4. Coordinate
Bill
5. Laverne Dubeof GTE left word to caution the pplicant to take care
when making the opening to th~other building in case there is wiring
tn the hall.. Coordinate any requirements wit her.
unti.l it is
6, Trash plckup w 11 remain the same; that is,
determ i ned add tiona 1 serv i ce i s requ ired.
The following are items to be ... bid. on for remodeling of Kinko's - C liege Station Jocatic)n. All
bids should include all materials and labor. For questions pleas J contact Karen Yancy at
846-8721 .
ADDITION:
1. Make. 3footopenlng .... between ...buildings
2. Remove back restroornan'd.walls In . storeroom
3. Removealfplumbingal1dpipesin storeroom
4. Relocate.wall in..Macsite
5. Bring Restrooms up to code using existing fixtures from new
restrooms.
6. Flnish'outboth. . doorways
7. Build.... office walls. inserting ....one way mirror'. provided
8. lower ceIling. in mac.....site. are.a evenly
9. Remove plaster' & 'wood i.n along mac.. site w 115 & sheet rock if
necessary
10. Add < 1 Onewd110 outlets, 30f which' will be dedicated
1.1. Add .Sphon.e jacks
12. Relocate2laidlinlightflxture.s in Mac site
13. Add 1 four foot florescent fixture to office ceiling
14. Texture where needed and paint all walls lnMacsite
15. Fix. frame .&replaceglass in front window
16. Install 33 square yards of carpet (provided)
17. InstalL rubber moldIng around all.' floors in Mac..site
18. Add 2 Ale vents in wall of Mac site and 1 vent into office
19. Combine electric w~th<existing electric
20. Install. '3. Jightswltches
EXISTING LOCATION CHANGES
1. Re.moveRestroom ..fixtures & . walls
2. Remove. .aI1plurnbing ...flxtures... .and.....plpas
3. Sheetrock a). north wall to east wall (cov ar i ng window)
b) ..eastwallfrom'northwall to windows ( . cO/ering door)
c). southwallfro.m . column west to door
4. Smooth out floor where dralnsareinexlstingstore room
5. Lower ceIling where restrooms and office wer, to match existing
ceiling
6. Remove wall dividing storeroom from front
7. Relocate breaker box
8. Remove wall dividing office. from front
9. Relocatei3-220 outlets
10. Add 9-110< outlets
11. Relocatel'phone Jack (existing outlet, Just needs wiring)
12. Buildlowwall( 4 ft. high .ason . layout
1 3. Install 32 square yards of carpet. (provided)
14. InstaJl<rubbermolding.. where needed