FRONTAGEDEVELOPIVlENT
DR.<.1>82LF
Plea.sereview .theattached three copies. of.<tl econstruction plans
forthe...abovepro jec t pre pared. .by.....Gal..indo
whoreE>resentthe ...adjacent .landowners. .. he City... of... College
Station will inspect the work forconformity<to the approved
plans and . ref.erenced.specifications.Wbnthe . facility is
satis facto r.i lye ompl eted....t he ....citywillrequst.~cc<eptance.o f . the
sarneformaintenance by your department. Fro my discussions with
theacljolningpropertyo'vlner,I expect th remainder of this
frontage road to.beconstruct:ed thrutothe stub end near
Brothers Blvd. shortly.
your consideration of...this
procedure is new to both of us, . I.. want to
City of College Station's interestinthis.m
safe as well as econornically feasibly
citizens. Ipe.rsonally offer mycooperatio
ass ist l'ouroffice in the "tieveloplnen t ofa
insure the common best interest of our respe
matter. Since this
assureyoutha t<the
tteris,to provide a
ravel-way for its
toward that end to
ermittingsystem to
t'iveagenc ies.
S..........l..........I1..c...........ere. ..1....Y. ' ........ ..'./.'.'7./...-. ././/,../. ~J.I;..) /1/.../
(.---~f .... .. .#. -.// .';1/ . '4,/'
.......... ....... '." '. /..... . .... . ;/)' 4/ 7..,././,,1 _. '..
~............__..... -......... ...."'..-_./._..~-.~-"'....J........~... ... ...........~.....'.'..././/i. /1,- L:",___~,
.--- '.David J.Pu .en,P.E.
City Eng-eer
./
pc: Christian Galindo,P.E.
Galindo Engineers and Planners
cirkf.rtg.rd
-~
tf~..~.
....
~
~
~~
..~
City of CollegeSt
POST OFFICE BOX99601101TEX
COLLEGE ... STATION, TEXAS 778
FROM:
The Circle KCorporation, JamesP. Watson, Real
Estate Manager, 13831 Northwest reeway, Houston, TX 77040
Christian<Galindo, Galindo Enginee s& Planner.s,
1900J'I.Vil1aMaria Road; Bryan, TX 77801
Dan Sears, Area Progress Corporati n,,2108 Southwood Dri ve,
College.S tation , TX77840
~~
TO:
resentative,
meet.ing)
OthersattHending:
L.av.~.rne....Dube, GTE
K.im.JohnsoD,Planning Assistant
.Jane.........Ke e..,.... ...Senl.o r.. ...Plann er
KeanRegister, . Lone Star Gas {un ..ble to attend ,
b.uthasreviewed andhasnop oblems)
Tony-Hi chal sk y, Electr icalD epar men t_
Bill <Riley, Water & Sewer Depart ent
TinoOcon,Pub 1icService"sDepar ment
C()yPerry,Bui IdingO.fficial
Harry Davis , Fire Ma.rshal
Shirley Volk,PlanningTechnicia
SUBJECT: Parking Lot Plan - CircleK Convenience Store, 1600 FM
2818 (at.....Longmire) (87-422)
The P. R .,C.onlyhastheauthor i ty'to approve s1 te plans if all
ordinance requirements are met. TheP.R.C.met 0 this date to
review the subject proposal and approved the prop sal with the
followingconditions*:
1. The Electrical Departments requires an additional 5 fe. t to the existing 15 foot
easement along the southern property line. The applicant .ndicated the additional
width.should also be outside the Circle K property line,as is the existing 15 foot
easement. The Electrical Department indicated there was n problem with that, but
exact location should be worked out with the adjacent land wner,and then the
requirements for the facility should beworkedoutwithRa Havens of. that
department.
2. Fire Marshall Davis indicated he has no problems with t eproposedsite plan.
3. City Engineer Pullen stated that a> 12" water line must eextended along the
property linefrontingF.M.2818. The.applicant andthesel er should work out the
details, and coordinate with the Engineering Division and ater&Sewer Department.
4. Mr. Pullen also recommended that the access from Longmi e Drive be moved toward
the southern pr()pertylinetobetter..a~commodatetheshare access along that
location.
5. Drainage is-being coordinated with Area Progress Corpor tion,.theowner of
adjacent properties.
