Loading...
HomeMy WebLinkAboutMisc.~7r`~/~ St. Thor~as Aquanas Candi tional Use Perini t AMOUNT DU $25.00 + $6.00=$31.00 APPROVED: November l~, l~~? MEMORANDUM T4; Holster & A~so~iates, ?~0? Eastmark Drive, C.S. St. Thomas Aquinas Catholic Church, 81x1 E.Bypass FROM Project Review Committee Jim Callaway, Director of Planning David Pullen, City Engineer Drug Moore, P&Z Representative Others attending; Laverne Dube, CTE pre-meeting review} Kim Joh~~son, Planning Assistant Jane :Kee, Senior Flamer Kean Register, Lame .Star has Rey Havens, Electrical Superintendent To~~ l~iehalsky, Electrical Department ~i11 Ri~.ey, water ~ Sewer Department Tina Ocan, Public Services Department Cry Perry, building O~'ficial Blend Ellen, Assisten~ Fire. Marshal Shirley volk, Planning Technician SUBJECT; Conditior~s.l Use Permit ~- Phase III parking. lot addition to the e~i~ting facilities at St. Thomas Aquinas .Catholic Church at 8101 East Bypass..~$7-?l~} There was no repre~entatian .far .the applicant or owner of property at this meeting. The P.R.C. only hay the .authority to approve site plans if all ordinance. requirements are met. The P.R.C. met an this date to review the subject revised proposal and approved the proposal with the fallawin~ canditions~: ~~,. Electrical Superintendent Havens.. re~,uest~d an easement to ~over• the existing underground electric service which crosses this portian of the property. 2, Bill,. Riley of the water ~ Sewer Department requested ail easement to cover the existing service water line crossing this property to ..the fire hydrant, ~ City Engineer David Pullen stated compliance with the F.R.C. Drainage statement ~rhich acccmpane~ ~th~ report is required. 4. Haan Register cf Long star Gaa Cc. indicated. he has na prcblem~ with this prcp~~~l, but~advi~ed the applicant tc c].a~ely cc~~rdinate requirements with this company, 5• Senior Planner fee stated that end i~land~ are. required tc be a minimum of 380 ~quarefeet in ~.rea, and that the revised plans should shaw.the l~ca~ticn cf hose bibs, or reflect that an irrig~.ton system will be used. 6, P&Z Representative Doug Mccre stated he has no problems with the plan, ~, Director of Planing Jim. Callaway requested that the applicant furnish ~ copy of the agreement reached with the ~'e~tinghcuse Corporation regarding sh~.red acce~~ from the private drive, SUBMIT l~ C4PIE~ 0~' REVISED SITE PLANS TO THE PLANNING DEPARTMENT BY NOQN CN-NQVEM~ER 5TH IN ORDER TO BE INCLUDED ON THE AGENDA F~DR THE P&Z MEETING CF DE~EM~ER 3, 198?. Any changes to an approved site plan must be cleared thr~-ugh the Planning Divis3.nn. PRC 87-?10 11-18-8? Page 2 We Transmi : {~ erewith {) under seRarate cover vi a {) in accordance with your request . . - • ~'"re ord ( )use For. Your. Oapproval O d~stnbution to parties (l information ( review ~ comment { c {) The Falfowin : { drawin s ( ) s ecfications Ochange order {)shop drauvings Oproduct literature 9 9 p Osamples (~ correspondence { .~ ;. i a ~; `: .: ~ l~~ ~ %._ i~ ,: r ~ .~ / °~ ~ ~ ~ ~~~ _~ ,.. ~~~ ~~ ~ ~ . ~~ a •: ~ i f ,~ ~. ~. ~ ~ ~ - ~ _, _. __ ~. I