Loading...
HomeMy WebLinkAbout7-11 SW at Wellborn 15 check, start upth.; ~~ with the $. AU s, charts, and stort-upinFarmatlon tequeit4Jtd by unit completed and rd urned to manufacturer as . A t:Ht'f,umhhed to the customer prior to fino I acceptance of '~..:.. CONTRACTOt ~ESPONS'81LfTIES JT -' "= " " " , -~- ,,- _' - ,=' , -w , or dote or dende ~roin "ne tftoteriol sholl b.314" No e.llCtros sh;"" be allowed due to femiliar . with which this Con~Q'C~ should fines sholf .. .......0( being opened as close to tl4e evaporator os possIble to oj effective c'em ' Ion Iystem and operotion 10'. thet this con.actor by the ow,...' My pllrt . ed In on 0 verti.col s lope prior to codes). e receiylng floor This C CF\tr-=tor thall guarCF\te't all WOf'k and materials. the system to ,,. free from defects . contInuo I drains from a where , as shown on the .'other mecho"rcal Meont/at f.. This C<?OtrOCtor agrees tc reploce wi or which proves e)(pense'to t'he wi one Carpbration A nv.....ye. fact~ w~anty Oft motor compre,sSOI's shall ,. filled out In the nQl"l1e of the owner, '~Iiv... ta the own_ prlOf ro the flnol occeptl::lflCe of work performed. . ,f ....aoed c",-ti.,. I through the wolk-in cooleufre'!Zet required hortterS', condensote drein fines, strapping, ond refrig_ont pipingstiOU be sea'-'d by the mechanica' controet. "prev.,.t moisture from ent.it... the insulotion to provide 8 vapor barrier. Th.. Confracter ~If furnish to the owner r.,...e...tative oJ! certiFicotes .f Anal inspection iafMf ~I fr. Inspecting o~Ities hovi"g~j"_iction. it; UNIT SPECIFICATION .me. . , , The mechanicW controc:tOr sholt ieo' off 01 I roof pot....through openings required fer refrigerant tubing arid Ii.... in accordance with requirements doted on the mechanical pions. ACCE ES: El.ECTRICAl Plenum _d ploi'fOfl'l1 all be Stiles Corf:!Orati on pointed to match the f()()f tOp unit. cated from golvaniz sh~€ . f All the provisiont for wking"'~)(Cept final c...nections shall be by the electri~olcOtltr-aetor. FI~!1 shgJI be bt'the refrigeration contractcr, if, '<<01 rOhor situations t. . Insulated roof curb sholl be Stiles Corporation E PPC - 345-C. , I CONTRACTOR CLEAN-UP RESPON$J8111T1ES Hlteis sh.n be Pure- Aire Industries, Inc., p.O. 80x 338, locklin, California 95677, 1 thick 4 ply permanent-type 14" x 25" to fit foctory fabricated filter section In Stiles plenum. Remove off creating from premises. actor shoU hong thi eoifs tn QC;cor- , to include a face for tne "e'! ~.cl c... condensing surfaces If t'eqtlired. DUCTWORK: ~c T ouch up and repoir, point as required. Duct work ond connections fabricated of new galvanized sheet steel. Construction gouges in strict accordance with the latest edition of the NA Manual ond . INSTAlLATlQN AND START-UP PROCEDURES f duct runs not to exceed 6' - 0' in length. refrigerant grode, Type l, hard , Type C I horo drown on 01 I expansion volv." holl Pipe sid,., Is I.nacted on the mechanical sheets for each All Instructions and start-up procedures with other pertinent information is ine -contractors .id package which is provided by the SoutMONi C~ation prior to aword of . . COtlMac't. Insulate aU ductwork with fibergloss blanket insulatlonhovlng 0 density of 3/4 pOund per cubic foot and foced witn factory-applied FRK facing. AIR TERMINAL DEVICES: I tubing ,Uns shall be sloped to-w~d the compressor, and/or" P" trap 1 Inch y return ou! ets in tr,e area I e Stiles C \8 er. y outl eh in the ame Bailey type DAf" 1 oment Room sholl be simi or and equal to Tu e and volume sUver) ,sholl b.e u thlt"tstallation. , , piping shall b_ strapped to .re ,iping support. T~is strapp-i.ng sholl be copper. Itrapfttltg Is uted, It shaUbe lined wi.... insulating mat.rlol to prevent Ic electro.,.I.. c E ~I s: Provide and install trapped conde mate drain I os to meet local EL .. ,...,.' . ,A.l -'iring low ,-,tricel tor if its. connect SOUTHLANO."C STAR DIVISION 20 BUSINESS PARK SUITE 300 AUSTIN t TEXAS 78 (512) 346- 2260 . .t EPa Design Center . D 8400 I I. .. .. , .