January 12, 1990
Culpepper Properties
1700 Kyle South, Suits 24{~
College`Statian, Tx 7784
Re Surface drainage considerations for your pending
project at the corner of Texas Avenue and Holleman, and
for the adjoining Polarbek property.
Gentlemena
As discussed with Mr. M.L, Hammo~s, PaE., it appears that
j dint control of the combined excess surfa e run-of f is a
logical and desirable wad to meet city det ration criteria.
Even more desirable is a look at the'entir drainage area
~~
and it's flow through the culverts at An~de son Street ,
downstream from your project ,
obviously your company and/or the Polarbe}~ Company is not
responsible for control of all drainage in the area, but if
you will consider the total drainage syste volurno, and
design the detention outfall structure to discharge volume
within the flow capacity of the Anderson S reet culverts, we
~~ would then consider placement of the deters ion discharge
structure immediately upstream from the cu vents a desirable
and acceptable placement. Backwater from hat point would
then be included within the required deters ion. The added
.volume might possib y relieve your individ al run,-off
i restrictions, resulting in the reduction o required on-site
detention.
Sincerely,:
-- „~ ,~
..~~~
Mark Smith
Assistant City Engineer
I
1
3
~, Home o~ Texas F~ ~ !~'t Uniu~ersity
1
,,
°~
,. ••--
MEMO T4 FILE
SUBJECT: Kapchinski Hill Plat
- Alignment of Holleman Drive.
@ Texas Ave.
~ M David J. Pullen PE Ct En ineer
~ FRO , , Y g
During the review of this plat, tie cansi_dered the
realignment of Holleman Drive to improve the geometry of the
above intersection. The ideal alignment would. radically
change he configuration of the Kapchinsk Hill Subdivision
and would require rearrangement of the properties along
Holleman to_continuepublc .access.. Such action would be
time consuming and could be very expensive. Therefore, we
did. not pursue it. We did consider syringing thecenter line
of Holleman west side} to the south- to align kaetter .with
Holleman '~east~. Such action would require moving the
alignment about 40' south. This alternative had severe
impact an the development and would require ,:negotiating
right-of-way coats and changes. In the interest ',ef economic
development, time and..right-of=way cost,~I decided not to
follow that alternative.
My decisions not to follow the two above _alternativeswere
based on discussions with the traffic engineer 'who has in
depth knowledge of this intersection from previous
employment. As the city develops, Holleman Drive will
require more traffic capacity at this corner. It will need
a right-turn, left-turn and thru movements .for east bound
traffic. Those movements will not be affected by the
current intersection alignment. A though, the current
geometry does not fit our sense of appropriate balance, the
capacity is not substantially _altered unless a 90 degree
intersection created. Accordingly, I decided. to
negotiate for additional right-af-way to provide space for.
the turning movements. '; '~~
~;
..
The developer agreed to provide. a 16' strip o land for
.right-of-way: in exchange for construction of the road~ay.
The roadway construction was planned and scheduled prior to
the 'introduction of this subdivision. mhis- will provide
sufficient space for 3-12' wide lanes fright-turn, thru,
left-turn} for east bound traffic and 22' wide lanefor west
bound traffic. Space for a sidewalk is also available.
cc veronica Morgan
Elrey B. Ash
Tom.. Bremer
~~
cif
;.
i ,
,,y
a
i
fi; _
i ~f
i
i , ~ ,,
,i.
~~
-~~ -.
~~ ..
~.
~.m~ .
~: gd "p
W-
fl
A m ,.. L~ t ,,~; ~ ~ ,a^ .~;4 s ...~ya~~~a"~~""qtr.XIN-"ir~W.Yab'rwr,~;c)+„~,..~ !"n, a;v'
,. ~~' ad'
., - .:
~~
} ,.
.FR
4d
W g
i
~a ,
~~
___
;i
i
t _ ~
.:~ ~ ~ ~
~ ~,,.
