Loading...
HomeMy WebLinkAboutMisc. ~/ t~I~W~, , , '!'C' ....... ... .. .. . .. .. ....d.. ". .. . II ~i ~~~D AO/} '..~......~ .~.laJ..-A* S -?1JPJzl) -~ 4" '- , ~~ 1/, ~./- '"', ~ , ~c~J~ peg .?4d ~~ J-~ ~ /I ",t? ~t.... ,0 II? ,I' ~ {..../ r ,~ /' " . 'i.I~CITY. OF COLLEGE STATION \S .i'. PLANNING DIVISION .... ..... ... . . Post .Office Box. 9960 . 1101.'Texas Avenue CollegeStation,T exas 77842-0960 (409)764-3570 October 12, 1988 MEMORANDUM TO: HAjRWS Architects, 7607 Eastmark Drive, e.B., TX. DavidBrewer,C. S .1.' S .D.,lOOAnderson,C .'S .,"TX Larry Wells, Municipal Development Group, Holleman FROM: .Jim Callaway, Director OfPlanning~ SUBJECT: PreliminaryReviewofSitePlans- High School Stadium Site - Welsh&FM281B (88-70'7) A preliminary review of the subject proposal was made on this dlltebY,technicalpersonnel,consultantsand P&ZCommission representatives with the following .s.uggestions and comments resulting: ~ONE STAR GAS COMPANY (Kean Register): Furnish meter locat.ion and load requirements. FIRE DEPARTMENT (Harry Davis, Fire Marshal): Show fire hydrant location. All stru~ture's must be within 300 feet of a hydrant. After determination is made regarding a definition of the seating area, requirements for the seating area will bemade.CertainlY,therestrooms and the concession stands must be located within 300 feetofa hydrant. Emergency vehicle access. will be required. Specify location of access and comply with minimum standards. ConsideratioD>should be made regarding inclusioDof both the football stadium and the baseball field. Coordinate requirements with the Fire, Marshal's office. If FireI..anesare required, coordinate locations and requiremen t8 with ".theFireMar$hal~'so ffi ce . t:_~~~A~~""""~~"}" .~. u....'.,' -. t ~~~~~~~~;i..o.J.:~';",ik,r~~,.~:.t,..~'~".1PI'",,;,r>..-'.......~'"',,,,-':'::,,"'-'''__':''''''''''~':'~~;""~~'-~1"'~<I:~~~~~~i.:.r..~-.u.:,~~~.....c'.....~~~~,*~~'tfuiI._~",*-;".,J,-,~~~,*,NJ;i.~~"h.,o,lf'~~."",~:"_.......-...._.......,...............~...,...,.,,,_............... ~ ELECTRIC DIVISION (Jimmy McCord, McCord Engineering): Easements will be required around the entire perimeter of the property as follows: 20 foot P.U.E. adjacent toFM2818 10 foot P.U.E. along the western side of the property 10 footP.U.E. along' the northern property 'line 10 foot P.U.E. along Welsh Street may be required. Consider these easements and coordinate with the Electric Division and McCord Engineering. Guyswillberequiredinspecifi.c locations. Coordinate with the Electrictrivision and McCord Engineering. There is 8nexistingconflictalongthenorthernproperty line where the utility line .goesto 'the north of thi.sproperty, and where a guywillbere.quired,which JDustbeaddressed. Furllishdesired point of service. load requirements, letter requesting underground service and any other requirements to the Electric DivisioD and McCord Engineering as soon as possible so that materials and supplies c'an be ordered. ENGINEERING (David Pullen', ....City,Engineer): Additionalin.formationregardingtheimpact of the p roposedprojectom.existingutilit ies,stormdra inage management, and the boundaries of the flood plain must be provided for Engineering to evaluate the site plan completely. The applicant was encouraged to build in the fringes of th~ floodplain and to avoid the floodway, wbichwould remove the necessity of a permit from F.)!:.M.A. Thepr,operty would stillbeen'cumberedbyflood plain, but additional permits would not be required. Proposedac.cess has been reviewed and has . been found to be 'satisfactory. PUBLIC SERVICES '{Jim Smith, Landfill,Superintendent): Dumpsters have not been addressed con the proposed site plan. If dumpsters will be required on this site, coordinate location, access, numbers and sizes with Jim Smith of the Public Services Department. If. the applicant proposes to gather all the trash from this site and transport it to the dumpsters located at the high school facility, please supply a let'ter of".' .intent. , ..."...,..-",;........,....,... ..-...........'....--'''" ..,.._~._,;,M~'~_"""''''''';'''''-''''''..''. .,,,..~-..._"" .............,......&.;,-..._ .....~,~,;,...,. .........._~~._--_........:.:_~..,,--"-"-""-~_.-_--_...-_...._..-...-.r-...._,4WI<'~......~~~__....~__._...,........._......'