March 1'8 ,1991
Sabine Kuenzel
Planning Assistant
City of College Station
PoO. Box 9960
College Station, Texas 77842-0690
Re: Landscaping at Homestead Place {aka Shiloh Place)renovatic:,n.
Dear Sabine:
I app~eciate the information and co[yof the site plan. I have marked
on the plan 'where we planted the trees. As you can see, two of them (1
and 2) are not where originally shown on the plan.
One was planted in the first locationl but didn't do well. I ca.n only
specul ate it was because it was shaded by the Post Oak trees to~~ering
above it. The other one was not planted wh~re indicated because it
would have been directly in front of a tenant'~ sign and it too, would
have been in the shade for much of the day because of the building. I
feel both trees are in. better locations now.
The other two ~ weren' tpl anted because we didn't finish that par~~ of the
parking 1 at until early NOVelTtber . I decided to wait until after winter
to plant those two. Thanks for the reminder - I had them planted last
week.
Please call, if there are any questions.
Sincerely,
~r\~~
David Alexander
Owner's Agent
P.o. Box 5445 · Bryan, TX 77805 · (409) 846-9087
"'P^~ttt,~,p~ MR\ri ., It f{tM~
Mr. David Alexander
P.O. Box 5445
Bryan, TX77805
March 4, 1990
RE: Landscaping at Shiloh Place renovation
Dear David:
Pursuant to our phone conversation last week , I..ran a copy
of the site and landscape plan. To avoid confusion, I have
summarized the requirements as they relate to your site as
follows:
- 500 additional points were, required at the time
of the revised site plan
- Half of these points, or at least 250, need to
be in canopy trees, the rest of the points ,may be
canopy or non-canopy trees, or shrubs
- One canopy tree is worth 75 points
- Four trees would meet the canopy tree
requirement, for a..totalof 300 points
- Only one tree was counted at the time of'
inspection, three more are needed
If you have any questions, please let me know.
Thank you.
Sincerely,
Sabine Kuenzel
Planning Assistant
Mr. David Alexander
P.o. Box 5445
Bryan,TX 77805
March 22, 1990
RE: Landscaping at Shiloh Plade renovation
Dear David:
I received your letter regarding, the trees you planted ort
the subject property.' I inspected the site yesterday and
found it to be incompliance with the landscaping
requirements. Thank you for working with us on thismatte:r
and for you timely response.
If you have any questions regarding this or any other
matter, please let me know.
Thank you.
Sincerely,
Sabine Kuenzel
Planning Assistant
_I
11
CITY OF COLLEGE STATION
PLANNING. DIVISION
Post Office Box 9960 11 01 Texas Avenue
College Station, Texas 77842-0960
(409) 764-3570
October1l, 1989
MEMORANDUM
TO:
David Alexander, P.O. Box 5445, Bryan, Texas 77805
Larry Wells, P .0. Box 9249, College 'station, Te~{as
FROM:
Project> Review Committee:
Jane Kee/SeniorPlanner
Mark Smith, P.E., Assistant city Engineer
Lynn COlson/P&ZRepresentative
others attending:
Bill Riley, Opera,tionsManager - WIS Division
Ray Havens, Electrical Superintendent
Coy Perry,. Building Official
D~borahWilliams,Administrative Secretary
SUBJECT: Revised parking~otplan - Additionof2pneumatic
driVe-through stations in an existing driveway c:\nd
adriye-throughinthe existing building in Shiloh
Place Shopping Center Phase I (89-410)
The P.R.C. met on this date to review the subject proposal,
and made the decision.to approve the project with the
following ...recommendations.:
BUILDING DIVISION: The canopy need to be ofanon~
combustible material.
ELECTRICAL DIVISION: The power pole located at the southwest
corner of the building needs to be at least 10 feet from the
building. when relocated which . will put it out in .. the
church's parking lot. An easement will be needed from the
church to relocate the .. pole. The estimate for the city to
relocatethepoleis$3,256~
WATER & SEWER DIVISION: No problem with the installation of
the fire hydrant as shown. Final location is subject to the
Fire Marshall's approval.
PLANNING &.ZONING:One half of the 500 minimum points for
landscaping. needs to. be.. canopy trees.
G.T.E.:Noproblems identified.
>4 ", ..
ENGINEERING: No problems were identified.
PUBLIC SERVICES: No problems were identified.
The applicant indicated that aplat.willbeprepared
granting the access easement and any utility easements. In
order to allow remodel ingto beginitwassuggestedtha t (:in
interior remodeling permit be applied for. Then once
utility construction plans are accepted & the ,plat is fil.~d,
a permit for the remainder of the project may be applied
for.
