privacy fence should. be placed . along the lease line between the
batting cage and the residential development to the east. Living plant material
can be used, instead of a wooden fence, between the batting cage and the church
to the north as long .as it is a solid screen.and of evergreen plant material.
ELECfRlcAL:
F'IRE:
Submit size and type of electrical service and load data to Electrical Operations
Coordinator Tony Michalsky at (409)764..3660.
The existing structure to be used as an office is not. within the required distance
to the nearest fire hydrant. If an addition is made to this building or a building
permitisreqlliredfotmodifications, every portion of the building must be located
within 300' feet of afire hydrant.i\.ttached is a. copy of the, 13rentwood water line
plans with a proposed ". hydran.t,plea~e.. reflect this, .' hydrant. . on your plans.
Coordinate details with. Fire Inspector George Spain at (409) 764-3705.
ENGINEERING:
Coordinate .. construction details of the development with the proposed expansion
of Krenek Tap Road.
A drainage developlTIen,t.permit is required . prior to any site work. Coordinate
requirements with Project Engineer Deborah Keating at (409) 764-3570.
S'ubmit erosion co.ntrol plan to include a note stating that the contractor is
responsible to seed . or sod all disturbed areas.
Submit sidewalk, pavement and curb details.
Submit details on the culvert to be located along Krenek Tap Road if it is to be
installed before the road is widened.
PRe Report
Batting.. eages
ease #92-423
Page 3
PUBUcSERVIcES:
Coordinate dllU1pster location with Sanitation Superintendent Jim Smith at (409)
764~3690,.'.. The ,dumpster must be screened from the rights-of-way of Krenek Tap
and Texas Avenue.
LONE STAR GAS:
Npte that the Lone Star Gas Company "service line" is a "customer line".
C!9ordinate details with Lone Star Gas Representative Don Fazzino at (409) 776-
0627.
SUBMIT 10 COPIES OF THE REVISED SITE PLAN TO BE REVIEWED BY THE
PLANNING AND ZONING COMMISSION ON NOVEMBER 5, 1992 AND 4
COPIES OF COMPLETE CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE PLAN · ATTACHED · AND 3 . ADDITIONAL COPIES OF THE REVISED SITE
PLAN ONLY TO CONTINUE WITH PHASE · II OF THE BUILDING PERMIT
PROCESS.
MEMORANDUM
TO:
FROM:
DATE:
Pla~ning and ZOningCOmmiss~~
SabIne Kuenzel, Staff Planner ~bJ
October. 29, .1992
RE:
Parking requirement for batting cages
The applicant in this case has been through the first stage of site plan review, and will
revise his site plan to address PRC concerns if the Commission determines that the
parking provided on this plan is adequate.
The applicant is proposing 21 parking spaces to serve 5 batting cages in addition to ~he
900 square foot office building. He will provide refreshments and some coin operated
games in the building.
Staff had researched the parking requirements in other Texas cities, as well as parking
generation handbooks, in an attempt to determine a ratio. The studies proved inadequate.
We therefore encouraged the applicant to be prepared to support the number of spaces he
intends to supply.