June 8, 1988
MEMORANDUM
PRESUBMISSION CONFERENCE
TO:
FROM:
* Review plat prior to meeting and noted no problems. Coordinate
service requirements with those listed.
of the revised plat by noon
on the agenda for the P&Z
**Any changes to an approved plat must be cleared through the
Planning Division.
POST OFFICE BOX 9960 1101
COLLEGE STATION, TEXAS 77840
RE:
TO
GENTLEMEN:
WE ARE SENDING YOU
o Shop drawings
o Copy of letter
ltJ/fi1't~~hed 0 Under sepa rate cover via
D Prints
D Change order
the following items:
Specifications
COPI ES
DRAWING NO.
cO,9DESCRIPTION
;"
THESE ARE TRANSMITTED as checked below:
REMARKS
rned for C:::O;L
o Resubmit _ copies for review
o Submit _copies for distribution
o Return _ corrected prints
o For your use
o As req uested
..._",;
"
#
JOE ORR,INC.
Surveyors & Engineers
Office Phone 690-3378 . Rt. 3, Box 413
COLLEGE STATION, TEXAS 77840
10' utility Easement
Southwood Forest
Crawford Burnett League
College Stat~on~ Texas
10 June 1988
Alltha t>certaifitract> or . parcelbflaridlyirtg ....andbeingsittia.ted. in
the Crawford B.urnett League . in College Station, Brazos County,
Texas, being apart ofthosetractsconveyedtoW.D.Fitch by deeds
recorded. in Volume 542, Page 5.26 . of the Deed Records of Brazos
County, Texas, and Volume 1040, Page 240 and Volume 779, Page 583 of
the Official Records of Brazos County, Texas, and being more
particularly des.cribedas follows:
Commencing in,th.esouthwest line of the said W. D. Fi tchtract, which
is also the southeast line of Southwood Forest Phase Two addition t9
the City of College Station, Texas, S49014' 53" E - 945.00 feet
from the mo.steasterly corner of Southwood Valley section 25C
addition to the City of College Station, Texas, according to plat of
record in Volume 830, Page 419 of the Official Records of Brazos
County, Texas.
ThenceN 40045' 07". E - 187.34 fe~t,~:l()pgtlJ~ ~,()'U't.h~,ast line of
Southwood Forest Phase Two to the southwest line of Camille Drive;
ThenceN 370.18' .47"E- 50.01 feet continuing along the southeast
line of Southwood Forest Phase Two'and across Camille Drive to the
south corner of >Lot6in Block 69 of the said Southwood Forest Phase
Two and thePoin tof Beginning 'ofthis .tract;
T.hence N 50017'38" E - 423.6'0 <feet continuing along the southeast
line of Southwood Forest Phase Two to. an angle point;
ThenceN 220 36' 16 liE - 180.0.0 feet continuing along the southeast
line of Southwood Forest Phase Two to the east corner of Lot 2 in
Block 69;
Thence S 670 23' 44"E
10 .00 .' feet;
Thence S 220 36' 16" W -<182,.,46fee.t 'parallelntoandn"lO feet .... from
the southeast line of Southwood Forest Phase.Two to an angle point;
Thence S 50017' 38"W-424.00 feet continuing parallel to and 10
feet from the southeast line of Southwood Forest Phase Two to the
northeast line of Camille Drive;
Thence N 51022 >' 43"W -- 10.21 feet along the northeast line of
Camille Drive to the Point of Beginning and containing 0.14 acres of
land more or less.
11 .'. r,'i/~jJ~,~i~;~:~~(;i);,
t ( !' 'J'lvJlJJ:ffJ l:"~,::: J
Ag"- .,,-< ~.~!~ ~Y:f!~)."{: , 15:;0. Y ,,) . ;~'
'1>..' ',,'1 ,. _ ='
~.~
CITY OF COLLEGE STATION
I? O. BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77842-0960
(409) 764 - 3500
August 23, 1988
Mr. W. D. Fitch
Area Progress Corporation
2108 Southwood Drive
College Station, Texas 77840
RE: SOUTHWOOD FOREST PHASE III
Dear Bill,
The construction entrance at the Gail Place and Rio Grande
intersection that you requested in your letter dated Aug. 22
has been granted.
I look forward to reviewing the plans and specs for the
completion of Phase III.
... ifjere~, ?JI-d
DaVi : Pullen, P.E.
City ngineer
DJP/vw
cc~anning file
Home of Texas. A 8M University
AREA PROGRESS CORPORATION
Residential and. Commercial Properties
2108 SOUTHWOOD DRIVE
COLLEGE STATION, TEXAS 77840
TELEPHONE 409/693-9112
August 22, 1988
Mr. David Pullen
Ci t'y Engineer
City of College Station
P.O. Box 9960
CollegeStatioD, TX 77840
RE: Temporary Entrance at Phase III Southwood Forest --
Gail Place & Rio Grande
Dear David:
It has been brought to Otlr attent.ionby the residents of
Southwood Forest Phase One that the construction activity on
Phase Two has created some inconveniences ;>for them. After our
'init,ial inquiry into their concerns, it becanle clear that we
'sliou'ld take some action to relieve the conge,stion thatesixts
there.
We propose to construct, w~th your permission, a temporary
construction entrance to Pllase Two an,d Three of Southwood Forest.
.' .,.<';his entrance would be located at the Gail Place and Rio Grande
I.ntersection as indicated on Exhibi tOne. We believe tIlis
temporary entrance would relieve much of the congestion in Phase
One.
We also feel that the wear and tear on the streets in Phase
One would be diminished, and as a bonus we would better control
.the aCCUDltllation of mud and debris on the roads. Our temporary
construction entrance would consist of removing approximately
60 LF of curb at Rio Grande along with t,he sidewalk and the
installation of a30" temp. culvert. We would, of course, close
theent,rance w,hen. construction at t,he permanent ent,ry structure
is scheduled and approved.
Please feel free to call me at any time should you have any
questions. We appreciate your consideratioll ontl1is request.
SincerelYt
~~~
Dan B. Sears