L 1
j
fi .B ~
~;. ~ s.
e ~:~
~, ~
li y ~ ;~
}
®~
II,
I~
I'~
,_
f
,,-
;
~ I ~_.
i i 2 .~
~..w
Farer?t! .frly ~ 'b
a. ' -• ' t~
~,~~'~'~~ ~,s.~ u. ~ ~ ""'~,~ ~ end"'„`.~~"''" `
~ r
_,
j I i~.
ail II
~~~ ~,~_~,~ 'ate' ~
i,
~:
\,~'
March 9, x.990
Mr. Robert Todd
culpepper Properties
~.'70o Kyle South
college Sta~ion, TX 7740
dear Mr. Todd.
This letter wi11 serve as cenfirmatior~ of the conversation at our
meeting on Mach ~, 190 ~t whi~~ dime you, Mr. H~mmo~r~s, fir.
Reynolds and Mr. Meeds met pith ~an~ Keep Veronica Morgan and me.
Following an explanation e~ how cx°itical a factor time his become
inyour project, qtrs. ice agreed to allaw you to bypass
submission of a Prelmin~~y Play for the ~l~tting of ~~he property ,
at the seuthweet corner of the interjection of Texas ,Avenue and
Holleman, and ~o pr~cee~ directly to ~ubmi~sibn of a ~~inal Plat,
with the stipulation ghat all reuireame~ts for ~ Preliminary Plat
and a Final P~.at will be .met with your application an~~ submission
of the.. Final Plat. Part of her rea~~n for making tha'~;t
determination was her understanding that your plans were to plat
the property as ohe large lot, b~a~ shy agreed to continue with
your proposal to submit ~ Final Flat on1~~ when she learned that
your plat will consist of ~ lark lots.
Staff would remir~~ you that while you are following tl~e time line
for Preliminary Plats, and meting all requigements for
eubmis~ ion of a Prel iminary Flat, you also will be ~e~~~aired to
.meet all reguirement~ for submitting e Final Plat, one of which
is to have ell construct i un dc~du~tents ~ f ~r public utilities
rewired t~ serve ill lots in the subject property within the
platy approved` by the Fninecring Division prior to having your
plat scheduled for consideration by the C®mmision or the
council.
During the meeting-you again spoke of the importance Hof .having
the .plat filed fur r~co~d by May ~Oth~ ono the city ~~aff advised
they would do everything they can to help ycu melt yo~~r dime
frame, but tho ~lti~a~te rasponsility ~i11 be yours °~b turn in
the impact studies in ample tine for staff to review and .prepare
Y f ~ A t
a recommendation, and to turn in the pl't~ in .time to allow time
fog review/~evisionrr~vie~ prior to the public meotins at which
tho plats will bo considered.
Planning & Zoning ~ommis~ion mee~ir~gs ale h~l~ on the first and
third Th~r~da~s of ~ad~ m~nth~ and the ~,~ecifiC da~esof the
Commission mee~ng~ b~~w~en na~w end a~ ~Oth are March ~.~th
April 5th ~ ~~r i I ~~th a~ Ord and day 17~h , ~
City Council meetings a~°~ held an the second and fourth Thursda s
~'
of e~~h mont~~ and the s~eCifi~ da~as of Council m~atin ~ between
g
now and Mai Ooh az~ March -2~'n~, ~A~ri1 l~thd Aril ~6`th~ Ma 10th
and M~~ ~4~h
Thy normal S~hedulir~g fog Co~sider~ti~n of items Coul~~ be as
f~llows~ April 5th (P~&~} and April 26th ~Coun~il~•
April 19~h ~P&Z~ and ~a 10th ~Coun~il}•~
M,~~r Ord ~P~~ ~ and May 2~th ~Caun~il ~
Enclosed i a Cop~r o~ the Ictt~r r~ardin sur~aCe drains e
g g
Cansie~~tion~ f~~ this ~r~~ert~r which was gent b~ As~~istant Cit
Engineer Mark Smith to C~lpe~~-er Px~o~ertes in ~ar~uar~~ of this
,dear . .~.