~~~401 ..J' .' GENERALTELEPHONE {LaVern>Akin): Supplytelephone service requirements, including location of service on the building (which must be within 20 feet of a power. supply) ,,~hether termination point will be outside or inside. The existing telephone lines runningthrough~ the western part of this property will be relocated along the northern pr-.opertYl.ine~nd~~ollg Wel$h"St;reet ..A.ppl.idcan.t .w.asad.vised, to bring-2--2ttconduits with pull strings to the right-of-way of Welsh Street. PLANNING (Jane Kee,Sr.Planner & Kim Johnson,Ass't.Planner): Show the dimension from the property line along Welsh Street to the field house. Minimum requirement is 25 feet.. Island requirements in the parkinglothavenotbeeinmet. When thoseis.landsareincluded, 11 parking spaces will be lost. Coordinateparking?equirementswith theZoni*g Official. Include a table with parking tabulations , ibotih on- site and off-site,onthesite plan. Theparkingspaces/eirculation isle dimensions can be reduced to 20'- 23' - 20' (oriS · with 2.' overhang) if! the applicant. desires. - Anyproposedsignage should be included on\the site plan/condltional'usepermitappl-ieation '. to be considered by the Planning, & Zoning Commission. Ifsignage:isnot included on this.proposal,any future .signage willrequireaddi t ional pub lie he arings ,and us epermi ts . Landscaping: Applicant was advised that points for an irrigatedfootballfieldwillnotb.e allowed. Ther,eisa minimum requirement for the s iteas proposed <of 20 ,880 poin"ts t with'at leastone.....halfof thepoints'beingicomprised ofcaXloPY trees. ApplicantwasadditioDally advised that it might be prudent to extend the areadtobe considered toward landscaping points to include the densely treed area along 'FM2818,s.so those existing trees (ifgenerallyidenti fied) can beappl~edtoward the required point total, thus reducing the other requiredlsndscapingtpplantingswhichare "reasonably dispersed throughout thedevelopmentt'and could result in reducing th~moniesexpended forlan:dseaping. Includes legend on the site plan to identify landscaping symbols used in the plan. .. Include a note addressing proposed irrigation system. If hose bibs are planned, show the location of each, whichsh~uldbe within 150 feet of p lan.ti ngs. PLANNING & ZONING COMMISSION (Lynn Col~on): "_.C<>'JIlm~~s i.o~~~C() lson h~dq\les t i()n$r.ega.r(jing the.p,roposed location of bus parking, which were satisfactorily addressed by the applicant. The Commissioner also cautioned the applicant to allow ample room for bus parking 8.ndthemaneuvering of those vehiel.es. Applicantwasa;dvisedtorevise,'hisproposal."and' supply the information requested on 10 copies of the site plan prior to 4:00P.M,. Frid13.Y'.Oetober 14.1988, "and after receipt of same, the <formaIP.R.C.review.of the project will be scheduled for lO:~OA.M.Wednesdaf,October19, 1988. xc: Review attendees: 'DavidBrewer,Jim Holster, Robert Payne, Constanti.neBarbu, Earl'Havel, Larry Wells, Lynn Colson., . David,. Pullen, Harry Davis, .Jane Kee,KeanRegiste~, Kim .Johnson.andShirleyVolk. Copies also sent to Bill Riley, Ray Ha'vens. LaVern Akin and Coy Perry wh,o were unable to attend the preliminary review of the project, ,~ 't :~ 'i.I.~CITY 'OF COLLEGE STATION ".ii ,', , ,', ,PLANNING DIVISION .. ',., ' .", , ' ,Post Office. Box 9960 ' 1101 Texas Avenue ColI e geStati on,Te xas77 842 -0960 (409) 764...J570 MEMORANDUM HAIRWSiArchitects,7667 EastmarkDrive. C.S.,TK. David<lJrewer,C.S.I.S "iD., 100 Anderson , C. S., TX. Larry Wells, M.D..G.,' 203 Holl eman,C .8. ,TX. pr;,.....'.,,','.,...,.:,.,lD,e.,..,....,'.'.C,'..,.'....~"',".'"..~,..,'....~~..,...,'...,,..,.:,.,.., 8.V..",',w...i,....,..,'....=.., ;..,..c.,..." =...,....m.1....",.,..rm,."..", e.i,......c,t....". :"....'".,o.e...".'.,.,,';,. :...",O..'..f,-, c..,.-,':.....,p,.:.-,...'.-,..,l.,.'"......,:.,.8.'.., "..,.,'~, -ri irig,..~......,~,-..,.,..s:0".-,,',' .... .',' David Pullen,C itYEngineer:o' ,'i\ LynnColson,P&Z ...,Representa.tive" _ TO: FRO.M--:---..._.~.__. Others."attending: Harry Davis, Fire Marshal Co,y,.Perry,'.....Building. ,.Offieial Jimmy ,McCord, McCord Engineering Co.: Electric~al) Bill' Ri ley ,Wat er .&.S:ewerO'perationsMan ager .JimSmitn,PublicSer\'ices,S(\lid Waste Supt. .Jane Kee,Senior P~an:ner " KimJohnson,Pla.DniIlgAssistant LaVern Akin, GTE "'."Erwin Lehmann" >En~r.. ,Ass,t..Water Distribution -'~RobertPayne, <HAlllWSArchitects Constantine Barbu, 'HA/RWS'Architeets Earl..,..Havel",MD~G Shirley. .Volk, P1.anning..,Technician k SUBJECT:" :....,.,Conditio.nal,"Use..'Perm.it/Site-Parking/Sign Plan Rt!view - HighSchooIStad'iumSite-W-elsh & FM2818(88-707) !t!!.!.b.~!.N G--1!I VI. ~!Q.H - The gates on the fence must open out. P.R.C. (88-707) 10-19-88 Page #2 &!~ There is. "'no>'problem wi.ththi:s proposa.l sin,ce -th-ere---are no requirements for external telephone service at this time. The request made at the meeting of October 12th for 2- 2ft condulits is not required.. However, if the need arose and external telephone service was required, GTE would have no means for entering the. building . Therefore,1-2ttconduitplacement should be considered for future telephone entrance. The gates in front of the dumpster must open out. .. - . Some means of securing the gates ,in ,an open.. posi tion while loading/unloadingthedumpstermustbe provided. The applicant should be aware ,that the City will not b.e responsib.le for .any damage to th<egates. ~L~.CTRICAL DIVISION .'