HomeMy WebLinkAboutMisc.~7r`~/~
St. Thor~as Aquanas
Candi tional Use Perini t
AMOUNT DU $25.00 + $6.00=$31.00
APPROVED:
November l~, l~~?
MEMORANDUM
T4; Holster & A~so~iates, ?~0? Eastmark Drive, C.S.
St. Thomas Aquinas Catholic Church, 81x1 E.Bypass
FROM Project Review Committee
Jim Callaway, Director of Planning
David Pullen, City Engineer
Drug Moore, P&Z Representative
Others attending;
Laverne Dube, CTE pre-meeting review}
Kim Joh~~son, Planning Assistant
Jane :Kee, Senior Flamer
Kean Register, Lame .Star has
Rey Havens, Electrical Superintendent
To~~ l~iehalsky, Electrical Department
~i11 Ri~.ey, water ~ Sewer Department
Tina Ocan, Public Services Department
Cry Perry, building O~'ficial
Blend Ellen, Assisten~ Fire. Marshal
Shirley volk, Planning Technician
SUBJECT; Conditior~s.l Use Permit ~- Phase III parking. lot addition
to the e~i~ting facilities at St. Thomas Aquinas
.Catholic Church at 8101 East Bypass..~$7-?l~}
There was no repre~entatian .far .the applicant or owner of
property at this meeting.
The P.R.C. only hay the .authority to approve site plans if all
ordinance. requirements are met. The P.R.C. met an this date to
review the subject revised proposal and approved the proposal
with the fallawin~ canditions~:
~~,. Electrical Superintendent Havens.. re~,uest~d an easement to
~over• the existing underground electric service which crosses
this portian of the property.
2, Bill,. Riley of the water ~ Sewer Department requested ail
easement to cover the existing service water line crossing this
property to ..the fire hydrant,
~ City Engineer David Pullen stated compliance with the F.R.C.
Drainage statement ~rhich acccmpane~ ~th~ report is required.
4. Haan Register cf Long star Gaa Cc. indicated. he has na
prcblem~ with this prcp~~~l, but~advi~ed the applicant tc c].a~ely
cc~~rdinate requirements with this company,
5• Senior Planner fee stated that end i~land~ are. required tc be
a minimum of 380 ~quarefeet in ~.rea, and that the revised plans
should shaw.the l~ca~ticn cf hose bibs, or reflect that an
irrig~.ton system will be used.
6, P&Z Representative Doug Mccre stated he has no problems with
the plan,
~, Director of Planing Jim. Callaway requested that the
applicant furnish ~ copy of the agreement reached with the
~'e~tinghcuse Corporation regarding sh~.red acce~~ from the private
drive,
SUBMIT l~ C4PIE~ 0~' REVISED SITE PLANS TO THE PLANNING DEPARTMENT
BY NOQN CN-NQVEM~ER 5TH IN ORDER TO BE INCLUDED ON THE AGENDA
F~DR THE P&Z MEETING CF DE~EM~ER 3, 198?.
Any changes to an approved site plan must be cleared thr~-ugh the
Planning Divis3.nn.
PRC 87-?10 11-18-8? Page 2
We Transmi : {~ erewith {) under seRarate cover vi a
{) in accordance with your request .
. - • ~'"re ord ( )use
For. Your. Oapproval O d~stnbution to parties (l information ( review ~ comment { c
{)
The Falfowin : { drawin s ( ) s ecfications Ochange order {)shop drauvings Oproduct literature
9 9 p
Osamples (~ correspondence { .~
;.
i a
~;
`: .: ~
l~~ ~ %._
i~ ,:
r ~ .~ / °~
~ ~ ~ ~~~
_~
,..
~~~ ~~
~ ~ .
~~
a
•:
~ i
f ,~ ~.
~. ~ ~ ~
- ~ _, _. __
~. I