SUBMIT 13 COPIES OF A REVISED PLAN OR PROPOSAL TO THE
PLANNING... DIVISION..
AGENDA
CITY OF COLLEGE STATION, TEXAS
Proj ect . Rev ie~\fCommit t ee
Wednesday, Octob'er 11, 1989
10:00 a.m.
PARKING LOT PLAN - Consideratio,n ofarevisedsitejparking lot
plan for the addition of 2 pneumatic drive
through stations to be located in the Shiloh
PlaceShoppingCenterC89-410)
J
il~i) ~f~f _.
~H l~'+~ \@L~4
(~
)
j-'" j
_ ~__ ..~."___~ .~_. _.. ~ ',n_ . ..,_
~~.Cliifl"" ..
. '~j-II."'. 'r.~.. ........_.._.... ..,
rU
I: \
111.,"/
. i! I .. ....-.. ........... ... '.' ... .......;;.. ..........~=/(;?~~.....~ ..
./:ID=........................_...._..............(.~.._-=...-;. / . . . - . -~
...~ .._..-::rAqJ~n~_n. '..
III
........I[t!-~~...~~...~.....~...~....
ill
.iil H., -~~2' ~..~-.'.n~ . --<-/i2~.,..~.~" .
.......- . ... .111_ ...................-.... . _ ,/,.~ .
.~--d~..~.._....n.~.;:: __.' ~~...... .
- .nfd._~~.-'.Yf1P#--.~--
III
! II
(fiil -. ..
I I
r r
! ! I
Ill!'
. -..... ~ J fd'---
. :~jj~_..
'i i,
l ~ t
! 11
i-H--
.........Iin.~................n .....~..._~.....~
.t"....I.I!",.n. ............ .... /, .....~....~.-.'~......'f-o._...~-..~~l0j-....
Iii '4-{). ~ '
1...1'1:. ..... ..n ....,.......... .'. ....~...... ...
: f
Llt-..n..n .
! : j
III
--~I~---- --" ..- . c/.. ~~__ tJ,G .
Ii 'I' hzu..__.~H-..H
" "~"~"'''\'l. ." ~~".,,,~~, .., ~"--~-..~~,.....,.."..
-\\\.......-..---- .. ./1~a~~~
ill _/~( ...
"-'Hf- '
111- . , ~ A~ ~ '._ _Hi
'I} ~~.._,~,
- ... --Ill-- ........ ............ ... ---- - .
\i I
...... .. .lII.........
t f ~
! I ~
lll.... . .
III
- .llt....
i\I-~......'..-.~..'." 7.....~.. / .'.- - A/ ./ .I ~
, 11 ~~..,.,~
'1\1-
'Tn-
li i
; ; \
1:1
,.~. .......,!'!-t"
\ \ I
--I \ \ .. ..
,..J.1-1, ,,..-
ill
1 \ I
IIj
"1-ll'
! i
ill
i i I
\-Il
! II
~ ! I
...."'1\ I
1, ; I
: t ,. __
.. HI.
- ........ .. -I II .. ..
.... ..... .-... .il -W--'H
1 tJ"......-........,.......... ...,,,~,, . "~ .....,., ..--- -." ..~~. ~ ..
"~"~I --' (L_ .... ..]
, 'J \ 1 i '
, I
't I .'
11
,.....~.
~~_.._.. ..
______- .... ... ..~/H--
--.w._"....,.,~....., .._/22~~..,.
-~~ +-~
~-~~
~ . /-u-L
,......... - ..~ ~ -~
.~...~~................
/1/ >__. / ~_
~....."...,......._.,..
~.~
4
~
Iii
i j I
~~~~-~~~Z:~~~~ ~...........
III
,"_~_...~Jl.lw
! II
'i 1\
-itl. ....
Ii l
_L.L~~ ~ .
III
') !
__LLL ,---____ -
Ii j
III
; II
ill
"+11-
lll'l
-.. ..1.1
1\ '
I'll
II
ill i
-nf ..
It!
IU
III
.UI
-Ill
-.\~I
j II
Il[
Li!
r \ 1
: II
... III..
I. j I.
! I
i i
,411
II,
!1I
: I!
'p!
ill
Ut
III
i i
'--j1- --. '..-
i 11
i I [
; II
; Ii
J,lj,-
ill
III
.~t.
, i!
,. ; I
_.++~..
I!
J~
' ~ 1
kd
~<__ ,._ ... ....,__~_.. .._',.'",",_ __ '.." m __".~._
~t c.. 2:
.,,-
....__ ...... ... ......... .... __~~w._ ............~ ... ... ........ .