." Coordinate reloca~ioQ of an e.xisting utility pole and required easeme'~ size and location with Electrical Superintendent, Ray Havens. T.he necessary easement along Welsh Street can be addressed on the plat which."willbe forthcoming. FIRE DEP4.RTMEN! The fire hydrant inside the complex must be outside the gates Ifenced area. Al thoughthishydrantdoes.not,provi de coverage to all parts>ofthis facility within the required 300 foot .distance,.. itwill>beacceptabledueto .the .,natureand . ", ..... ...... - .f,r.e qu enc.'Y:--O.f.. ,u se... .-of. ,th is. ..f-act..l.i.ty. The area on the northsideof,~he>stadiumbetween,the fence and,..the.. ,concession stand be ,should reserved for,' interior eDlergen.cyaccess, wi>th' no parking allowed. Coordinate signage or stripping with the Fire Mars:hal,Harry Davis. The fire lanes as proposed are adequate. ""; . i. " .' P .R .C . (88 -707) 10-1'9-88 Page #3 .!:kANN I !{q._DIV IS! 0 N Plannin,g.Di-re.ctor Call.away 'men.tio.ned..,., that"th-e...seat-ingHn.umb_e~r.8-_. and parking space numbers had been revised, with fewer seats and required parking being the result. If a sign is tobeconsideredwith this siteplan/C.U.P., provide an elevation which includes the proposed square footage and the height of the sign. ~and~c..~~ing. Tabulation shown on pointsfor.treesis incorrectjplease revise. SizesofCr<ape Myrtles and Indian Hawthornes . should ,.. be changed.. Existing.trees.tobeusedtoward landscaping points. must,beba.rricad,ed ,before any grading begins., Provide barricQ.de details., Coordinate all landsciaping requirements with Kim Johnson, Planning Assistant. WATER & SEWER,DIVISION Furnish inform'itt,tgn covering how sanitary sewer service will be pre>vided te> the concession, stands and restrooms.Manholes m8ybe~equired. Coordinate .With ,.the Operations Manager, Bill Riley. . The 2 fire hydrants cannot be serve d fromtheexistin.g 6"1 i ne as proposed. Redesign plansand<coordinate with the Water & Sewer .Division. Location of the 15ttsanitarysewer line under the stadium and . tract cannot 'beappr'o.vedwithinforma.tionprovided. MaIntenance access to the line could disrupt activities and damage surfaces for extended periodsof"time. . '!lNG I.NE.ER ING__.D.I;.oV.ISI.QH__-c-. _.._,; City Engineer Pullen voiced serious concerns regarding the 15tt sanltarysewer line which ls proposed to be located under the stadi'um/track. He <expl'a.ined that if that line is,.,," left in that 1 ocation,<anddany t ypeofp roblemwou Idoccur,th.epub lic healt!hcouldbeendangered, events would hav,etobe reschedule for ,indefinite lengths of time, etc. His recommendation was that the line >shouldbemoved.A completeengin.eeringrepoJrt coveringsoi lsinves tigationis r,equi re.d. Mr . Pullen pointed ".out that the proposal still appears to impact the flood plain and adjacent properties. Approval from F.E.M.A.willberequiredifthereisanyinfringement into .. P.R.C. lO-19~8:8 Page #4 the floodway. A complete report will be required before evaluation can be made to this proposal. Mr. Pullenann()unced as a voting m~JBber of theP'Il'C" that if ., votesreg'ar-diIlg '-anytype-'- otHrec-ommendationwei~t'e . cast' "on . this - project at this meeting, he would have to abstain from casting a vote in either direction because he has not received enough information to completely evaluate the proposal as it-applies tothesanitarysew~r runningund.~rthe stadium/track and the impact the project may have on the' flood plain. r.R. C...!lECOMMENDATION TheP~R.C..v()ting .members agreedto...,.."forward".this .project to the Commission foreonsideration on the advertised date, with.. _ any recommendation or position pending the resolution of the problems listed. SUBMIT-IO.C.OPIES OF REVISEDPLAtlS TO THE PLANNING DIVISION BY NOON ON FRIDAY, OCTOBER 28, 1988, TO BE' INCLUDED ONTHEP&Z AGENDA FOR NOVEMBER 3, 1988. .. 't;. ~ October 12, 1988 MEMORANDUM TO: HA/RWS Architects, 7607 Eastmark Drive, C. S., T.X. David Brewer,C. 8. I.S. D., 100. Anderson, C .8., TX Larry Wells, Municipal Development Group, Hollelnan FROM: Jim Callaway, Director of Planning SUBJECT: Prelim,inary Review of 8i te Plans - High School Stadium Site - Welsh & FM2818 (88-707) Furnish meter location and load requirements. ~. FIRE' DEPARTMENT(UAUq ))A'h~ Show fire hydrant location. All structures must be within 300 feet of a hydrant. After .determination is made regarding a definition of the seating area, requirements jeor the seating area will be made. Certainlytherestrooms alld ,,:;:the concession stands must be located within 300 feet of a. '<:(\hydrant. Emergency vehicle access will be required. Specify location of access and comply with minimum standards. Considerationsho.uld b.e made regarding inclusion of both the football stadium and the baseball field. Coordinate requirements with the Fire Marshal's office. If Fire Lanes are required, coordinate locations and requirements w~~h the Fire Marshal's office. .., EL E C T R IC D I V IS 10 N{::f 1/1\ fhCCtJ.et>, ~i> E AoIq f ~eJ.uq). Easements will be required around the entire perimeter of the property as follows: 20 foot P.U.E. adjacent to FM28l8 10 foot P.U.E. along the western side of the property 10 foot P.U.E. along the northern property1ine 10 foot P.U.E. along Welsh Street maybe required. Consider these easements and coordinate wi th.. theiElectric Division and McCord Engineering. Guy.s' will be required in specific locations. CoordiJtlate with the E1ectricDi vis ion .andMcCord.Engineering. There is an existing conflict along the northern property iliinewheJre theuti1ity linegoes to the north of this prope~ty,and where a guy will be required, which must be addressed. Proposed access has been reviewe.d and has been found to be satisfactory. PUBLIC SERVICES (:1i M ,SN\ I .."