6. The Service Road along F.M. 2818 must be constructed.. to State HighwayD~partment
Standards, with inspection to be handled by. the City of College Station.
7. GTE requires conduit to be stubbed out from thebuildi g to the utility easement.
Coordinate. with Laverne Dube.
8. Coordinate electric service requirements with the Electric.Department. Furnish
load data requirements as soon as possible to expedite ser ice when nequired. Submit
a letter requesting underground, service if desired. Coordinate the location of the
transformer between the private parties.
9. Parkingspaces.forhandicf:lpped:p~rsonsJlre.requiredbY ordinance to be located as
close as ..possibleto:the n~!lrEis't entr~ceto the.facility. The proposed .location
does not...meet that....criteriaL.:::...
10. Mr.Ocon of.Public~erviceshas:i.ndicatedione6 cubic ard dwnpster,placed on a
pad at the same-elevation. as the adjacent driving surface, having 12' x 12' interior
measurements is required for this project. Do not include gatesonfences:,i fused
around the pad. No parking. carr be allowed at the northeas corner of this tract, in
order to provide access for garbage. trucks.
11. Proposed landscapinglDeetsordintillce requirements, how verP1anning Assistant
Johnson has suggested the useofsomethingotherthandwar yaupc>ns, :which are very
s low growing type shrubs. .
12. Ordinance allows only I detached ulogo" sign per build.ngsite. If more are
beingproposed,a:v8r'iance toordinancerequirelll~.nts must. egrantedbytheZoning
Board of Adjustment~...:...
13. Ordinance requires a.6nraised island at each end ofe
painted islands on > the driving surface as sub'mittedareno
The
SUBMIT 10 COPIES OF REVISED SITE PLANS TO THE PLANNING DEPARTMENT
FOR APPROVAL PRIOR TO CONTINUING WITH STEP II OF THE BUILDING
PERMIT PROCESS WHICH IS INCLUDED WITH THIS REPORT.
*Any changes to an approved site plan must be cleared through the
Planning Division~
PRC87-422
12--9-87
Page .2
c....
GUIDELINES. FORFRQNTAGEROAD(}ONS'rRUC'lt.I9N ",Q;~tSTATERlq,HTOFWAYBY PARTIES
OTHER THA.NTHESTATE DE'PARlMENTOF HIGHWAYS. AND PUBLIC TRA SPORTATION
District guidelines applicable to the design, construction,
maintenance of additional frontage roads (1.reas follows:
1. No agreements cC,lnbe made with private individuals or. cleVelopers
for permission to build a frontage. road on State right of\vay.
2. Detailed consttuctionplansforproposed frontage roads snaIl be
submitted to the .DepartmentofHighwaysforrevietv and approval. Per-
mission in the form of apennit can<be granted to the ityfor con-
structionof a frontage road at the reqllestof theCit. The City can
in turn, contract with a third party for construction f the frontage
road.
3. Any lighting of the frontage road will be the res onsibility of
the City.
4. Any signing and pavement marking required by fro.n age road traffic
along the frontage road will be the r~sponsibility of he State.
5. .AIl items relative to providing adequate drainage of the fronta. g..e ..,,"'J..
road \oJil1 be the responsibility of the City. 0.-_ ~
<\t~ .t2J2.4IX . ~
t7f ~~
6. All disturbed areas forcuta.nd fill slopes will be s_odded for
erosion contr.olal1d\vil1 be the responsibility of the City.
7. Access intervals from the frontage. road to the ma .nlanes of the
high\.Jay\.]i11' be a minimum of 1500 feet unless agreeduon joint 1y by
the City and the State.
~
~
8. Usual design for typical section.
(See Attached Sheet)
.;...
.' .~J'
(.: "
NOTE: Ittnay be desirable to curb property side of fr ntage road in
areas of potential developn1ent without correspo ding curb on
.i r ee \.J a y sid e .
f'linimum r03chvaY\.Jidth of cross drainagestructu -es \.jillbe 361..
All drainage structures will have .sloped safety end sections or
be protected by guard fence.
10. The CitY\oJill be respansib Ie for the construction and inspac tian
oltha frontager-oad. The State \.Jill make spot inspec ions of the
construction and \1il1 assume maintenanceresponsibilit1 of the section
after a joint final inspection acceptance by both the ..ity and the State.