If any of the City ~t~f~ Caen be of additional heI to ~ ou
~ ~' ~ Tease
do nod hesitate to Can~a~t ~s. when ,you get more information ut
together re a~din our ~o Deed
g Y ~ tame fdr submission cif
~~rtiCUla~ ~egured items, lease ~ontaCt me ~o w~ Cary work
toge~he~ to Create a time ling wh~Ch both ~~u and the Cit Can
Y
follow.
Yours verb t~ul~r,
Shirlea~r J. Valk
De~relo~ment Coordinata~
~nC ~. os urge
AC i Er l ~. A• Moede ~f 1 I I ~am A e. ~e~noJ.ds M e~ s d7ammon~7
H.E.Butt Cr~CerY C~. ~I.E.~utt ~xo~er~ C~. 1100 K le ~
64:6 S~~ath Main A~e~aue
46 S. Mein Atte, college Sta.
San Antonio T ~~~04 San An°~onia, TX '~~~04 7740
i
i
:Post Qf f tce fox 9960 1110 texas avenue
College tat%on, Texas 7~ 42-0960
. ~~09) 764-35 ;10-
Marsh ~.5~ X990
MEMORANDUM
To Mirk- Smith
Rai' ~~uens
dill ilea
~~ ~~rr
char les Ye~c~~r .
Mike S rode
Enir~~ering Staff
Flahnin~ ~t~ff
~'H~M Shirlo~ ~~lk
f 1~.~4~o acres a
sU~~EGT. Attached Plat o the southw~s~
•
~ox~n~r _~f the in~e~rsect~on of T~
~s Avsnue &
Holleman X90-~~4~
• ~ side~~d at a ~~e~ubmi
Thl~ ghat will be con sign conference
at .l a ~V a.m. on 19~-.rdilesda~~ Ma.t»ch L~.st, lbut ~~ the nature
due
and the - fait that t was t~~xn
of the ply d i n ~~r ~.~, r
"
to distribute it for dour considera
wanted
ton~comments as
~o~n as possible, .
• • ~ erect ~~ a Final f
This plat is being consid lat, altl~ou~h the
"
Q
ro ert .has nearer been p~aL4~.id before e
p ~• ~ ''ar ~Lat are bei
rements of a Prel~.min ~
re~ua ~
11 the
ng i~posed on the
.
"rant d~~el~.er in'~addi~ion ~o all the
apll ~ p of a
reu~re~nents"
Final Plat. The Planning staff has made ~ detormination
h ti
to work with th:~ developer in this mar~ne~ due to the xme
Collstrall'~ts he is eXperiencing.
a t~h~ro~ h ~e~iew b
Please ~i~e this plat
cause_it will be a
~5hat lad -- no second chanc~sl.....You, w'
one p ll be re~eivin~
Ga~~s for car~sid~ration a~~~r tomor
other
ow's deadline, but
wanted to dive ~rou a head start en thie~ o ~. .
~•' f CITY OF COLLEGE STATION
J o
~~
a -~°°
RE; ~A~~HINSKI/CULP~F~ PLA ~
On 3~3~-31 at B:OQ a,m:. boy Hammar~s met wit
veronica ~a~gan, ~ebbi~ Keating and shirley
variaus possible problems resulting fram ~1
roposed dev~~.a~ment of the K~~~~inska prop
p
southwest corner 4f the intersection of lE~ol
~~
~~-~~4~
h David Fuller,
Valk t discuss
3tt i ~1Q/ i th
~rt~r at the
leman & Texas,
fir. Fallen reacted that realignment of :Holleman a the
intersection is ~ein~ studied at this firma 'because
resurfa~in`/MyJ~ of Holleman is being l~nned far the s comer of
~mf p
~.99~, with ~ampletian s~hedul~d befdre students re urn in
August 1.90. H~ staffed that o~a~ poseibl~e option w uld be to
realign the sheet ire a ~°ay whieh would ,r~~ui~e ~ Cl foot
ri ht~-of~wa from this properly at the intersectia , with
g y
the width tapering to leis ~~han ~ feet} far a di tanoe of
approximately 5~0 feet.
