HomeMy WebLinkAboutMiscellaneous
City of College Station
POST.OFFICE BOX 9960 IIOI..TEXAS AVENUE
COLLEGE STATION, TEXAS 77840
March 15, 1983
MEMORANDUM
Presubmission Conference
Al Mayo, Director of Planning ~
David Pullen, City Engineer
Joe Guidry, Electrical Superintendent
Mac Allen, Director of Public Services
Jim McCord, Elec. Power Engrs.
David Ri 1 ey, GTE
Shirley Volk, Planning Technician
Earl with Jerry Bishops Engrs.
Attending:
SUBJECT: Final Plat - Vacating & Resubdivision of Lot 1, Block One & Lot 1,
Block Two (3.95 A) Brentwood' Section Four (83-211)
Staff recommends approva lwi th the foll owingchanges:;'~:
(1)
(2)
Need aLOft. utility easement on both the northerly and easterly
property lines.
Along the area where .the 10 .ft.drainageeasement is shown,an additional
10 ft. 'easement Is required , making a total ofa 20ft ,,' d ra inageeasement
at that location"
Along the area designated as rl25ft.drainageand utility easement", these
easementsmus the'separated; that a rea shaul ds how. a 25f t .d rai nage ea semen t ,
P 1 usa separate 1 Oft. utility eas.ement, if ut i lities a re brought in a t that
polnt. The ProJect Engineer'should contact Joe Guidry, the City's Electrical
Superintendent concerning the exact location of this 10 ft. utility easement.
Also, the ProJect. Englneer should contact Mac Allen, the City's Director of
Public Services concerning the location of the drainage easement, and exactly
whatutillties, If any, hewill allow to be located in thedrai'nageeasement.
(3)
*Any changes to the approved Plat must be cleared through the Director of Planning"
FURNISH 10 COPIES OF REVISED PLAT TO PLANNING DEPARTMENT BY 5:00P.M. MARCH 31st
TO BE INCLUDED ON AGENDA OF P&ZAPRIL 7th.
sjv
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840
October 26, 1983
,PRESUBMISSION CONFERENCE
AttendIng:
~.
Al Mayo, Director of Planning r
David Pullen, City Englneer
Bennie Luedke, Water & Sewer- Superi'ntendent
Harry Davis, Fire 'Marshal
Joe Guidry, Electrical Superintendent
BIll Rtley, Water Department
David Rilay, GTE
JIm McCord, Elec. Power Engrs.
Shirley Yolk, PlannIng TechnIcian
":Larry We'll s &,.John Olsen, Jerry B' shop' & Associates
SUB'JECT: Final Plat -Vacating & Resubdivision of Lot 1, Block 1,& Lot 1
-Block 2 Brentwood - Sect.ion Four
A presubm'ssfon~confer~nce was held on this date to review the subject
replat, and' s.taf'frecommends'approval'of the plat"with' the following
cond i t lons : 1~
The access ea'sement'alon'g' Texas 'Avenue should say "prlvatell.
A statement on the plat is required from the,.,surveyor which
certJ,flestnat the.storm dr"ainage piping' is wIthin the 10 ft.
easement.
(3) The lo't"'and:b.lock: numbers must be changed ..to reflect t'h is repl ated
lot-as Lot lRBloek,2, and-th.e tract which ,;-s shown 'on this drawing
but. is nota part o'f",this.pl~.~t",shJouldbe desIgnated' Block 1 lot 2.
Th Is 'p l.at. . should 'ref:lect t:i:l1 ~il'f t li ty 'easements' as' :shown on 'the" :
'" approvedwat~rpl~n ..":,.,:>~ '
. .-," .-.-'.< .: .'. .',.... , " ....; '. .".;.. .....;-
',.,No pub 1 Ie comme'nt.wl. 11 be':::r'ece'i vedatCommi '551 on;'l11eetYn:g" un less' requested
by a' member 'of, the<~ommr ss ion and allowed.by the :cha it-man. App 1 i cant. may
subml:t anywr"i tte'n':commenttothe Commi ss t on by foil i ng sam'eon the Fr.lday
preced i n9 the scned'lJ"'ed:meeting . '
'*Any cha'ng'es to
the "Olr'ector' of
plat must be' cleared through the office of
. el~
~~~~~
.."71};fr-'.. ...-" .
~.. ......~.~~-ee~
., ....~.~~....~.A~..:~~~..........................~~(~
~. LiP ...-? ./?~J
~_..__.~~~.,. ,.+ ~,.... .. ",,,"." ....., ...._'~ .' .e;--,.~
.~ ....~.;ei~#.....~.....~
~ . .-
"_'__~..~.'.'.'.~........._._.~....._.".'._...'.'.'~._..~._'..;..._...,.'...~...~.'...~,.'..'..~.'~._.'.......:.....~.........._......_....~..~...'.............:........_....~......._.~~._~,....:'..:...:.:...~d....~.':......_....~..~..~ ~..~....~.'.:.......:..............~ .......~.. '...~. ..-._....~..................~.~... .~
. ....~~. c~~.. .