HomeMy WebLinkAboutMisc.
BURRIS,* PATTERSON
ARCHITECTS
2402 Broadmoor Suite A 201
BRYAN, TEXAS 77802
[L[ELrlTlEIRl @ [f Lr rn1~~ ~ [N] DLrLr ~[L
TO
(409) 776-6433 n
Cn:r ~f COc.LI!!<*oF: ~~
1iAN~IN~ ~~~I
CCtL~,~ ~-r~ \ ~
DATE(,;, d:3 ~ ~ 1
ATTENTION
IJOB NO. ~1~_
HE:
WE ARE SENDING YOU ~ttached 0 Under separate cover via
o Shop drawings ~ Prints 0 Plans
o Copy of letter 0 Change order 0
the following items:
o Samples 0 Specifications
COPIES
DATE
NO.
DESCRIPTION
o
IS
(~ ~G
o~
~
THESE ARE TRANSMITTED as checked below:
~ For approval 0 Approved as submitted
~ For your use 0 Approved as noted
Pr!!t As requested 0 Returned for corrections
o For review and comment 0
o Resubmit_copies for approval
o Submit_copies for distribution
o Return__corrected prints
o FOR BIDS DUE
19
o PRINTS RETURNED AFTER lOAN TO US
REMARKS
COpy TO~lh' I JQ~eLL.
I
SIGNED:
PRODUCT 240.2 L~ Inc., Groron, M,ss. Ol47L
If enclosures are not as noted. kindly notify us at once.
BURRIS,* PATTERSON
ARCHITECTS
2402 Broadmoor Suite A 201
BRYAN, TEXAS 77802
[]J~LrLr[Ern1 @ [f Lrrn1~ ~ ~[Kj[] DLrLr ~[L
(409) 776-6433
TO CtTY c;;p- ~ ~q..J
~f-.JLr--...1f::1 Pf2P~
~~l6 ~~) ,~
DAT"-J _-, _ Br lJOB N06t 'Z ~ --
ATTENTION
f:~..c..-
.::::;. L1't::;: .~V(t::::L-L --
WE ARE SENDING YOU .,r Attached 0 Under separate cover via
o Shop drawings /'l.Prints 0 Plans
o Copy of letter 0 Change order 0
the following items:
o Samples 0 Specifications
COPIES DATE NO. DESCRIPTION
h { .-' -Bl c::::;,. l~ t't IU \
I
THESE ARE TRANSMITTED as checked below:
~ For approval
~For your use
~s requested
o For review and comment
o FOR BIOS DUE
o Approved as submitted
o Approved as noted
o Returned for corrections
o Resubmit_._copies for approval
o Submit_copies for distribution
o Return_corrected prints
o
19__ 0 PRINTS RETURNED AFTER LOAN TO US
REMARKS
PRODUCT240.2 jNiHiSjlnc" Grntnn, Mass. 0l471.
If enclosures are not as noted. kindly notify u
COPY TO
,~
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840-0960
November 4, 1987
MEMORANDUM
TO: Bill Tap Construction Co., 1501 FM 2818, College Station
FROM: tee: ~~
D~rector.of Planning'\\
eer
The P.
ordina
review
storage
condition
University
corner of
SUBJE
(prop
lot)
if all
date to
of the
1. Change parking space east
of and adjacent on of the building
was cbanged due e existing overhead utility
lines, the fire wall requirements of the building code at the
proposed location and the possible loss of more than one parking
space on the lot. Inclusion in the plans of some type of
protection barrier between the dumpster and th~ building such as
bollards or stationary wheel stops was also recommended.
2. The applicant should be aware that Section 8.13.A.(4) of the
Zoning Ordinance states that "No machine, process or procedure
shall be employed on any property in the City in which noise
above the ambient noise level is discernible beyond the property
line."
If the applicant chooses non-compliance with the recommendations
made and listed above, additional review by the P.R.C. of any
other proposals will be required.
