HomeMy WebLinkAbout7-11 SW at Wellborn 15
check, start upth.; ~~ with the
$. AU s, charts, and stort-upinFarmatlon tequeit4Jtd by unit
completed and rd urned to manufacturer as . A
t:Ht'f,umhhed to the customer prior to fino I acceptance of
'~..:..
CONTRACTOt ~ESPONS'81LfTIES
JT -' "= " " " , -~- ,,- _' - ,=' , -w
,
or dote
or
dende ~roin "ne tftoteriol sholl b.314"
No e.llCtros sh;"" be allowed due to
femiliar .
with which this Con~Q'C~ should
fines sholf .. .......0( being opened as close to tl4e evaporator os possIble to oj
effective c'em '
Ion Iystem and operotion
10'. thet this con.actor
by the ow,...' My pllrt
. ed In
on 0 verti.col s lope prior to
codes).
e receiylng floor
This C CF\tr-=tor thall guarCF\te't all WOf'k
and materials.
the system
to ,,. free from defects
.
contInuo I
drains from a
where , as shown on the
.'other mecho"rcal Meont/at f..
This C<?OtrOCtor agrees tc reploce wi
or which proves
e)(pense'to t'he
wi one
Carpbration
A nv.....ye. fact~ w~anty Oft motor compre,sSOI's shall ,. filled out In the nQl"l1e of the
owner, '~Iiv... ta the own_ prlOf ro the flnol occeptl::lflCe of work performed.
. ,f ....aoed c",-ti.,.
I through the wolk-in cooleufre'!Zet required hortterS', condensote drein
fines, strapping, ond refrig_ont pipingstiOU be sea'-'d by the mechanica' controet.
"prev.,.t moisture from ent.it... the insulotion to provide 8 vapor barrier.
Th.. Confracter ~If furnish to the owner r.,...e...tative oJ! certiFicotes .f Anal inspection
iafMf ~I fr. Inspecting o~Ities hovi"g~j"_iction.
it;
UNIT SPECIFICATION
.me.
. , ,
The mechanicW controc:tOr sholt ieo' off 01 I roof pot....through openings required fer
refrigerant tubing arid Ii.... in accordance with requirements doted on the mechanical
pions.
ACCE ES:
El.ECTRICAl
Plenum _d ploi'fOfl'l1 all be Stiles Corf:!Orati on
pointed to match the f()()f tOp unit.
cated from golvaniz sh~€ . f
All the provisiont for wking"'~)(Cept final c...nections shall be by the electri~olcOtltr-aetor.
FI~!1 shgJI be bt'the refrigeration contractcr, if, '<<01 rOhor situations t.
.
Insulated roof curb sholl be Stiles Corporation E PPC - 345-C.
, I
CONTRACTOR CLEAN-UP RESPON$J8111T1ES
Hlteis sh.n be Pure- Aire Industries, Inc., p.O. 80x 338, locklin, California 95677, 1 thick
4 ply permanent-type 14" x 25" to fit foctory fabricated filter section In Stiles plenum.
Remove off creating from premises.
actor shoU hong thi eoifs tn QC;cor-
, to include a face for tne
"e'! ~.cl c... condensing surfaces If t'eqtlired.
DUCTWORK:
~c
T ouch up and repoir, point as required.
Duct work ond connections fabricated of new galvanized sheet steel. Construction
gouges in strict accordance with the latest edition of the NA Manual ond
.
INSTAlLATlQN AND START-UP PROCEDURES
f
duct runs not to exceed 6' - 0' in length.
refrigerant grode, Type l, hard
, Type C I horo drown on 01 I
expansion volv." holl
Pipe sid,., Is I.nacted on the mechanical sheets for each
All Instructions and start-up procedures with other pertinent information is ine
-contractors .id package which is provided by the SoutMONi C~ation prior to aword of
. .
COtlMac't.
Insulate aU ductwork with fibergloss blanket insulatlonhovlng 0 density of 3/4 pOund per cubic
foot and foced witn factory-applied FRK facing.
AIR TERMINAL DEVICES:
I
tubing ,Uns shall be sloped to-w~d the compressor, and/or" P" trap 1 Inch
y
return ou! ets in tr,e
area
I e Stiles C
\8
er.
y outl eh in the ame
Bailey type DAf" 1
oment Room sholl be simi or and equal to Tu e and
volume
sUver) ,sholl b.e u thlt"tstallation.
, ,
piping shall b_ strapped to .re ,iping support. T~is strapp-i.ng sholl be copper.
Itrapfttltg Is uted, It shaUbe lined wi.... insulating mat.rlol to prevent
Ic electro.,.I..
c
E
~I s:
Provide and install trapped conde mate drain I
os
to meet local
EL
.. ,...,.' .
,A.l
-'iring
low
,-,tricel
tor if
its.
connect
SOUTHLANO."C
STAR DIVISION
20 BUSINESS PARK
SUITE 300
AUSTIN t TEXAS 78
(512) 346- 2260
.
.t
EPa Design Center
.
D 8400
I
I.
..
..
,
.