HomeMy WebLinkAboutMisc.
City of College Station
F)()Sl~ ()FFICE BOX 99(30 1101 TEXAS AVENUE
COL.,LEGE STA1~ION.TEXAS 77840-2499
November 20,1985
MEMORANDUM
TO:
FR()t~:
Ot her s _ .~'Ft~qd:ln 9 :
Joe.GlJfary, - ElectrIcal SuperIntendent
BlllfH J ey,Wat~rDlstrlbut Ion Super-vi sor
Barry.Cl_a.r,Assi;t9ntiClt'l Attorney
Ha r ry( [laVf s , Ffrla'i~a,fshca.l.
Klm/.Jpn,nson,. Ass.I~~ant~~!"ltlgOff I cf a I
Snl rJey-Volk, .Pla-nn-irlg-<-:Te~~ni ct~n
SUBJECT: Concti t i onaJ Use Perml tIS i te P ralT -;Addit i 011< to Po Fi ce Station (85-710)
i
TheP.R.C. met on thIs date to review the~bovementloned site plans, and
recommends approval wIth the followil)gconditlons;t,:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
A compflatlonofall completed draJllageJllformatl~n~,,(ln>h()use) must be
made (intoreportfol"m) prlortobull<:\lng. permftappJ 19atlon.
Show the floodplaJnboun~aary l.lneson the s i teplan.
Inc lude.anoteregardingfl ood-prooflngof thefirlngirang-e structure.
Fl.re hydrantlocatlon(s) subject to approval of Fire Marshal.
Add the island at the end of the parking row <35 designated in meeting.
Delete the note referring to concrete wheel stops around perimeter of
parking lot.
Re-calculate landscapIng pointstoreflectcorrect:allowances;make up
the dJ fferencebetween what I 55-hown and what ls<requiredin add it lonal
pla n t, j n 9 s .
Change the size of the junipers to reflect 5 gallon size If points indi-
cated are to be allowed.
(8)
*Any changes to an approved site plan must be cleared through the office of the
Oi rector of PI ann 1n9.
SUBMIT10COPJES OF REVISED SITE PLAN TO PLANNING DEPARTMENT BY NOON ON
NOVEMBER 27th TO BE INCLUDEDONP&Z AGENDA DECEMBER 5th.
sjv
~
City of College Station
the offlc.e of
sjv
~?
City of College Station
,July 24, 198,
*Any changes to an approved site pI an must be cleared through the offl-c:e of
the. Director of Planning.
sjv
.... ,....
4~
.:..
City of College Station
TO:
the offlc'e of
sjv
eStation
City. of
POS1~ OFFIC:E 13()X 996() 1101 ~rE~Xi\S AVENUE
COLLEGES1ATION. TEXAS 7784C)-2499
November 20, 1985
MEHORANDUM
TO:
P lannt ng an.d ZonlngCommJ sslon
Elrey.B. Ash, DIrector of Capital Improvements
MIke Greer, Emmett Trant & AssocIates
Project Review Committee: \\.U
.JamesM.Callaway,.AssJstantDirec tororp 1 annlng~ .
Mark Smfth,As sls tantCI tyEnglneer
Mark P'aul son,P&Z RepresentatIve
F R()t~:
Others attendl.n:g:
Joei.:Guifdry, ElectrIcal. SuperIntendent
BlllRIl ey ,~at~rD istrlbutf on Supervi sor
BarryC lar,.A.ss.ls tant<CI ty .Attorney
Ha r ry-pC3 v.l s .,........Flre...Marsha.l
KIm Joh?son , ...Asslstan t. Zoning. ~f f I cia 1
Shlrley:'Vol.k, Plannlng:Technlc tan
SUBJECT: COflqJflonalUse PermIt/Site Plan-Addition to .PollceStation(85-710)
TheP.R.G. metonthrs date to revlew the above mentioned site plans, and
recommend.s approva lwlththe followi f)gcondi t i on s ;t~:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Acompllat'Jonofa 11 completedd ra lnage i nformatJ on . ( inhouse) must be
made(l.ntoreportform)prlor to bulldingpermltapp llcatlon.
Show the flood platn boun'daryl ines on the s i teplan.
Include a note regarding flood-proofing of the firlngrang.e structure.
Fire hydrant locatlon(s) subject to-approval of Fire Marshal.
Add the island at the end of the parking row as designated in meeting.
D.e lete the notereferri n9 to concrete whee 1 stops around perimeter of
parkJ nglot. .. . . .
Re-calculate>landscaplng points to reflect correct allowances; makeup
the difference between whatlss-hownandwhat isrequ i red 1 n addi t lonal
plantlngs.
Change the size of the junipers to reflect 5 gallon size if points indi-
catedaretobe allowed.
(8)
,;"Any changes to an approved site plan must be cleared through the office of the
DirectorofP1anning.
SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT BY NOON ON
NOVEMBER 27th TO BE INCLUDED ON P&ZAGENDADECEMBER 5th.
sjv
City of college ~tation
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION. TEXAS 77840-2499
...c..... ..-..