--~. ...........-.. ................. ............~........~..
q_____ .... _ ... ~~_~_~;i~ .
--- ..1;.
~tJ?~~
.........Yd ( ~.
sh~
)~
applicant
developer/owner
architect/englneer
site.
proposed project site.
drawn,tabulated and dimensioned.
11 'of the Zoni-ngOrdinance (Ord.No.l'638) 0
12)
and units tooecanstructed on the proposed
~ach"~:':bu i 1 ding.
16)
17)
1 :8)
THE
bulldi'ng coverage of site.
r~quiredby ordinance and provided by proposal.
all structures, parking spaces, ,drives, curb cuts,
, '
1 )
2)
J)
4)
5)
6)
7)
A (Sec.],pg 30)
2 I ' overhang.
\' ],1
Standards for Plan Development (Contin.ued)
page 2
8)
9)
10)
11)
12)
13)
Wheelstops~ayberequlredoninteriorrows 1 ongerthan ,10 spaces ori n
specialsi tuations.
Slclewalksareamlnimum4ft'. wldeon si'te; 6ft. wide adJacent to parking
spaces.
D'l'>rect(lfofPublic$erv lee? determlnesnumber, sIze and approves ] ocat i on of
dumpsters..
Parking isJands are 9'x20 ';~r180 squar.efe.et.
Healthy~nativet]:.ees D~er 6"~allper should beretaJned whenever ppss ible.
C~rbcuts.aredeteirmJned bY.iCl~yEngineer. Standards. are one. clJrb cut fora
siite., wlth125.....feet..street...frQnta.ge and .two...cuts for ..25:0 feet ...frQntage. An
a~ditiona150() feet offr~ntagT,J:needed fOf'eachadditiDnal cut. In general,
k~TPcut$at least 200 feet. fir~major . lnte rsect iDns .
See .......Ordfmance.. .1638 .S,eeti"onlJ',}'f(:)r .la'ndsc8pingrequ irements.
Fire<lan~sofamlnimumof20:~eet inwldth with a minimum height clearance
of14feett'nust.peestabl ist:te~tfiany structure of any type is more than
lSO..feetf:r~m 8 flub 1 lc..street,'prh ighway.
Anyst~uqt!ureinanyzonin9dii~~rlct other than R"1, R-1Aor R-2 must be within
30,Ofeeto'f.a fi rehydrant . aSi~ersuredal on9 apubl ic.. street. or highway.
FI:r~hyd"'9,flt~ must beilocate~, ~ry thesames ide ofamajor street as, a project,
an~shallbejna location aPPfoved by the Fire .Marsha 1 · s Dffice and the Super-
inteflde~~.{)f Water and Sewer ..
()fflce:?,..:t>~slnes s. facilities:.:ln'excess ..... of 5,000 sq ~ ft. must. furn i.sh pa rk i n9
sP~ices(~inlmum $ize12'x~Oi'~designated for use by.handicapped persons only,
~l~tlrql11JL1.s:wit.n .no~"r.(!atere~ia~ientthan 1:12 and a mlnlmum wldthof 4 feet.
S'E;~,SECJIJON '.508 OF .' THE 'SIANDA;RIJ 'BlJI [0 lNGCOOEF'ORADDIT l'ONAL INFORMA TION .
14)
15)
16)
17)
18)
September 6, 1989
MEMORANDUM
TO:
David Alexander, P.O. Box 5445, Bryan,TX 77805
FROM:
Project Review Committee:
Jane Kee, Senior Planne
Mark Smith, Assistant C.
Lynn Colson,P&Z Represe
Others attending:
Bill Riley, Operations Manager - W/S Division
Ray Havens, Electrical Superintendent
Alan Colley, GTE (prior review)
Harry Davis, Fire Marshal
Kean Register, Lone Star Gas
Coy Perry, Building Official
Jim Smith, Sanitation Supervisor (prior review)
Marianne Banks, Assistant City Attorney
Shirley Volk, Pla:pning Technician
SUBJECT: Parking Lot Plan-Addition of2 pneumatic drive-'
through stations in an existing driveway and a drive-
through window in the existing building in Shilohl Place
Shopping Center Phase I (89-410)
The P.R.C. met on this date to review the subject proposal, and
made the decision that approval of the project could not be'
recommended due to the following concerns which were identified:
~!l!!!!!!Ng!!!Y:!~!QN: The structure cannot extend into the bu.ilding
setback or into an easement.
~~~. g~~Rg~IN~~I!yg: The southernmost driveway, which is proposed
to share access wi th the church adjacent to this project, mlust
continue to provide 2-way access' to provide access to the church.