If this optianwonld~akepla~e,the Bevel pe~woud not
have to prepare the wor~in~ dr~winge~c~nstruct~i~n
documentsa,because tie Ci~~ ~auld prepa~ethem. f the
optionistaken a~ bein~p~op~eed~h~~the de~relo~erthat
is, the developer widens Hdlleman st~°eet t ~rovid an extra
turnip lanes thenthe developerwould be es~onsi le`~for
g
preparing and submitting the construction acument 'these
documents would have to be received and ap_raved p for to
scheduling the f i na 1 plat for cdr~s idera~t i o at any pull i c
meeting.
Mr. Pullen then addressed the alic~nm~nt of the end driveway
to the sough on Texas Avenue, and re~emmen ed alignment of
that driveway withl~anual ~ri~e to oreate "4 wa
interseoti6n".
It was noted that it will. be .approximately 378 feet to the
first driveway ~so~th on Texts Av~nue~, an the developer4s
representative was aeked to addrass the ex`sting
acceleration lane in the Impact Study.
The location of additional fire hydrants w°11 rat be
necessary an this platy as ghat ~ai~l ~e de ermined at site
plan time. Mr. Hammons was told that perk ps an ~M'as built"
platshould be prepared following developm nt of he
praper~y, because exact lacata.an of eaeeme is could better
be accomplished then than before actual co structior~.
~~J~CITY OF COLLEGE'. STATl06`I
RECOMMENDAT~~IONS
March ~ ~, 1 ~ ~4
MEMORANDUM
FRESUBMISSIOH' +~~3N~'E~E1~CE
To: Flennir~+~ & Zoning ~ommi~sion
Roy Ha~nmen~, ~7~~ Kyle ~f +~ol3ege ~tatir~, T~«
~~840
Mr« Robert Todd, ~~tlpep~er Properties, 1700 Kyle
South, ~c~llege Stati~nx T~ 7~"€~40
FROM: Jim ~allawy, City Fanner
v+~ronca M~rgen, ~~~i~tant t~ the ~~.ty Engineer°
Debbie Keating, Prajeet Engineer
Hill Riley, Water/Sewer operations Mgr.
Ray Ha~rer~ ~, Electrical ~c~perntend~ent
Lavern Aklnr ATE
boy Perry, Building. ~f~icial
.Shirley ~c~l~, Development ~~ordinatc~r
Steve Esmond, Flannin~ & Zanin~ ~~mmissioner
Marianne Bans, Assistant City Attorney.
Sutton Rosier Planning Technician
SUHJECT': 90-Z~~4: Final Piat -- Gulp~pperlKapehinski
property -- 1~.24~0 acres at the southwest cornea of Texas
ar~d..Holleman
Development Cc~~r~dinater v'o~k explained tY~at .this applicant
has rec~iv~d permission ~~om Senior Planner Kee ~e submit a
combination preliminary/final plat.
A Fresubmission Conference gas held on March 21, 190 to
revie~ the subject plat, and staff r~~ammends approval with
the following cor~ditian~*:
LEGAL: Igo problems identified«
ATE: No problems identi~i~d.
ELE~TRI~AL: All guides aid stub ~p~~es must be shown with
their respective oasem~r~ts+ ~~emment was- .made in regard ~o
the property line aldng Texas Avenu+s.~ Electrical service
is well established an,a cannot be re-x°outed in corgi junction
with site c.evelapment even at the applicant's expense«
w,r ~ ~"
WATERI~EWER:
l~ Indicate 18" water line - which is located on private
property with ea~ea~ent~~ tNote ~- t runs the full length o~
the property.
2~ ~hc~r all exi~tinq fire 'hydrant.
3. Indicate the sewer line wY~ich is located in Lot ~?.
~Abandonmer~t of line mint be physically done, at the
develeper's e~pense.~
4. Note - a ~" sanitary sewer..: line runs east alo~q
Heileman, nvt ~~" as .indicated on the plat.
