HomeMy WebLinkAboutStaff Report
STAFF REPORT
Case No.:
Request:
Applicant:
92-307
Preliminary Plat-Edelweiss Estates Phase One
Begonia Corp.
PHYSICAL.FEATURES
Location: South and adjacent to Arnold Road running from Schaffer Road
west to the extension of Victoria
Area: 10.18 acres
No. Lots: 34 single family lots
ZONING AND LAND USE
Subject Tract: A-O, · Pending request for R-l
North: R-l'
East: A-O
South: A-O
West: A-O
COMPREHENSIVE PLAN
LandUs~ Plan: Property not reflectedas recently annexed.
Thoroughfare Plan: Victoria will be the north-south extension of Welstl
shown. on the Plan. Hasselt will provide east-west
movement from Schaffer to Victoria once Arnold
Road. is abandoned.
ENGINEERING
Sewer:
Provided through Williams Court alongN ottinghamand
Victoria.
Provided through an existinglZ" line running along Arnold
Road.
Nottingham wilLbepaved as it crosses Arnold Road to provide
access.. . If Council accepts P&Z'srecommendation onthe
rezoning, Victoria willbe.improved fromN..Graham to.the
southern boundary of this plat. Staff is working on a
Water:
Streets:
Drainage:
Development Agreement concerning the abandonment of
ArnoldRoad. Hasselt will provide the east-west movement
that Arnold presently does. Staff will be addressing Schaffer
Road during the next phase of the "Graham Road "annexation.
Is generally to the southeast. . Will be handled by an off-site
detention area. further south in a future phase.
NA
May be requested. on. Victoria.
IS'Drainageeasement .dedicated between lots 10 & 11, Block
3 and a S'utilityeasement on the south side of Hasselt.
Will be required on one side of Nottingham and.both sides of
Victoria
FloodPlain:
Oversize:
Easements:
Sidewalks:
IMPACT STUDIES
Previously submitted as part of the Master Plan. for Edelweiss and Rock Prairie. Estates.
STAFF COMMENTS/RECOMMENDATIONS
Staff recommends approval of the preliminary plat withPRC recommendations and
contingent upon the abandonment of Arnold'Road and the provision of utility easements
within this abandoned right-of-way and. access to these easements. Nottingham will have
to be paved from Williams Court to this phase to provide access.