The public
that
(
aConditlonal Use
Appllcationi s .i n the
Mr. Callaway explained that this application is fo'r a. daycare.center to be located in an
existingshopplng center ahdis similar t02 r,equestswhlchwere previously approved. He
further explained area zonIng asC-I, PUD and R-6"thatthisrequest is for 15-20 children
and would be acornbined. clrop-In and longtetmcent.er.Mr.Kellyaske.d the size of the
bu i 1 ding and Mr .Ca 11 awaysal dhedi d not know. tAr. Kals.erreferredto a slteplanfor
a previously approved daycarecenter, and asked why we did not have olfle for. this request.
Mr. Callaway advised that the site plan for the center 1n Parkway S:quarewas -on.e the City
has on file, and that we do- not have oneavai 1 ab Ie forthi s shoppi ng .cent,er. Mr . Kel1 y
stated that he could not determine the size of this space when he was driving by, and wondere(
about requirements. Mr. Callaway said that we have no slzerequirements for a use permit,
andtnata daycare center must comply with other City and State regulations regarding size,
number of children, etc. The publlchearing was op.ened. .
Bob Pavl inskl came forward as a representative of the applicant and stated.the lease facility
(
(
t"'l:7L 1"1 t nu res
~ 10-20-83
page 3
th.e
Mr. Kelly made a mot on to approve thisCon,dlti ona lLJseP.ermit,l imitlng the numberAof
chi 1 d ren a 1 lowed to' 5 . Mr . Kaiser seconded .th 15 moti on . Mr. Martyn sa i d j ftheComml"s~i on
had no objectlons to limitIng the number of children allowed below tnatofState stand:ards',
P&LMlnutes
<~ 1 0-20-83
page 4
why not
cern of
(
Mr. Miller asked about tnestandingrow of treesintnedrainage area,and wonder:.edif they
WQuld be considered a buffer. Mr. Mayo asked Mr. Callaway if the depth of theC-l is out-
'side the requiredR.O.W. and Mr. Callaway indicated that it Is.
The public hearing was opened ,and Don Garrett, engineer/surveyor of thi sprojectcamefor-
war.d and poi nted out thedeptn on the inapi si ncorrect a,ndneeds to be shifted and further
that the t.rees in> the drainage area will be used as a buffer. He also pointed outaCi.ty
of Bryan transmission line whIch cannot be shifted and is afacto.r in ,planningth,e develop-
ment of this land. Mr. Garrett said the proposed C-) tract is 455 ft. deep from the exist-
in9 R.O.W., and 344 ft.fromtneextendedR.O.W. Mr. Martyn asked if the appli.cantwould