A drive. parallel to the right of way which 'will provide ser'ice or access to a
single business or location, ~.;ill be considered as an access drive and ~dll be
handled by the City. The State shall have the right to revie\v such permits
prior to approval to insure that they meet frontage road standards.
Stace Oepanment of Hiahways
and Public Tranaponadon
Form lose-Rev. 12-86
Permit to GonstructlAcceSs Driveway.Fac lities
on Highway Right of Way
To: CITYOF.....COLLEGE... STATION
P. O.Box9960
~llegeStat.ion/._ Tex.as __.__7.7.840-._..._-
Hwy.[1~L~?8J.J~)e mit No.._...
Control?~_~_~... ._Stion J..
TheState Departmtnt ()f Highways andP4blic TraQsp()rtati()n. hereinafter called the Stat... hereby authorizes
City of Colle9~Station _ ,hereinaftercalledthe grantee, to (re) constru tan access driveway on the highway
rightofway abutting highwayno.FM2818 in . ... . ... Rrrl~n~ .. .. County located ___a~the . southeast
corner of the intersection ofFM 2818 and Longmire Drive.
Subject to the following:
1. The grantee is responsible for all costs associated with the construction of this a cess driveway.
2. Design of CacilitiesshaU be as foUowsand/orasshown on sketch:
Construction of frontage road from Lon mire Drive east 182 fee .
See Attachments)
AU construction and materials shall be subject to inspection and approval by the State..
3. Maintenance of facilities constructed hereunder shaUbe the responsibility of the gr ntee, and the State reserves the right
to require any changest maintenance or repairs as ; may be necessary to provide prot ction of life or property on or adja-
cent to the highway. Changes in design will be made only with approval of the State.
4. The Gnlntce shall hold bamllcss the Statea~i~dulyappointed agents and empl yees against any action for personal
injury or property damage sustained by reason of the exercise of this permit.
S. The Grantee shall not erect any sign on or extendins over any portion of the high ay right of way t and vehicle service
fuctures su.ch as service pumps, vender stands~or!tanksshall be loCated at least! elve (12) feet. from .the right-of-way
line to. ensure that any .vehicle services from these fIXtures wiU.be. off the .highwa ·
6. This permit will become null and void if theabove-r~ferenced driveway faciliti are not constructed within . six (6)
months . from the issuance date. of this permit.
7. The Grantee wiD contact theState'srepresen~tive Patr i ck T . Wi 11 i telephone
(409) 778-/1 hE:) at least twenty-four (24) hours prior to begin · the work authorized by this permit.
Sta e Departm~t of Highways
a d Public Transportation
Date of Issuance
District Engineer
The undersigned hereby agrees to comply with the terms and conditions set forth. in this
driveway on the highway right of way~
(
( ..
Access Driveway Regulations
The State. Highway and PUblic Transportation Commission, in recognitiorrof its respo !sbility for the safety and utlility of
~ public highways under itsjurisdiction, has directed the adoption of rules and regulations t ,accomplisha coordinated develop-
ment between highways and abutting prOperty. For this purpose,thebookletentitled "egulations for Access Driveways to
State Highways"waspublishedandadopted, setting. out departmental policies to regula e construction and. maintenance of
access driveway facilities.
Sketch of Installation
RECt, iVEO JAl~ 1 2 1988
COMMISSION
STATE DEPARTMENT OFmGHWAYS
C AND PUBLIC TRANSPORTATION
P.O.. Box 3249
Bryan, Texas 77805
JanuaryP-S, 1988
ENGINEER-DIRECTOR
R. E. STOTZER, JR.
ROBERT H. DEDMAN, CHAIRMAN
JOHN R. BUTLER, JR.
RAY STOKER, JR.
IN REPLY REFER TO
Control 2299-1
FM 2818
Brazos County
From Longmire Drive South 182 Feet
Mr. David Pullen, P. E.
City Engineer
P. o. Box 9960
College station, Texas 77840
Dear/ Mr. Pullen:
Attached is a permit form for the construction of 182 eet of froritage
road east of LongmireDriveonFM28l8.. Please sign .a d return
thre'ecopies to this office for further processing.
If you should have any questions, please advise.
~ ) --.
^~-~7lN~
Patrick . Williams