Loading...
HomeMy WebLinkAboutApplication PARKING AREA REVIEW APPLICATION P&Z Case No. ~.-.4-/7 -/: Date Received . JJjg//JJ3 / / !~6" c; ~o ~ t73~~;2/(? --17v JPOO Applicant _---A...L \ tv I t{I"j~.5 I~02 Phone Address of Applicant ~(J()O Owner 4t Address .5 .~.~ t1 S if 11vv? Architect, Engineer or.Designer .. .' . Jf'F . .1:(67/.(- AlA-hxl; Address Phone ~~..:~~~~' :.. :. No. of parking Location , . It ~(Jf3 [)IVI5IDJV" Name of Project No. of .parking THE APPLICANT CER TIFIESTHE ABOVE INFORf'1AT rONTOBE TRUE AND CORRECT ~#~9 Signature'" of applicant , . Olvner or July 30, 1984 BUILDING PERMIT.APPLICATION Initial Review -Lube King ENGINEERING · COMMENTS: .."']) (1) This project as submitted, was not previously reviewed on Lot 3. It was proposed for Lot 5 - (83/417). (2) The dimensioning of the lot frontage is either inco'rrect or areplat is in order. The platted frontage is 100.00'. (3) Grading and drainage plans must be submitted showing existing and proposed. elevations. (4) How is the basement sewer drained and what is it collecting? If it is to drain to the sewer system it must be equipp,ed with'<petroleum product separation devices acceptable to this office. (5 ) Holleman Driv.e is ,proposed to be widened in the near future. The existing curb line will be moved back about four (4).feet. The new curb location must be accounted for in this site plan.