SUBMIT 4 COPIES OF PLANS TO THE PLANNING DEPARTMENT FOR APPROVAL
PRIOR TO CONTINUING WITH STEP II OF THE BUILDING PERMIT PROCESS.
~.~
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840-0960
December 1,.1987
Mr. Bill Tap
Bill Tap Construction
1501 F.M.2818
College Station, Texas 77840
Attached are copies of approved site plans for the location of
the proposed storage building at 601 University Dr. Also
attached is a copy of the P.H.C. report when the site plan for
this change was originally reviewed. Please review this report
as the P.R.C. Committee would like to reiterate item #2 relative
to noise levels beyond the property line. Thank you.
0-aliD4L:
')ine R. Kee
f..// Sen iorPlanner
,
June 10, 1987
MEMORANDUM
TO:
Fred A. Patterson, Jr., Burris*Patterson Architects
Jerry Skibell, 5420 LBJ Freeway Suite 1100, Dallas 75240
Project Review Committee: ~~
Jim Callaway, Director of Plannin~
David Pullen, City Engineer
Nancy Sawtelle & Lynn Colson, P&Z Representatives
FROM:
Others attending:
Bob Epps, Assistant Director of Public Services
Ray Havens, Assistant Electrical Superintendent
Lavern Dube, GTE
Bill Riley, Water Distribution Supervisor
Coy Perry, Building Official
Harry Davis, Fire Marshal
Kim Johnson, Assistant Zoning Official
Shirley Yolk, Planning Technician
SUBJECT: Parking Lot Plan - Addition & Renovations to the B&W
Service Station at 601 University Drive - 87-408 (C-NG
Zoning District)
The applicant, Fred A. Patterson, Jr. explained the proposed and
tentative uses for this building are a concept store for Baskin-
Robbins in the existing part of the building and a carry-out
pizza store for Lil'Caesar's Pizza in the addition. He stated
that plans include some limited amount of seating in the stores
with additional, seasonal seating outdoors.
The P.R.C. determined from this information that the proposed
uses will be of less intensity than the proposed use for which a
site plan was approved in 1986 (86-429 The Peso Exchange).
The P.R.C. only has the authority to approve site plans if all
ordinance requirements are met. The P.R.C. met on this date to
review the above mentioned project, and approved this proposed
project with the following conditions*:
(1) Mr. Epps directed the applicant to indicate on the site plan
that the space designated for the location of the dumpster is
12' wide. He agreed to locating the 3 cubic yard dumpster
(minimum required) in the space which would be considered the
third parking space off Stasney Street with the condition that
spaces numbered 1 & 2 are signed "No Parking 5 a.m. to 10 a.m."
\
to allow access to the garbage truck. The dumpster must be
located on a surface the same elevation as the driving surface.
(2) Mr. Havens requested electrical information - single or 3-
phase service, load data requirements, etc. - as soon as possible
so a review can be made by the Electrical Department.
(3) Ms. Dube stated GTE has no problems with this request.
Coordinate any telephone needs with her.
(4) Mr. Pullen stated that curbs and gutters designed to meet
City Standards are required along the property lines adjacent to
both University Drive and Stasney Streets. He suggested that the
applicant make the back of curb the right-of-way line.
(5) Mr. Riley stated there will be no problem with the applicant
using the existing water and sewer utilities. Coordinate any
changes or additional requirements with him.
(6) Mr. Perry stated that one parking space and ramps to provide
access for the handicapped will be required for this facility.
He indicated that parking space #1 would be acceptable as long as
it is available for use during all hours of operation.
(7) Mr. Davis stated that filling of the underground storage
tanks must be done with dry sand or drilling mud.
(8) Landscaping as proposed is acceptable.
SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT FOR
APPROVAL PRIOR TO CONTINUING WITH STEP II OF THE BUILDING PERMIT
PROCESS.
*Any changes to an approved site plan must be cleared through the
Planning Department.