..).: Dumpsters have not been add.ressed on the proposed site plan. If dumpsters will be required on this site, coordinate location, access, numbers and sizes with Jim Smith of the Public Services Department. If the applicant proposes to gather all the trash from this site and transport i tto tb.e . dumpsters located at the high school facility, please supply a letter of intent. GENERAL TELEPHONE(1.AtlE'eJ IJ~IN). · Supply telephone service requirements to LaVern Akin of GTE, including locationo.f service on the building (which must be within 20 feet of a power supply), whether termination point will be outside or inside. The existing telephone lines running through the western part of this property will be relocated along the northern property line and along Welsh Street. Applicant was advised to bring 2-2" conduits with pull strings to the right-of--way of Welsh Street. PLANNING/ZONING (:f8f'lE- f'eE) Kt./r') JC,*,N~AJ): Show the dimension from the property line along Welsll Street to the field house. Minimum requirement is 25 feet. Island requirements in the parking lot have not been: met. When those islands are included, 11 parking spaces will bt~ lost. Coordina.te parking requirements wi ththe Zoning Official. Include a tab Ie with parking .tabulat ions, both on- site and off-site, on the site plan. The parking spaces/circulation isle dimensions can be reduced to 20'-23'- 20' (or 18' with 2' overhang) if the applicant desires. Any proposed signage should be included on the site plan/conditional use permitapplicationtobe considered by the Planning & Zoning C.ommission. If signage is not incltlded on this proposal, any future signage will require addi tioIlal public hearings and use perm.its. Landscaping: Applicant was advised that. points for an irrigated football field will not be allowed. There is a minimum requirement for the site as proposed of 20,880 poi.nts, with at least one--half of the points being, comprised ofJ tr'ees. ~fi Applicant was additionally advised that it might be prudent to extend the area to be considered toward landscaping points to include the densely treed area along FM2818, so those existing trees (if generally identified) can be applied toward the required point total, thus reducing the other required landscaping to plantings which .are "reasona.bly dispersed throughout the development" and could result in reducing the monies expended for. landscaping. ~ .. Include a legend on the site plan to identify landscaping symbols used in the plan. Include a note addressing proposed irrigation system. If hose. bibs are planned, sh.ow. the location of each, which should be within 150 feet of plantin.gs. PLANNING & ZONING COMMISSION(L~AJNCDLSoJ) Commissioner Colson had questions regarding the prop~:>sed location of bus parking, which were satisfactorily addressed by the apP'1 icant. The Commissioner also cautioned the applicant to alle)w ample room for bus parking and the maneuvering of those vehicles. Applicant was advised to revise his proposal and supply the informatio.nrequested on 10 copies of the site plan prior to 4 :00 P.M. Friday, October 14,<1988, and after receipt of same, the formal P.R.C. review of the project will be scheduled for 10:00 A.M. Wednesday, October 19, 1988. xc: Review attendees: David Brewer, Jim Holster, Robert Payne, .Constantine Barbu, Earl Havel, Larry Wells, Lynn Colson, David Pullen, Harry Davis, Jane Kee, Kean Register, Kim Johnson, andSh.~r...l<<.x.J Volk. Copies also sent to Bill Riley, Ray Ha.vens....."''fi~ Coy Perry who were unab leto attend the preliminary review of the project. ..", October 19, 1988 MEMORANDUM FROM: HA/RWS Architects, 7607 Eastmark Drive, C.S.,TX. David Brewer, O.S.l.S.D., 100 Anderson, C.S.,TX. Larry Wells, M.D.G.,203 Holleman, O.S., TX. Project Review Committee: ' ~'~ .Jim Gall,aW,,' ay, Directo, r of ,Planning~~ David Pullen, City Engineer Lynn Colson, P&Z Representative TO: Others attending: Harry Davis, Fire Marshal Coy .Perry, Building Official Jimmy McCord, McCord Engineering Co. Electrical) Bill Riley, Water & Sew.er Operations Manager Jim Smith, Public Services Solid Waste Supt. Jane Kee, Senior Planner Kim Johnson, Planning Assistant LaVern Akin, GTE Erwin Lehmann, Engr. Asst.,Water Distribution RobertPayne,HA/RWSArchitects