, Kerr Associates. Inc. Form A-1
fjIII....~ ".'.
-,-~ -,.~;:-
6500 Vauam treat.ment
176
70
4500
E~c.a.Yat.:i..9n
TdPsoilJ...iQ,staJ.:..1ed].
Gta/vel
82C)
Q
740
215
Dwarf napcliJ ~
1601~g~;~~J,~/ .... .-
E.e'~c.pf:.~ (3)
rt ~A+P Pavers
Cedar..... Elms
Asia.tic 'asmine
.f=ul.-~I""'t''t'''''\/''''\le ~
---.....-.-. ---
22.
L3.2aalllhn~)
.. ....,
20
~
15
30
-1
-1
4Q
.
.
15
00
50
00
00
~O
50
00
18.
~ ...~ ..............-.... ....,-- ..-.;...-.......--...- .........
OOdri=i1
..... -, ~-.....__l .-......... ~ ~_
- -
~~
00
00
00
330.00
300.00
195.00
280.00
650.00
continued
.4.....QQ
14.00
8
00
600
00
1
25
NO.
ITEM
DESCRIPTION
2.. ?S
900
1200
3750
1925.00
480.00
1850...QO
91...3...75
16C) .00
7Bf).f)O
?R70..~...OO
RRO.OO
2464.00
1120
675
640.00
1455.00
J. .(lS...i 00
1..1:)0....00
A4.A_O.Q
00
00
N STALLATI ON
....-- ---------
SPERUNIT TOTAL
80
MATERIALS
--- --
S PER UNIT TOTAL
O&P
%
TOTAL
COST
-
PROJECT
p
L;U~
I
t~
II
-~,.
MAl
t
ESTIMA
PREPARED BY
CHECKED BY
W.UI(I\.~M tt
I
SHEET ~
DATE
DATE
OF.-..L-..
."J"'"
vy.ul(l\.~n tl::
---....-- ---
.. QUANTITY INSTALlATION MATERIALS
ITEM O&P TOTAL
--
NO. .... DESCRIPTION NO. UNIT $ PER UNIT TOTAL $PER UNIT TOTAL -% . COST ...,
- ...
380 Tam junipers laaL 3.~Cl l~~AAl1
-. -
756 St. Augustine sod. sq.y 1. 1.25 945.00
.... I....
, .... .... .......... -
,. ,. ... ....... . ........
....... ...... . - .... "
.. *~
.'. . ..... .
.... .: ... . ..... .
.. ....... , .....
...
... .... .
.... . .....
.'
..
.........., .. - ....
.... '~'. ... .....
'''';~.
... .... ... ... ., ... .. .. ....... ..
. . ... .'
'. ....... '. ..
.:
....... ....... .. ..
...
... .... ...
i.:
. .. ..: .....
..
.
-. ... ..... . ...
.: ..
.... .. : .,
.....
..
...
.'. ...
... - .... ....... ..
.
. ....
. '... .. .. ..
.... .. ...
., ..
...
.... ?71hR nn
...... .. +lASl: ? 7 :l6-
- ? QQ~l"1t:...
~ Kerr Associates. Inc. Form A.1
. . 4 ..- ., . .,
~_.. ~. - .........---
-----
~ .........
.......-~-:~:.-...............-.Ar
[~fila~iy.Q!K:::B!i:9in~~i:~fBQ::::::::::::::::::::::::::::::::::::::::::':::::::::::::::::::::::::::::::::::::::::I:::::::::=:::::::::::::::::::::::::::::===::~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::=::::::::::::::::=::::~E~giIj
From:
To:
Date:
Subject:
Veronica Morgan
S"OlK@CITY OF COLlEGESTA TION~CITY HALL
9/14/98 2:55PM
Re:. Canopy at po
yes, i'lIlog adp number and issue it with the stdlanguage with fees waived and no appl necessary.
>>> ShirleyVolk>09114/98 02:25PM>>>
Are you. o.k. with issU8riceof the building permit for the canopy over the compounded \iehicles at P.o.?
cc:
vm org an
ENGINEERING
Case Number
&;7Lo
?bh./CE"" .6.77Tfi6JA/.' C:<6 / /~~S
Location:
cf;A/1>/7;l~H~ . z~ PE~41/r FOe
.4LJZ> / 77~AI' -n EA'I.:5 77;t/~ /3L L>6)
Request:
Wa te r:
fJllfL~~k~
Sewer: .
Ale't!~Je
Street Capacity: ~~
:<~'~~
-t;; 1I~~~ ~ ~1\dll'~ ~, ~ll-o 'f;~a~ ). ve.
.Access:
DrainagTP~C~~C1Y1~~ ~~~/~'2 ~,le
Flood Plain: ~~~. l'fiM.~iHi~~rl(JDy B..W!Y. ~12
11~fJli:t4Wk~-I" ~~ R~Wf: 'Lv ,II /;"-l~~~
fl(tN'IoZu(/~~ ~rHJII
Spec i.a 1 Features.:.
"