PBcZ cUMMISSIt~Ns Resolve- the ~.ssue of .the 5' d+adicat.~on of~
right ~f wad with the pity's Engineering Division.
DEVLLOI~MENT CooRDI~ATt~R: coordinat+~ with the Engineering
Dv~i+~n ~'vr submittal and appreval a-f constriction
documents: prior to sch~dulinq for F&Z. Be ..sure to submit
impact studies to be reviewed prig to schedul~inq for P&~p
~~crdinate infrastructure dcc~ments wit~i Engineeringa
DRAINAGE: Coordinate with Debbie K~~tn~ -rega:rdinq
con st~uction documents and drainage permit.
EN+~INEERING. E~~in~~ring Division rill review the. proposed
dedication of right of way and impact studies ~espeeially
those in regard-to traffic and waterlsewer~. This review
will determine comments. Locate exiting easements.
Indicate proposed .joint access. ways.
PLANNINGs ~~me conc+~rns as Engineering in regard to access.
WHEN REVI~ION~ HAVE BEEN .MADE AND IMPACT STUDIES ARE
COMPLETE, SUBMIT A FILM POSITIVE AND 13 Ct~PIES of THE
REVISED PLAT WITH ~'HE IMPI~~T STUI~IE~ FoR SCHEDUI~II~ BEFORE
THE PLAN~'ING & ~~NINC C~JMMISSIt~N.
EiVGIERIG D~VIS O
Post Office fox 99b0 11101 Texas Avenue '
College Station, Texas 77 42-0960
(409) 764-3570
MEMORANDUM
TQ: Planning and Zoning Commission
FR(JM Veronica Morgan, Asst. to the City E gineer
SUBJECT: Kapchinski Hill Final Plat
Cn Januar 11 1990 City Council approved
Y -1 zoning for. the
18.245 acre Kapchnski_Hill property. The development now
bein roposed on his property is a large
'~ p shopping center
with a major chain supermarket as an ancho i
Cn March 8, 1990, staff and the developers of this property
met to `discuss he timing and- requirements for. de~elopnc-ent
In that discussion, the developers explain d that due to
critical deadline constraints, that it gas their intent and
desire to submit this plat as a Final. Paat on y, bypassing
the`Prelminary Plat process. Staff di~~ n t have any
roblems with the process, conditioned +~n
p he developer
,
meeting. ALL Preliminary Plat .requirements.
Cn.March 21, 1990, a Presubmission_Confere ce was held. to
discuss the .Final Plat. The majority o,f t e comments at
this conference dealt .with the location of
~ all existing and
,
ropased easements as well as the submissi
p
on of impact
studies.
A revised Finale Plat and impact studies .:we re submitted on
April 9, 199._0. The Plat as submitted, doe s locate all
public easement ,with the exception of e fisting easements
for the electrical transssion line guys, a joint access
easement .between .the properties and the wi dth of additional
right-of-way to be dedicated on Holleman. These are
ro osed to be handled with an " As-Built."
p p plat to be filed
before the certificate of occupancy is iss ued. This process
is similar to that used in the past for w l-Mart, Post oak
Ma11 and other similar projects. At the ime of site flan,
staff will assure these items are address d and are noted on
the site plan to be dedicated with an ".As Built" plat, filed
before the certificate of occupancy will e issued.
The:`impact studies that.. were submitted ad ressed the
follaw;ng areas: traffic, drainage, Ovate ,sewer,
electrical, and gas. Below is a brief su mart' of: each area
and the conclusion drawn by :the impact st
;, dies.
TRAFFIC
The traffic impact study addressed the ,imp ct of the
proposed site development on Holleman Driv and o~n Texas
Avenue from Southwest Parkway to Harvey Rd. The :impact
. study a so included a proposed apartment c mplex ~~n an
adjacent site as additional. traffic genera ed along
Holleman. The study: projected the greater amount of beak
hour `trips occurring as traffic entering e site during the
PM peak period, `with .that number being 817 vehicles/hour.