The stacking of traffic on this lot which will be running
parallel to Texas Avenue would tend to create a distraction, and
therefore becomes traffic hazard.
~1~gI~lg!1: There isa power pole located at the southeast
corner of the building. If this pole is moved, any costs
involved in relocating it must be the responsibility of the
developer. If the pole is relocated to the point shown on the
plan reviewed (Plan E), it will have to be guyed on the adjacent
property (the church). A written agreement to this from the
adjacent property owner must be submitted before this can l::.e
approved.
E!Rg M~R~!!~!!!! ~ !!~:r~R ~ ~~!!~R ~!Y!~!Q~: A fire hydrant mus,t be
located within 300 feet of all parts of all buildings as thLe hose
lay. The church on the adjacent lot is provided coverage f~r.om
the fire hydrant at the northwest corner of the building. If the
hydrant is moved to the location proposed on Plan E, and tile
driving lanes. are.develope.d with 3 lanes of traffic circulslting
thr-ough 2 pneumatic stations and a drive-through window on the
weste.nd of the building,. fire emergency equipment would no~
lo~ger; have. access from the hydrant to the church, and an
additional hydrant to provide coverage for the church w.ouldl be
required.
Before adding or moving a fire hydrant, construction documents
must be approved by the City Engineer's office.
INq!NI~R!Bg: Redraw any revised plan to scale.
Show the exact location of the 20 foot utility easement which
runs parallel to Texas Avenue. Neither the structure nor the
pneumatic stations can be located in a utility easement.
Concern with the proposed 3 lanes of traffic was expressed.
The amount of space for stacking vehicles it too short.
Circulation to/from and within the parking lot will be bloc:ked.
~!!~N~!~@Lg,QN!~q: Any landscaping destroyed must be replace:d
somewhere on the site tomaintainatandards existing at the time
of approval of the shopping center.
Zoning Board of Adjustment action will be required if the canopy
or cover ext-ends into the front setback.
Concern was expressed with the proposed shared access. An
acknowledgment from or agreement with the church must be
supplied by the applicant.
~!J~11g ~E.RY1~~~: No problems identified.
g~I~I~: Coordinate service requirements with LaVern Akin or Alan
Colley of the Company. No problems identified.
1Q~~ ~IAB gA~: No problems identified.
SUBMIT -10 COPIES OF. A REVISED PLAN OR PROPOSAL TO THE PLANN'ING
DIVISION BY NOON ON ANY FRIDAY TO BE HE-SCHEDULED FOR REVIEW BY
THE P.R.C. AND ALL TECHNICAL DIVISIONS ON THE FOLLOWING
WEDNESDAY.
PRC89-4'J;'/~)rf
9-6-89
Page 2
~.A"CITY Of=COLLEGE STATION
".~.. . .. .. . PI-ANNlNG DIVISI()N
.. .... ... · ... Post Office Box 9960 1101 Texas Avenue
College Station, Texas 77842-0960.
(409) 764-3570
October 11,.1989
MEMORANDUM
TO:
David Alexander, P.O. Box 5445, . Bryan, Texas 77805
Larry Wells, P.O. Box 9249, College station, Texas
FROM:
project Review Committee:
Jane Kee, Senior Planner
Mark Smith, P.E., Assistant city Engineer
Lynn Colson, P&Z Representative
others attendinq:
Bill Riley, Operations Manager -WjSDivision
Ray Havens, Electrical Superintendent
Coy Perry, Building Official
Deborah Williams, Administrative Secretary
SUBJECT: Revised parking lot plan - Addition of 2 pneumatic
drive-through statio.ns in an existing driveway and
adrive-throughin.the existing building in Shiloh
Place Shopping Center Phase I (89-41.0)
The P.R.C.meton this date to review the subject proposal,
and made the decision to approve the project with the
following.recommendations:
BUILDING DIVISION: The canopy need to be of a non-
combustible material.
ELECTRICAL DIVISION: The power pole located at the southwest
corner of the building needs to be at least 10 feet from. the
building when relocated which will put it out in the
church's parking lot. An easement will be needed from the
church to relocate the pole. The estimate for the city to
relocate the pole is $3,256.
WATER & SEWER DIVISION: No problem with the installation. of
the fire hydrant as shown. Final location is subject tOI the
Fire Marshall's approval.
PLANNING & ZONING: One half of the 500 minimum points fOlr
landscaping needs to be canopy trees.
G.T.E.: No problems identified.
ENGINEERING: No problems were identified. "
PUBLIC SERVICES: No problems were identified.
The applicant indicated that a plat will be prepared
granti'ng the access easement and any utility easements. In
order to allow remodeling to'begin it was. suggested that an
interior. remodeling. permit be applied for. Then once
utility construction plans are accepted & the plat is filed,
a permit for the remainder of the project may be applied
for.
