Loading...
HomeMy WebLinkAboutMisc. October 22, 1986 MEMORANDUM PRESUBMISSION CONFERENCE TO: Dan Sears, Area Progress Corporation Bobby Lane, Area Progress Corporation FROM: Al Mayo, Director of Planning ~ Ray Havens, Electrical Department Jimmy McCord, McCord Engineering, Inc. Terran Sanchez, Lone Star Gas Co. Laverne Dube, GTE Shirley Yolk, Planning Technician David Pullen, City Engineer SUBJECT: MASTER PRELIMINARY PLAT - Tract B & Tract C Texas Centroid Ranch (86-305) located west of S .H. 6 and ~~outh of Greens Prairie Road. The above staff/utility personnel reviewed the subject plat ~lnd recommend approval with the following conditions*: 1. The easement along Greens Prairie Road should be designated as a "public utility easement" on the Final Plat. 2. Additional utility easements will be required as more information regarding specific uses and requirements are developed. 3. Planning for utilities for this entire large area should be coordinated with the Electric Department, the Water & Sewer Department, General Telephone and Lone Star Gas Co., and a Master Utility Plan should be developed. THIS PLAT IS SCHEDULED TO BE CONSIDERED BY THE PLANNING AND ZONING COMMISSION ON NOVEMBER 6, AND BY THE CITY COUNCIL ON NOVEMBER 13, 1986. *Any changes to an approved plat must be cleared through the Planning Division. 1 WILLIAM D.~FITC H lnvestments- Management 2108 SOUTHWOOD DR. COLLEGE STATION, TEXAS 77840 OFFICE (409) 693-9112 November 20, 1987 Mr. David Pullen City Engineer City of College Station P. O. Box 9960 College Station, TX 77840 RE: Sidewalks to be completed with development of adjacent properties. Dear Mr. Pullen, As we discussed this morning, it is sometimes necessary to build major streets through or along the boundary of undeveloped and unplatted properties. Often there is no development which would produce pedestrian traffic which would need these walks when the vacant properties are developed. In order to avoid the damage which always occurs to unused walks during subsequent construction and utility ihstallationsonthe adjacent properties when being developed, we have been permitted to delay sidewalk construction in certain places where appropriate to do so, with your approval. This letter is to confirm my agreement that these sidewalks will be completed as a requirement for the development and platting of the adjacent properties; and I acknowledge this obligation to be binding upon myself, Southwood Valley, Inc., and Area Progress Corporation, and any and all successors in ownership. w. D. /k~~. /~~<187 9~p .~. af 6//~~ AGENDA ITEM" COVER SHEET ITEM SUBMITTED BY: AL .' Mf.\YC:> (name) CAP 1 TAL ,"I MPRn\lFME~ (department) FOR COUNCIL MEETING OF: ------~--~---~---~--------------~-------------~--~-----'--------- ITEM: 86~3Q5:. Mqster rreltmtnary'Plat~ Texas Centroid, Ranch-Tract B & Tract C ITEM SUMMARY: ThJsM~sterPrellrrilhq~Y Ptq1:QfZU.53i~Gt'~~t!'!cludes thec65 acres. along Rock Prq lrleRQi'!d.,astreetnalTledlndependence.Parkway wh fch r.uns perpendicular. to Gr'een5~" Pra irf'eRoadandlntersects,w'j tha streetna.med Enterprlse Avenue whi ch lsalsa fnc'ludedfntl1ep]atand runs perpendicular toS.H,6,and border a 200 acre"tract (also Jncluded) w'h.lch runsalongS.H.6. FINANCIAL SUMMARY: STAFF RECOMMENDATIONS: P'resLJbrnJssJorl Conference,oreport CITY n/a SUPPORTING MATERIALS: I . App llcatlon', presubmlsslon con'ference'report II. Location map III,. CopY' of plat