Constantine Barbu, HA/RWS Architects Earl Havel, MDG Shirley Volk, Planning Technician SUBJECT: Condit.ional Use Permi.t/Si te-Parking/Sign Plan Review - High School Stadium Site - Welsh & FM2818 (88-707) The P. R.C. met on this date to review the above ~eferenced. project, with the result being that the position regarding recommendation of approvalwill be pending resolution of the problems noted by the various people reviewing the proposal. If the problems are not resolved by October 28, 1988 (date packets are prepared) the Commission will be advised by staff to hold the public hearing on the scheduled date (November 3, 1988), but to table action until solutions can be reached by the applicant. ~JI.!.!!.P..!.N.G.......P..!..Y..!.~..!.Q.N. The gates on the fence must open out. P.R ~ C . ( 88- 707 ) 10~19~88 Pc3ge #2 .g..~..~. There is no problem with this proposal since there ar~ no requirements for external telephone service at this time. The request made at the meetingof.October 12th for 2- 2ft conduits is not required. However,if.theneed arose and external telephone service was _required, GTE would have no means for entering the building. Therefore, 1- 2ft conduit placement shouldbe.considered for future telephone entrance. .PJJ..~..~.!.9........~..~..R.Y..!..Q..~..~. The gates in front of the dumpster must open out. Some means of securing the gates in an open position while: loading/unloading the dumpstermus.t be provided. The applicant should be aware that the City will not be responsible for any damage to the gates. .~..~..~..Q..~..R.!J;'..~.~........P..!..Y..!..~..!..Q.N Coordinate relocation of an existing utility pole and requ.ired easement size and. location with Electrical Superintendent, Ray Havens. The necessary easement along Welsh Street can be addressed on the plat which will be forthcoming. .F..~.R.~.......!!.~.~.!.\.R..~.M.~.N..!. The fire hydrant inside the complex must be outside the gates/fenced area. Although t.his hydrant does not providE~ coverage to all parts of this facility within the requiredl 300 foot distance, it will be acceptable due to the nature and frequency of use of this facility. The area on the north side of the stadium between the fence and the concession stand be should reserved for interior emergency access, with no parking allowed. Coordinate si~rnage or stripping with the Fire Marshal, Harry Davis. The fire lanes as proposed are adequate. P . R. C . ( 88 - 707 ) 10-19-88 Page #3 .P..~..^.N.N.!..~g.......JJ..!..Y..!..~..!.Q..~ Planning Director Callaway mentioned that the seating numblers and parking space numbers had been revised,with fewer seats and required parking being the result. If a sign is to be considered with this site plan/C.U.P., provide an elevation which includes the proposed square footage and the height of the sign. .!!.!!.~..g.~.~..~.E..!.A..g. Tabulation shown on points for trees is incorrect; please revise. Sizes of Crape Myrtles and Indian Hawthornes should be changed. Existing trees to be used toward landscaping points must be. barricaded before any grading begins. Provide barricade details. Coordinate all landscaping requirements with Kim Johnson, Planning Assistant. !.^.!.~..R......~.......~..~.!'l.~..R.......Q..!..Y..!..~..!..Q..N Furnish information covering how sanitary sewer service will be provided to the concession stands and restrooms. Manholes may be required. Coordinate with the Operations Manager, Bill Riley. The 2 fire hydrants cannot beserve.d from the existing 6ft line as proposed. Redesign plans and coordinate with the Water & Sewer Division. Location of the 15ft sanitary sewer line under the stadium and tract cannot be approved with information provided. Maintenance access to the line could disrupt ac.ti vi ties and damage surfaces for extended periods of time. ~.~.G..~.N.~.~.R..~.N.G.......P..~.Y..!..~..!.Q.N. City Engineer Pullen voiced serious concerns regarding the 15tt sanitary sewer line which is proposed to be located under the stadium/track. He explained that if that line is left in that location, and any type of problem would occur, the public health could be endangered, events would have to be reschedule for indefinite lengths of time, etc. His recommendation was that the line should be moved. A complete engineering report covering soils investigation is required. Mr. Pullen pointed out that the proposal still appears to impact the flood plain and adjacent p.ropert ies. Approval from F.E.M.A. will be required if there is any infringement into P . R. C . ( 88 - 707) 10-19888 Page #4 the floodway. A complete report will be required before evaluation can be made to this propos.al. Mr. Pullen announced as a voting member of the P.R.C., that if votesregarding<any type of recommendation were cast on this project at this meeting, he would have to abstain from casting avote}iineither dir.ection because h.e has not received enough informat!ion to completely evaluate the proposal aslit applies tot,he elianitarysewer running under the stadium/track and the impa.ct'the project may have on the flood plain. P...