Loading...
HomeMy WebLinkAboutMiscellaneous --'~' eity' of eollegeStation POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840-2499 Aprj;] 30, 1985 j cc: Greg Court KJ: a 1 ,,'.f~ /(1 ) v(2) ~3) A4) Y{5) v(6) -- (7) (8) (9) (19) City' of C<>llege Statl<>n POST OFFICE BOX 9960 110 1. TEXAS. AVENUE COLLEGESTA.TION,. TEXAS .77840- 2499 Oc tober 1 7, 1984 MEMORANDUM TO: Saba Halaby, General Partner, Samana Partnership Greg Court, .18 Cargill Drive, Bryan, TX 77802 FROM..: Project Rev lewCommittee: .~ AIMayo, 'Director of Plann ing I~v . David Pullen, CltyEngineer DavId Brochu, P&Z Representative Others Attending: Bob Epps, Ass't. Director-of PubllcServices Joe Guldry, Electrical 'Superintendent Jim McCord, Elec~ Power...Engrs. I Bill Riley ,Waters Sewer Department David Riley, GTE Joey Porter, Ass't. rireMarshal Kim Johnson, Ass't. Zon/~ng Official SUBJECT: Site Plan Permit .;.Timber Creek Apts. Phase II - (84-506) TheP.R.C. met on this elate to review the above mentioned project, and recom- mends approval wlththefol10wing cond itlons ;1, Ord>inance requires an 8ft. setback from property line to parking areas abutting. streets (spec if i cally along Spr ingLoop) . A 6"raisedcurbis required around all edges of all parts of all paved areas without exception. (To Includeis1ands, planting .areas,access ways,dumpsterlocat.lons, utiLi ty patds ,etc.) Curbdetai 1 to. be approved by theCl'tyEngineer. No exceptions will be made for areas in~icated on site planas "reserved for future parkingll. Additlonalparklngfor clubhouse may be necessary, depending upon the use of that room. If used for rental to the publi c,adequate parking is not available. Consult legal Department regarding development ag~eement. A50footclear turning radius in front of dumpsters is required. Dumpster pad must be at same elevation as driving sur:face. A 121 x 12'-minimumpad is requiredfo'r each dumpster . Three six-yard dumpsters will be the minimum requ i rement for this pro j ec t . Thefl re hydrant across Spring Loop cannot be used for protection for this proJe.ct. Additional hydrant(s) wi 11 be required at location designated by the Ass It . Fire Marshal. All curbing must be marked as Fire Lanes. Any work done in the flood plain will require a FloodPlain Development Per- mit. Coordinate with the City Engineerls office. A drainage easementmax. be required along the creek. A landscape legend whIch includes species and points is required on the plan. Barricades around trees to be protected must be in place prior to any exca- vation. (Protected trees should be a minimum of 611cal i per.) Indi catethetype of irrigation to be used for 1 andscap ing. Continue on page 2 P.R.C. Report (84-506) 10":17-84 page 2 '\ v(11) Showdimenslons of isJandson plan. Minimum width required by ordinance is 9 feet. ;'~Anychanges to an approved site plan must be cleared through the office of the Director of Planning. SUBMIT 8 COPIES or REVISED PLAN TOPLANNfNG DEPARTMENT FOR APPROVAL PRIOR TO BEGINNING STEP II OF THE BUILDING PERMIT PROCESS. sjv ~ : ~ . ..' " .r CiW/QfC<>llegeStati<>n POST OFFICE BQX9960 1101 TEXAS AVENUE COLLEGE ..STATION, TEXAS 77840. 2499 Octobe.r4, 1984 SomanaPartnership P.O.Box69 Killeen,Texas76540 ATTN: Saba Halaby , General .Partner Dear Mr. Halaby: The . ProJect Revi ew.. Commj tteewi 11revew .y~urproposeds Itepl an of the Timber Creek Apartments Phase I on Wedne!;iday,.October. 17 , 1984 at 10:00 a.m. It wouldbeadviseableforyou to have a re- presentative atthatrevlewto answer any questions which may arise, If you have any additional questions please contact the Planning Offlce~ cc: Greg Co~rt,18Cargil1 Drive, Bryan,TX 77802 sJv