Conclusions from the study how .that with he addition of a
right turn lane ~on Holleman., the site will have mnima]
impact on the surrounding area.
DRAINAGE
Theedraina estud submitted ro oses a 'o°nt drains e
g y_ P_ P 7 g
detention facility between the Kapchin ki ill siiye and the
adjacent PolarBek .site . PolarBek has sign d the 1~apch.nski
Hill Plat `because of the easement dedcati n takil~g -p ace on
their property. With the detenton..facili y, the.,
development of the site. has no negative m act on the
surrounding area.
WATER
Water supply to the site is provided throw h an 1~3" water
main along Texas Avenue. The impact study shows the line
:has adequate capacity and pressure to acco odate the
consumption and fire flow needs of the ..pro osed dcvelo~ment.
SEWER -
The proposed development has access to 3 d'fferent sewer
lines in the :.area. Because of capacity pr blems ~~ith the
lines, the impact study proposes to assign and route sewer
f ow`from the site. In this manner, it is proposed that
approximately 80% of the site flow .into th line along the
southern. property lime and the remaining 2~ f low into the
line alon Holleman.
g
ELECTRICITY
Electrical power demand and available y w s addressed. N®
line extensions or power generation expans'on are required..
to properly serve the subdivision. I''
__ _ _ _ __
~ '
• ,~,~,
i
~~ . VV~,
~ r r!
,~ ~ ~ 4 H
~ ~~'
~ ~ r ~ ~ I"+itlr~a''
MEMO TO FILE
~~~
'. ..
G
it - -
SUBJECT: Kapchinsk Hilt Plat -
- -Alignment of`Holleman Drive
@ Texas Ave.
FROM: David J. Pullen., PE, .City Engnee
i
During the re~riew of this ::plat, we
considered the
realignment of Holleman .Drive to impro~re t e geometry of the
above intersection. 'ire-~.~e~~.-~a~3.~-g~~ae= =~-l~d-~d~~ca~~~~1
~~ra~e-.~he~..dnf~~gurat-~.-cr~ -off the~~~a~~ch-i~sk= ~--~i~il~i---~ub~lvrs~~~~n-~
n~ld --re~qu~.r--~ ~--rya-r~a~age~~nt~o~ft~.~e .~op~t ~.~e~sa.~l~ong
l~~a-n~--~t-o---son~~a.-~u~e~~-pub3a~~.:~cces ~'~~c wo~u~-~d
~t~e~-~~n-s~~i-hc~-.:and.~--cou~ld ~be~r...very~" eXpens-~~ ~ ..w,.Th~r~~-c~r-e; ~-w~w
d~~d~~-~=p~~~~e~-l~t . We did con ider swag g the center 1 ne
of Holleman :(west side}'to the south to align fetter with.
Holleman {east}. Such: action would r quire moving the
alignment `about 40' south. This alfer ati~e had severe
impact on the development and; would r' quire negotiating
right-of -way costs and changes . In the in erect Uf economic
development, time Nand right-of-way cost,` I decided riot to
follow 'that alternative.
My decisions not to follow the two above alternatives were
based on discussions with the traffic en neer~~who has in
depth knowledge of this intersect:io~ from previous
employment. As the city develop , Hol leman ;Drive will:
~,I
require more traffic capacity at this cor
. er. It will ` need-
I
a right-turn., left-turn and thru movemen
s for east boumd-
traffic.. Those movements wil not be of f ect'~ ed by t`he
current intersection` ali merit lth
.
g h t he curremt
er
eometr ~.oe~~~:t-~ f~:t~--ou-~ - .a .~b~ nce the
capacity is` not substantially altered u less, a~, 9o degree
intersection is created. Accordingly , I d ecided o
negotiate for additional right-of-way to provide~~~ ; space for
the turning movements.
i
;_
i
~~~
~~
i
1 j
-1 ~
,,f The developer agreed to ..
provide; a 16'' ~
trip of land. fdr
right-of-way in exchange for constructio of th'e roadway.