~...R..~...Q..~....R.~.Q.Q.M.M.~..~.P.A.T..!.Q.N. The P.R.C. voting members agreed to forward this project to the Commission for consideration on the advertised date, with any reicommendation or positionpiending the resolution of the problems listed. SUBMIT 10 COPIES OF REVISED PLANS TO THE PLANNING DIVISION BY NOON ON FRIDAY,OCTOBER 28, 1988, TO BE INCLUDED ON THE P&Z AGENDA<FOR NOVEMBER 3, 1988. --zz~~ "," ,." ",. ,.~, kWf~~6QcL-f~~~'L.._,.~."" """',...'... ~, "~"",.,'" ",.,"~"S~ .~~.~lJ-,~~c(Q~~, zlrA;.3'~.'_~ qn ([ / ~[~1A)~J~;;;(,.,.""'2n "~j)~J~~m.,~. .. CKQA, ',.::. ~~./ '...'m~k""."./JT cl'~',' .'-~~lr.~..~. Ie ~m.," .'.,U.tJ,~M6i".,,~,,/~J ,.'..""m "'."'~,..,~."'..."" " ,0"" "e' ',"" ",WL.",~.~~.~j11i~~r:~~k f~ mm=~~--~~~_~_~_~~~~m~f~ . ?-~bY.en,sh4 *~JA~_..~ c JJ._WtUt~L(g ,.vp~ ",.?Zft()~ ~~JL ~.,' ,.,."., {s"..."" · ,"'_~~'~_ J2PY1~,,~,,~.~r'2ed? ..,..,.,',..._ i' .,~,(Mdd~L~'7t~_hF=,__ud~Zo/'~ ..-:t- 7" LJ,'~ '" -W~/ 1 -~Q < NCNB Texas A & M Banking Center 111 University Drive PO. Box 2860 College Station, Texas 77841 (409) 846-5721 RlCRlB Texas College Station, Texas August 15, 1989 IRREVOCABLE CREDIT NO. 710 AMOUNT $196,415.00 City of College Station P.O. Box 9960 College Station, Texas 77840 Gentlemen: You are hereby authorized to value on NCNB Texas National Bank, A&M Ba-nking Center, College Station,' Texas for account of COLLEGE STATION INDEPENDENT SCHOOL DISTRICT up to an aggrega te amount of ONE HUNDRED NINETY SIX THOUSAND FOUR HUNDRED FIFTEEN AND NO/lOO DOLLARS available by your d ra f t sat NCNB Texas Na t ionaI Bank to be accompanied by: 1. Original Letter of Credit Number 710 dated AUglJ.St 15, 1989. 2. Notification by authorized representative of the City of College Station that a default exists in an agreement between " the City of College Station <3.nd .College station Independent School District. Said Agreement insures compliance with the landscape requirements of two projects. a. Rock Prairie Elementary School Project Landscape requirement $65,340 b. A&M Consolidated High.School Athletic Complex La_ndscape requirement - $131,075 Drafts must be presented to Drawee bank not later than 2:00 P.M. on December 15, 1989. All drafts must state. on their fclce: "Drawn under NCN13 Texas NationalBankJA&MBanking Center, College Station, Texas, Irrevocable Credit No. 710. II Letter of .Credit #710 The City of COllege Station Page Two This credit is subject to the Uniform Customers and P r ac t i ce for Doc u me n tar y C red its { 1 9 8 3 Rev i s ion} International Chamber of Commerce Publication No. 400. We hereby agree with drawers, endorsers and bona fide hold.ers of drafts drawn under and in compliance with the terms of this credit that they will be duly honored on due presentation to drawee. RWW/lsh College ..Station IndependenlSc.hool District Excellence In Education--An Investment In The Future August 4,1989 Mr. Jim Callaway Director of Planning City .ofColleg eStation P. O. Box 9960 College Station, Texas 77840 RE: Letter of Intent to Meet Landscaping Requirements as. Established for College Station ISO Sports Complex Dear Mr. Callaway: This letter is to. notify the City of Callege Statiano.fthe College Statio.n Independent Scho.o.l District's, intent to. fullyoomply with the laodscapingrequirements established for the Sports Complex beingbuHt at 2118 Welsh . The landscaping plan already submitted to the City was included in the construction contract for the facility · All shrubs which c~n beplC!l1tedat thistirnewiU ib~pl~nted priarto. September 1, 1989, as per the canstructio.n,co.mract.. Tpe DistrictdaesfarmallY,request. a temporary delay inoompleting the planting Qftrees, because of the time o.fth~year and the patential loss of trees. It is felt by aU that the planting of trees at this. time would result in a significanlloss of new trees. . The trees are included in the construction contract and as soon as conditions will permit, the planting aftrees in the final phase at lpe q()l1structio.n co.n.ract will be, implemented. The District .does. formally request .considerationof.this situation in its. approval for the occupancy and use of the .. sports facility. Sincerely, Wd/~~. Rayl. Chancellor Superintendent cc: ,David Neal, Assistant Superintendent for Finance Ross Rogers, Athletic Director RlClmlg 1812 Welsh Street College Station, TX 77840 409-764-5400 Ray L. Chancellor . Superintendent <r (!y~:S \ January 19, 1988: I met with Dr. Brewer before the Bond Ele:ction to discuss drainage problems on the site. \... February 20, 1988: Bond Election t..., March 9, 1988: Met again wi th Dr. Brewer and again discusse~d drainage on site. Dr. Brewer informed me tllat they had gotten an estimate on ,,,hat the drai.nage would cost from an architect.. I explained to Dr. Brewer that I did not feel that the estimate was reasonable. ~ September 13, 1988: Staff presented application for variance (sprink'1ers & restrooms) to Bui Iding Code Board of Adjustments. "",, October 19, 1988: P.R.C. - Preliminary Plat only - No construction, site, drainage or utilities~ plans available this date. .., October 31, 1988: Staff presented application for variance (restrooms)to Building Code Board of Adjustments. 