Loading...
HomeMy WebLinkAboutMiscellaneous City of College Station POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION. TEXAS 77840.2499 Decembe rl 2, 1984 MEMORANDUM TO: JamesE. Jett , 1735Br ia rcrest, Bryan, TX 77802 Tim Chinn & Jill Mcintyre, Kling Engr., POBox 4234, Bryan, TX. FROM: P roj ect Rev i ew Comm i ttee : \.~\L; Jim Callaway, Ass't. Director of Planning\~1 Davi dPu llen ,Ci ty Engi nee r Celia Stallings, P&Z Representative Others Attending: Bennie luedke, Water & SewerSuperfntendent Ray Havens, Ass't. Electrical Superintendent Bob Epps,Ass't. Director of Public Services' Jim McCord, Elec.Power Engrs. Kim Johnson, Ass't. Zoning Official Shirley Volk, Planning Technician SUBJECT: Parking Lot Plan ~ Texana Professional Building (84-433) The P.R.C. met on this date to review the above mentioned project, and recom- mend sa pproval wi ththefollowingcondit i cns;" : (1 ) S,ubm i talet terreques ti ng unde rg rounde lectr i ta 1 service. (2) Furnish electrical load data requirements as soon as possible. (3) Coordinate trash container requirements with the Ass't.Director of Public Services. Use ofa 6 cubic yard dumpster has be~n suggested. If this dumpster is to be shared with ,the Texana National Bank,furnish a Jetter of agreement regarding same. (4) The existing sewer line on the west side of this property will require a utility easem~nt, wfdthto be a minimum of 15 feet. It is noted that the stairs is currently located in that easement. The developer has agreed to relocate thestalrs out of the easement. The footing of the building must be located out of that easement, and below the'sewer line. It is preferred that easements be kept clear of trees; relocate the trees shown in easements to avoid possible confllctwithutllity service. Locations 'to be coordinated with Asslt. Zoning Official Johnson. (6) Compliance wlt.hP.R.C. drainage statement is required. (7) Developer has stated that ,some 'landscaping to be included on site should not be counted as required; include note regardtng same on site plan. .kAny changes'toan approved site plan must be cleared through the Office of the Director of Pl~nning. SUBMIT 8 COPIES OF REVISED PLAN TO PLANNING DEPARTMENT FOR APPROVAL PRIOR TO CONTINUING, WITH STEP I I OF THE BUILDING PERMIT PROCESS. sjv