THE
,~>t;::':1~;:~'~~,;~"'~_~k~-,~~,; ,'~:[
)r(f<~ZjJS: ..}2,}~~
1~
." tJcl- 4/tJ
MEMORANDUM
DATE
.3ltdl9o
/ . . . I
TO:
,,' ""~'~"'.
DATE
2>/d,b
.8!~
PUBLIC .SERVI CES
SANITATION
h-0 c5f~} 3~
l
6?. .... ................ . .... ...... ..... . '.' ..,.... /. '-". .~. .
~t- ~ ,
alz6Fg;~. ..~~
Sf-23... .. IV---- -
~....-~ iB/S>-2>k~'-f~
~/t;l~ .~~~ _
APPROVA.L...............O..F..................B...U......I...I.DTNGPLANSFOR: ..~. '.1.':.)',,~ '. ". ;.... '~-k.. .
U~(j
#:qtJCJZJ..BbJl<... .. oJ/~~/
PROJECT :)-/()/I7c67eAD6AWItJ<516. I J 511/LL'/ /r/ ;:::'~/9 Cc
TSSUEDTO"7j:d/) urt/ .~rJeL.l::)j~h6'~r
WATER
SEWER
ELECTRIC
BUILDING
PLEASE REVIEW THE ENCLOSED PLANS AND NOTE <YOUR ACCEPTANCE :BY
INITIALING. AND DATING THIS MEMORANDUMINYOlJR AREA OF
EXPERTISE 41
IFYOUH.A.VE '.ANYQUESTIONS I . .THECgNTRACTORMA.YBE . REA CHED.A T
THE PHONE NUMBER OR ". ADDRESS,,' ABOVE. PLEASE CALL SHIRLEY VOLK
AT EXT. 458 WHEN THEY HAVE MET >YOlJRAPPROYALOR TO ADVISE
ANY PROBLEMS THAT MAY NEED SPECIAL ATTENTION.
Property Management
Commercial · Residential
ALEXANDER
ryroperlies
Real Estate
Sales · Leasing
May 24, 1990
Jane R. Kee
Senior Planner
City of College Station
1101 Texas Avenue
College station, Texas 77842
Re: Homestead Place (aka Shiloh Place) construction.
Dear Jane:
All of the site improvements to the above referenced property have been
completed except for the modifications necessary to the parking area
toward the back of the property. The balance of the work will be
completed no later than August 31, 1990. Thank you for your
consideration in this matter.
Sincerely,
~~ f\~
David Alexander
P.o. Box 5445 · Bryan, TX 77805 · (409) 846-9087
MEMORANDUM TO. FILE
FROM:
DATE:
RE:
Cathy Locke, city Attdrney
November 21, 1989
Shiloh Place - David Alexander
On November 20, 1989 , lspokewith Mark smith in order te)
get some background prior to my meeting with David
Alexander. It seems that David is in charge of pursuing
site plan approval for Homestead SavingsatShilph Place.
The property is currentlY plated with an unfiled plat. The
propertysharesj oiD.taccess wi ththe neighboring Baptist:
Church. Most of the driveway is across. the Church tract..
David has submitted a site plan which changes the Stat\lS quo
with regard to the. Church property. It effectively.m~kes
two-thirds of the driveway into a one way exit for jthr.drive
through teller positions. This is the Church's OI1liY access.
David Alexander was not required tohavetheChurchi.listed
as a joint applicant. He was asked to provide the ~i~y with
a copy of the joint .access agreement. It seems that nonE~ of
the parties can find the agreement and that a proce~s ofne-
gotiation is now going on between the Church andHo~estead.
David carne .in toindic.atethat he was not very happy rwitll
the requirernentthathei get permission from the .Chu:rch tC)
change the use of part of the drive. I indicated to him
that Mark Smi thwas really being pretty lenient on him' bE~-
cause Mark could have imposed the requirement that .thie
Church be a joint applicant since the change involves the
Church. In response to his complaint thatMarkcouldha'/e
just ignored the Church, I told him thati t would b'e unrE~a-
sonable where a change is being made with regard.totheuse
of someone'spropertyto do so without notifying them. He
agreed, although not wholeheartedly. I ~lso told him that
it would not beunreasopabl~ .for the Church to be complain-
ing about the staff to the Council if wedidapprov~the
modification wi thoutthe Church 'spermission. I thinkh~~
went away with a better understanding that the staff 'is l:1ot
trying to give him a difficult time.
CL:sr
cc: Tom Brymer
Mark smith
Ron .Ragland