HomeMy WebLinkAboutMiscellaneous
City of College Station
POST OFFICE BOX 9960 1101 '.TEXAS'AVENUE
COLLEGE STATION, TEXAS 77840-2499
May 2, 1984
MEMORANDUM
TO:
David Gower Construction
Project Review Committee: ~r
A1 Mayo, DIrector of Planning .~. .
Mark Smith, AssistantClty Engineer
Steve Hansen, p&Z Representative
PH,OM ':
Others Attending:
Harry Davis,FireMarshal
Jim McCord, El ec ~' Power Eng r s .
John Goff, GTE
Joe Guldry, Electrical Superintendent
Kim Johnson, Ass't.Zoning .Official
JaneKee,Zoni'ngOfflc ia 1
Shi>rley Vol k,Planninglechnlcian
S,UBJEtT: Site ,Pla,n'Permlt- Sara .Drlve4-P 1 ex -84-503
I
The P.R.'C. met:onthls.dat,etoreviewthe'above mentioned proj'ect ,and
recommends appr~ova <lwlehthe fol'lowJngcondi 'ti on s: -;':
,(1)
(2)
(3)
'(4)
(5)
(6)
(7)
Revls:ethe drawing to show the proposed' b u i 1 di ng wi th one . heavy, . so lid
1,ineratMEal"'than<thebrokenllne.
Orclinan!ce~reCJlllresan '8footmi nim~m dsetback.from the prop~rtyllne
tothepgv~mentalong.the Texas Avenue Frontage Road.
If anyp,arklng ..s,paces arenotcontalnedon-slte, furnIsh capri 'late
parkin,gi.easemen tto cover thos'e spaceswh lch a re"off-s'i terl.
Dlrect.(i)r,ofPublie Services must direct the type of 't"ra'sh pickup and
appreve the plans.
l,ocal:eall utility poles on' t'he s:lte~lla.n; curbing should go around
any lsland>.containlngautlli ty pole.
The:i 51 an"dlntheparking rowshpuldshow a 'radi us .
6"raI sedcurbingi s requ i red around the edge of the parking area , the
lslandsand the access easement on tot 2A.
Please note that the PRe approval on this date with the abovecondltlonsonly
appll.es to development of lot 2A. Beforeaddltiona 1 approval of the plans, for
future development on t:helots adjoinIng this lot (totalling 3 Jots),addltional
a<:c.ess-easements must be provided, as we,ll as somew,ay to address the possible
"dead endlJd;rlveway on the 4th lot adjacent to the drainage easement.
~'~Anychahg,es to an approved si te plan must be cl eared through the Off:-ice of the
Director of Pl.ann.lng.,
SI.:lBM,IT5C.OPIESOF REVISE() SITE PLAN FOR REVIEW AND APPROVAL PRIORTO.ISSUANCEOF
BUILDING PERMIT.
sjv