Loading...
HomeMy WebLinkAboutMisc. March 26, 1986 MEMORANDUM TO: Brian P. Michna, Fletcher's Corny Dogs w. C. Scarmardo, P. O.Box 3652, Bryan, TX 77805 FROM: Project Review CODmlittee: ~ IN Al Mayo, Director of Planning ttr~. Michael Hester, Assistant to City Engineer David Brochu, P&Z.Representative Others attending: Kim Johnson, Assistant Zoning Official Bill Riley, Water Distribution Supervisor Carol Elmore, Assistant City Attorney Bob Epps, Assistant Director of Public Services Bland Ellen, Deputy Fire Marshal Jinuny McCord, McCord Engineering, Inc. Laverne Dube, GTE Shirley Volk, Planning Technician SUBJECT: Parking.. Lot Plan - Fletcher's Corny Dog - 86-403 located on Area A, a 1.3589 acre tract which is part of Block I Fed Mart Development Corporation subdivision (according to site plan information) which is located at 701 University Drive E. The P.R.C. met on this date to review the above mentioned project, ~d approves with, tile following conditions*: 1. Submit a letter to Electric Department requesting underground service. 2. Furnish electric load data requirements to Electric Department. 3. Provide an easement (or letter of agreement from property owner) for electric service to this project. 4. Change the site plans to reflect the same plans shown on the construction documents. Specifically regarding the water line. 5. City Engineer has suggested installation of a new public sanitary seweJr line as shown on file copy of site plan. Proposed plan is not COIlsidered a good one. Furnish an easement or an agreement from property owner to cover sewer line., 6. Ordinance 1638 requires an 8 foot setback from property line to paved area of parking lot. Show dimension on site plan. 7. The bottom of the soil in the islands must be over dirt (as opposed to concrete or asphalt). at the locations where the crepe myrtles are transplanted. 8. Coordinate all telephone requirements/service with GTE. SUBMIT 10 COPIES OF SITE PLAN TO PLANNING ... DEPARTMENT FOR APPROVAL PRIOR TO CONTINUING WITH STEP II OF THE BUILDING PERMIT PROCESS. *Any changes to an approved site plan must be cleared through the office of the Director of~lanning. 1 I~ 10tJ~ III V II {).iP1 Iii VUV-A.' II !! 1 H: ~!It&~ ~ #j cQ~~~~. . . *~ ~~~.. ~~Q. ~ ......~............... ~. .... ..~~ . !JfP ~. ... . ... . ~.,~~~ .~..~ .~.~- ~ . ~~J ~ ~..~ 1'~-~r~~~d~~~ ~~~:. - ...~ ~. ;f~~ ;(buJ94:J ~~/ . ~.~ .~.ALO~ 1;J~~. ...,~.. ~~r~~~..~ ~~~//.V.~).. . ~~ ..~ JjrfrG I ~