'November 3, 1988 : Conditional Use Permit issued - conceptufll site plan only - no drainage plan shown. P&Z approved. ----. December 20, 1988: Architect releases ltplans(?)ltto Contractors. ~fm-it~~--~el~im-riiarr~~~~~ /~i~latiQD ~iA~~. ..,'" January 10, 1989: -..,,- January 17, 1989: ~ January 17, 1989: Bids opened. Contract awarded. Permit Application received by Building Division. No approved site plan was included. Drainage and utility plans were not appr()ved. -'-- January 24, 1989: Mark Smi th met wi th Earl Havel (M. D. G.) flnd Jose Quiros (C.R.G.) to discuss drainage~ Mark issued Drainage Development Permit based on receipt of an erosion control plan and a plan sheet showing concrete lined channel. January 30, 1989: Utility plans were approved. """.~",~_"February 3, 1989: Drainage plans returned with concrete 1 iIling shown. Drainage construction and plans were appr.oved..~ February 8, 1989: Slab only permit issued. *Still don't have approved set of plans with complete construction plans with drainage, utility and site plans attached. February 16, 1989: At my urging David Pullen and Mark Smith met with Dr. Brewer to discuss status of entire project, and made him aware of all situfltions that were developing. Pullen offered drainage development agreement that could accomplish one of these alternatives: .(1) Postponing lining, (2) Plat with no easenlent, (3) Variance from Zoning Board of Adjustment February 28, 1989: Coy, Mark, Bill Riley, Phil San Angelo IBet with representative of architect to discuss problems. March 1, 1989: See letter attached referencing the above meeting. March 2, 1989: Building Division received complete plans. Meeting was set up on March 3, 1989 for 10: 00 A. M. March 17:, 1989 to meet about problems and possible solutions to drainage situations. NOTE: When an .ownerhires an architect and/or engineer, th.~ City assumes its working relationship will be with those professional people, that they will adhere to City Standards, and keep tlleir client informed as to the status of the project. .I ". ~:t!;1!Q.R~~.P_UM. TO: Rober t Payne - Hol ster ',~s: Assoc. FROM: Coy Perry - Building Official DATE: March 1, 1989 SUBJECT: CSlSD Athletic Complex' Meeting of February 28, 1989 1. Electrica.l -Pole at Drive.way Driveway has been moved about 2 1/2 feet from the pole. 2. Plumbing -.Clean'outs 250' from manhole and every 75' after that. Waterlines have been approved &F. H. lines under utilities plans. All other plumbing will be inspected by the Building Department. 3. Approved site plan <-3 sets Rework drainage & uti li,t i es pI ans 4. Firel anassh.a 11 be approved by Harry Davi s. 5. Welsh Street must be kept clean. IYrJ;AlJ" l.,() t:-"/ t;:-- j/'I j:"'6tr ~\ f;lp-!>J. tt utl'~ tJ~ . ~/V r1+k~'V to. ):-/4L--~f;~~(v~ ( 8tk~i..fj)~.9 M8V~ ;1&, e;tt-H/' /,~..f ,J ...,' /7 (}tt~~62~t' ;1t ~'.~I .i CITY OF ,COLLEGE STATION ~,.~ . " ,PLANNING DIVISION .'.',' ""." '.", .'" PostOffice Box 9960 ',' ".', "'1101 Texas Avenue College Station, Texas 77842-0960 (409) 764-3570 October 12, 1988 MEMORANDUM TO: HA/RWSArchi.tects, 7607 Eastmark Drive ,C. S., TX. Da.vidBrewer', ;"'C.S'.I.-S'.D.','lOaAnderson, c.s. ,TX Larry Wells, Municipa.l Development Group, Holleman FROM: .Jim Callaway, Director of Planning~ SUBJECT:PreliminaryRevlew.ofSitePlans- High School StadiumS ite -W,elsh& >FM2818 (88-'107) A preliminary review of the subject proposal was made on this date by teehllicalpersonnel,e.onsll1tants and P&ZCommission representatives with the following suggestions and comments res'ultillg: .LONESTARGAS COMPANY (Kean Register): Furnish meter location andl'oadrequirements. FIRE DEPART.MENT(HarryDavis,Fire Marshal): Showfirehydrantloc.ation. Allstructure's must be within300feetofia.hydrant. "After determination is made regarding a definition of the seating area,requirements for the seating area will be made. Certainly the restrooms and t.heconcess.ion stands must be located wi thin 300 feet ofa hydrant. Emerg.,ency vehicle access will be required. Specify location of access and >complywithminimumstandards. Consideration""should 'l>e .,..mad.e',.,..regarding. inclusion of both the football stadium and the baseball field. Coordinate requirements with the Fire Marshal's office. If Fire La.nes<are.required, coordinate locations and requirements with the Fire Marshal's office. ELECTRIC DIVISION (Jimmy McCord, McCord Engineering): Easements will be required around the entire perimeter of the property as follows: 20 foot P.U.R.adjacent to FM2818 10 foot P.U.E. along the