HomeMy WebLinkAboutMiscellaneous
City of Colle e
POST OFFICE BOX 9960 1 101 TEXAS AVENUE
COLLEGE SfATION. TEXl\S 77840
Project Review Committee t\./
Al Mayo, Director of Planning l~i
J. Behling, Planning & Zoning Chairman
Other Staff:
J. .Kee, Zonlng Official
H. Davi s,.Fi re Marshall
M. Smith, Ass't to City Engineer
J. Guidry,. Electrical Superi"ntendent
G. Ford, Public Works Director
B. Luedke,. Water & Sewer Superintendent
J._ McCord, Electr i c. Power Eng:.
J. Braswell, GTE
.S.. Volk, Plann'ing Techn.ician
Enclosed garages must either be separated by 15ft. from the
bu i 1 d i ngor e 1 se.attached . Covered only parking wh.i ch is
open on 3 sides will be acceptable as located.
An ,additional fire hydrant coming-in from Balcones and located
-; at spot designated by the 'Fire Harsha 11 ~\/i 11 be necessary_
that utilities be underground.
page 2
PRe Memo - Rio Grande Villas 82-421
Need ten (10) copies of site plan by
*Any changes to the approved
th~ Director of Planning.
.sjv
POST OFFICE BOX 1000
BRYAN, TEXAS 77805 · 409/779-5622
'''6
August 10, 1984
Mr. Tony-Jones
Tony Jone~Con.s.truct'ion Co., Inc.
P.O. .DrawerAT
CollegeStat'lon, Texas 77840
RE : Villa .on the"'R; 0 Grande .
Dear .M:r.. Jones:
I inspected .the concrete'drainage flume drai.ning thesubject.p,roperty
'Wednesday afternoon.w;-.thMr. .Dave Pullen ,'of the City.ofCollegeStation..
Stormwater. runof.f whi ch formerlyfl owed as .sheet flow onto thee; ty
of Bryan substati on "adjacent to this, project has. now. been 'increased and'
i.s concentrated 'at onepoint\by thi's flume. . 'This has resul ted in soi 1
erosi on on our property whi ch 'i s unacceptable to the City.
Anengineer'ing design....for .this flume:'has never been submitted to
the City'.of Bryan 'for ap'prova.l' 'and:.the flume has beencons.tructed on
our'.property. wi thout.:'.~ur .'permission.
'Pl,ea.se...arran:ge' to....have:"'an.:eng; neeri ng.desi:'gn':with' S u.pporti ng
ca 1 culation'ssubmitted,.~.to."'tJ:ri$'o.f'fic'e""for"'approval."., We'wlll. expect
construct; on 't.o" commence'immediatelY':a:fter'our':;approval.
. We"havepa;ti entlywai ted. a, long time forth'is..prab) em to .,be~ co.rrected.
Therefore,' ':1 expect 'all,..'of~. ..the.acttons mentioned '"; n . 'the preceed-i -ng.' paragraph
to be accompl';shed:'by."S'eptember"'30., .1984. J.f this design and construction
has not been'completed"by t'his,date,'.I-:w;'l" turn this mattet over to our
.City"Attorney...for:"furth.er action.. .
Please do not hes;-tate tQ.-contact.me"at'].79-56.22, extension 430 if
you haveanyques't'i ons" concernfng';'thi's matter.
. Ve:ry truly yours,
~ cy~
'L. . Richard Ke ll,er
Dra';nageEngi nee:r
LRK:sm
cc: DavePullen-CityEngineer, College Station
Ed 11schner;Jr., ~'Uperatlons Mgr. f'tlunlClpal SerVlces
Don Wolf - City Attorney - Bryan
File
!~-),~)