Loading...
HomeMy WebLinkAboutMiscellaneous City of College Station POST OFF~ICE BOX 9960 1101 TEX!\S'i\\'ENL~E COLLEGE ST/\TION, TEXAS 77840.2499 May '4, 1983 ~I ~1EMO RANDUM TO: Planning and Zoning Commission J . \1. Wood FROM: Project Review Committee: AT Mayo, <Di rectorofp lanni ng David Pullen, City Engineer David B. Hill, ChairmanP&Z AJ' ~ Other Staff: Harry Davis, Fire Marshal Joe Guidry, Electrical Superintendent Jane Kee,Zoning Official Dan Dupies, Ass't to Zoning Official Jim McCord, Elec.Power Engrs. BfllGupp, GTE Shirley Volk,Plannlng Technician SUBJECT: 83-507: SITE PLAN PERMIT - Sturbridge Condos located in the Eastmark Phase II Subdivision The P.R.C. met on May 3, 1983 to review the abovementioned project and recommends approval with the following cond i tions : -;', ( 1 ) Landscaping note should include the type of seed to be used for groundcover. Alllandscap Lng notes should be> more spec i fic, i nclud lng perhaps the number of various items (# trees, #shrubs, types, etc.) TheP.R.C. suggested that aconceptua 11 andscapi ng p 1 an of on.e uni t ,coul d bep resented to the Comm is sian for review with the agreement that a total landscaping plan to be presented prior to issuance of a Certificate of Occupancy. Entire center boulevard area, including the turn-around, must be marked as Fire Lane. Dumpster pads must have minimum interior measurements of 12lx 12'. Location of dumpster to be approved by the Director of Public Services (Mac Allen). Site/Grading Plansa'cceptable to the City Engineer are required. If any grading falls into> the limits of the Flood Plalna dev'elopment permit as required by Ordinance 1301 regarding Flood Hazard Protection will be required. Accurate creek location and topographic lines must be shown~ Submit a let-ter tot-he Electrical Department regarding underground service. The 15 ,ft. center circle (shown as belnglandscaped) in the cul-de-sac may caus~,." turning problems for large,vehicles. Suggest that either be paved, or the landscaped area kep~minimal (smaller than shown 15 ft.). (2) (3) (4) (5) (6) (7) *Any changes to an approved site plan must be cleared through the Office of the Director of Planning. SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNING DEPARTMENT BY 5:00 P.M. ON FRIDAY MAY 13th TO BE1NCLUDED ONP&ZAGENDA MAY 19th. sjv