western side of the. propert Y' 1.0 foot P.'U.E. a-long ..the '-northe'r-npro'pertyline 10footP.U.E.along Welsh Street maybe required. Consider these easements and coordinate with the Electric Division and McCord Engineering. Guys will be required in specific locations. Coordinate with the Electric Division and McCord Engineering. There is anexistingconfliet along the northern property line where theutilitylinegoestothenor.th of this property, and where a.guywi Ilberequired,which must be addressed. Furl1ishdesiredpoint of service,load requirements, letter requesting underground service and any other requirements to the Electric Division and McCord Engineering as soones possible so that materials and supplies can be ordered. ENGINEERING (David Pullen, City Engineer): Additional information regarding the impact of the propo.sed projtlctoD>exis ting ut i lities,stormdrai nage man.agem.en t , and the boundar iesofthefloodplalnmus t be provided,fo,rEngineeringto evalua.te the ,.siteplan ,completely. The applicant was encouraged,tQbuild in the fringes of the floodplain aDd to av.oi.dthefloodway, which would remove the necessityofa permit fromF.E.M.A. The property would. still be encumbered by floodplain, but additional permits would not be required. Proposed a,ccess has been reviewed and has been found to be satisfactory. PUBLIC SERVICES (Jim Smith, Landfill Superintendent): Dumpsters have not been addressed on the proposed site plan. If dumpsters will be required on this site, coordinate loeation,access,numbersandsizes with Jim Smith of the Public, Services Department . If the applicant proposes to gather.all the trash from this site and transport it to the dumpsters located at the high school facility, please supply a letter of intent. GENERAL TELEPHONE (LaVern Akin): Supply t~lephone ,service requirements, including location ofservlce<onthebuilding (which must be within 20 feet of a power supply), whether termination point will be outside or inside. The existing telephone lines running through the western part of thispropertywi"ll be relocated along the. northern pr,op~I.'ty ~;J;l.~.,J~:r14 .fl~ong W~lshStreet.. Applicant was"advised to bring 2- 2ttconduitswith pull strings to the right-of-way of Welsh street. PLANNING (Jane Kee,Sr.Planner & Kim Johnson,Ass't.Planner): Show 'the 'dimension from.'.' the, property linealong,.....Welsh Street to the field house. Minimum requirement is 25. feet. Island requirements in the parking lot have not .beenmet. When those islands are .' included, 11 parking spaces wil1be lost. Coordinate parking requirements with the Zoning Official. Includea.table with parking tabulations,: both on- site and off-site, on the site plan. Theparkingspaces/eireulatioD isle dimensions can be reduced to 20'-23'- 20' (orlB' with 2' overhang) if the applicantdes,ires,. AnyproposedsignageshouldbeineludedoD\the site plan/conditional use permit application to be considered by the Planning & Zoning Commission. Ifsignage is not included on.thisproposal,aDYfuturesignage will require additional public hearings and usepermits~ Landscaping: Applicant was advised that points for an irrigated football field will not be allowed. Ther.eis a minimum requirement for the site as proposed of 20,880 points. with at least one-half of the points being comprised of canopy trees. Applicantwasaddit ionally .advised . that it might be prudent ,to extend the area to be considered toward landscapingpoints.toinclude thedensely>treed ,area along FM2B18,sothose .existing trees (if generally identified) can be applied toward the required point total,. thus reducing the other require.dlandscaping .toplantings which arett reasona'b ly disperse.dthroughoutthedevelopmenttt and could resul tin reducing the monies expended for landscaping. Includes legend on the site plan to identify landscaping<symbols used in the plan. ~ .. Include a note addressing proposed irrigation system. If hose bibs are planned, show the location of each, which should be within 150 feet of plan-tings.. PLANNING & ZONING COMMISSION (Lynn Colson): commissiQnerColson had questions regarding. t,he.proposed 1 ocat i,onofbus .. parking, wh ichwere sa ti s factor i1 y addressed by the applicant. The Commissioner also cautioned the applicant to allow ample,roo.m for bus parking and the maneuvering of those vehiel.es. 'Applieant was advised. to revise his proposal and supply the information requested on 10copieso,fth.esiteplan prior to 4:00P.M. Friday, 'Oetoberl4, 1988, and after receipt of same, the" formaIP.R.C. review of the project 'will be scheduled for lO:OOA.M.Wednesdar, October 19, 1988. xc: Review attendees: David Brewer, JimHolster,Robert Payne,CoDstantine'BarbutEar1Havel, Larry Wells, Lynn Colson,DavidPullen, Harry Davis, 'Jane Kee, KeanRegister D Kim Johnson, and Shirley Volk.Copies als.osent to Bill Rlley,RayHavel1s,LaVernAkinandC.oy PerrY1wh,o were un abl e to attend the preliminary review of the proj ect',