Loading...
HomeMy WebLinkAboutMiscellaneousAGENDA I7L'EM COWER SHEET - - , FILENOT'E 1-15-91 . __._.. Telephone conversation with Steve Ardan regardin lenhaven Phase III Final Plat. .Talked to Steve regarding the filing of the plat... Explain a signatures had been obtained but that the utility modifications either: 1) Had to be completed and approved by the City 2 he had to post. a guarantee with the .City for such improvements to .. be made before I could file it. He objected to the .process. because he didn't have to do it when it was replotted the. last time. I told him I would check to see what happened and call. him. back. Checked with David Pullen to make sure my interpretation- of the subdivision regulations was correct and to ask why 1t wasn't required last time. David Pullen confirmed that my interpretation was correct and that it was an oversight the last time it was replotted and should have been required. Called Steve back .and relayed the information to him. His concern now is that ,the guarantee is not sizable and.:it will cast him as much, if not more, to work with the bank. to get it posted. He said he would like to think about it overnight and get back with me ~i Thursda I told him to s eak to David Pullen who was fully apprised of the Y p ', situation, sin e I would be out of the office. ~~ VM/e'rn J ,, a, ~~ .,,