Thee roadwa construction wa planned and
Y cheduled prior to
,;
the Introduction of this
subdlvlson
hls will provide
sufficient space for 3-3. 2' wide .lanes ( right-tern, thru,
left-turn) for east bound traffic and 22' ide lane :fore.. west.
bound traffic. Space for a: sidewalk is a o available.
a
cc: Veronica Morgan
Elrey B. Ash
Tom 8rymer
~_
__
CITY. OF COLLEGE STATIOI~I
P. O. BOX 9960 it I TEXAS AVEfVUE
COLLEGE STAT10tV. TEXAS 77841-!?9Ei~) I
___
LEGAL DEPARTMENT
FILE NOTE
May 2, 1990
RE: H.E.B. Store - I~apchnski Tract on Texa s Avenue South
Cne complete center in appearance but subdv 'ded. ~~hey have one
tenant., H.E,B. wants one sign of its own. spoke initially
with John Culp-tipper and then with Robert. Toed I.tc~ld Hines that
I would look at the ordinance and ~e~ with t e Planning staff and
get them a response. Robert.Todd's number i 696-144.
Planning :and Zoning moved to approve the pla without any sic~nage
restrictions but it must be ratified and sti 1 needs Council
approval. Thee staff will not take a posto but w~.ll reve~r
previous Council actions as in every other c se.
I then returned Robert Todd's call. I also poke with John
Culpepper. They want to delay sign number c nsider~tion until-
the site plan. I told him this would be wit ..
in the discretion of
the Council. I told him that. if the issue i raised he' will need
to make his request }mown to the Council.
`.
Cathy
CL: sr
cc Jim Callaway
~,
~,
',
~~~( CITY OF COL~EGE STAT~JN
(409) 764 - 3500
t
i
~'une 5, ~9~~
.Mr, Robert Todd i
C~lp~pp~r Frcaperti~s
~7D~ Kyle Sauth
College ~tat~n, T 7~84Q_
~~: Fil ini~ e~- the ~~pohi~r~k Hil ~ ~n~ Flet ',
~+~~:r ~~, Tc~~d,
qn ~a 9 ~9~~ the C~11~ e ~ta~~n Cit Council Loved
y , ~ Y pp,
the fzr~al plat ~~' Kapcha.r~skl H~.l l the Future site of ~~ H. E • ~. ,
oer~~inge~t upon: the ~'ol lowing stipulations ~ ~
Th F al °'~s ~ ~" lad must b ~'le
1 ~ n u~.l p e i d ~'~~ record
b~~ore the Cert~i~ate of ~ou~a~c w~. l b
issued. ~~
2. The develc~ e~ should ro~dc ao~ess betwee~l thi
s
~!
'~'I de~re 'o m t
_1 p e~ a~~ the ad~aoe~t shopp~~g oer~t~r to
the so~z~th~ 'i
D~si~~nate the width of the dedicated right ~ burn
Yene f rthe~ than ~f~~h- uhl~aw~'° , ~~ th~.s final
i
plat.
~ • • e
MJ 1r ~ u ~ ~ 4 ~ 1w/ ~ ~ ~ V G",e s ~ i.~ t YB. V ~ ~ l t V t h .L s ~ Gl t i .i. it ~ s t ~ ~r
~ndersta~dng ~~ City ~ta~f that ~tipu ati~n #~ his b~or~
~esclved by some type of agr~~en~e'~t between the duel ~a~aers~
This....are~ment gust ~~ re~err~d to by nat~ ~~ the "A~~-Hu1t"
plat c~ ir~clue~ a pert ~~ that plat. Tho do~~ment
submitted does ~ne~t S~ipulat~.on No + 3
City ~taf ~' is ire the prcoess ~f c~btanin~ the ~ppr~p iat
. 4 -. -.
slgn~t~res ~~ the p~.~t, pr~.c~r to filing ~'pr reo~r~ w~.th the
bounty.
Flea a feel free tea ~ontaot ~~ if ou have are -forth ~ r
y
~uestc~~ns
Sincerely,
David Pullen
+~ity En+~ineer