Loading...
HomeMy WebLinkAboutMiscellaneous ", THEEFFECTSOFTHEIOO-YRFLOODPLAIN ON THE PUBLIC SERVICES WAREHOllSE COLLEGE STATION, TEXAS I. THE FLOODPLAIN A. FEMASTUDY B. WALTON & ASSOC. STUDY II. OPTIONS A. CHANNEL ...IMPROVEMENTS 1. HAS BEEN DONE 1913 2. THE BACKWATER EFFECTS FROM THE BY-PASS NEGATE ANY BENEFIT OF THIS OPTION (WALTON STUDY) B. FILL IN THEFLOODWAY FRINGE 1. COULD RECLAIM ABOUT 8 ACRES USING 68,000 CY OF FILL@ $4.50/CY...$306,OOO.OO 2. ELEVATE STRUCTURES ON FILL C. OPERATE IN THE FLOODPLAIN 1. USES ALLOWED: ALL ON THE CONDITION THAT THE IMPROVEMENTS CAUSE NO ADVERSE EFFECTS a. STORAGE OF MATERIALS (1) NO BUOYANT MATERIALS (2) NO HAZARDOUS MATERIALS b. PARKING c. LANDSCAPING d. NON-RESIDENTIAL FI.OOD PROOFED STRUCTURES D FLOOD PROOFING MEASURES 1. CONTINUOUS WALL OR BLOCK FOUNDATION 2 FILL (SEE II.B. 2.) 3. ELEVATING ON PILES OR COLUMNS 4. LEVEE S .... AND FLOOD WALLS 5. WET FLOOD PROOFING a. MATERIALS RESISTANT TO' FLOOD WATERS b. COMPENSATE FOR HYDROSTATIC LOADING ELEVATE MECHANICAL. EQUIPMENT