Project Review Committee . '~.~
AJf.tayo~ ...Directorof.P 1 anning', A '.:
J. 'Behling,' Plahning & Zoning hai rman
Other Staff:
J. Kee~ Zdnin~ Official
H. Davis, Fire Marshall
J. Guidry,<ElectricalSuperintendent
G. Ford, Publ ic ,Works Director
B. L.uedke.,~Jater& Sewer Superintendent
M. Stnith,Ass.~tto City Engineer
J.. McCord,' ElectrlcPower Eng.
J.. Braswell, GTE
'S. Volk, Planning Technician
Post Oak. Square Shopping Center 82-414
TheP.R.C. met on ,Tuesday, April
for . the above Inentroned.shopplng
wi th the following cpndi ti ons:-':
~~eVisedSitePlanneededwhichshOW5 dimensions. (8 ft. setback from
edge ofparklng to front' of property l'ine;: typJ caJd imens ion for
parking spaces',.'lncluding depthand'widt.h;' dimension of drives;
setbacks of :buildings on side and back property Jines; etc.) Plan
should also show linear islands..
.to review the parking lot plans
The P.R.C. recommends approval
~CityWill need a20 ft. easement along the entire east and south sides.
of the . property for uti 1 ity li,nes.Parki ng is allowed. onth is ease-
ment, but building on it is not permitted. .
An 8 ft. minimum (preferably ,15 ft.} -distance must be allowed from an
energized concluctor,. w ithpav i ng 5 ft. from the pol es ,.and protection
around the poles provided. .
.~'..'..'...."('" 4)............,.'.........D.ra.....i n.a.9...e ,t.,.....o...... '.t.. .....h.......i. s. Sh. '.0... PP" i ng area. .i S.'. .to . be. . worked. out \J:~. i th .the.. .'.p.,.ost ..oa.k,
l.2Ma1l, if possible, and if this proves not to be possible between the
existing mall and this proposed shopping ,center, the City'will help
something out.
page 2
PRe Memo -Post Oak Square
(5) Access between the existing Mall and this proposed shopping center
should be prov'ided, and if cooperation cannot' be agreed upon, the
City should be notifled and will then intervene and try to reach an
agreement. Developer should get a letter from the Mall which indicates
~hether or not the Mall wil.] cooperate on both the dra'inage and'access.
(6) Buildings A & 0 will require sprinkler systems unless they are divided
into areas less than 15,000 square feet with'units separated ~y 4 hour
firewal1s.
.vPJ
The island
'filled and
to be raised curb, i.s'lands, either'
s6m~ other acceptable manner.
The parki ng rows.'shou ld notbe..l ong.erthan 15 spaces wi th whee 1 stops,
or an acceptable alternat.i ve plan should be . submi tted ; suggest end
islands with at least every third row having solid wheel stops or
continuous raised curb perhaps with island structures around 1 ight
pol es:.for .protect ic)nofpo 1 es. .. .' ....,.
"'~':.: .....:.......::: .:.;~. .........~.:..~....,....:...... .....:...: ~;....:....'..~.,...
.' .:.:-'<:..:'. :.... ":.." .;' ......... .."::".~: ":'>.':-:~.~:. :.".:," .....:... ..... '.:.' . ;...... :...~:.....
~..;......:...:..;..........'... ..~:......:...<.:..:'... '.;':.'~"':'.:'.: ..:..,..:......-:.. ...... ~_....:.. ." ...:........;.:...:........ ...... .... .:.
Use exist ingcurbcutswtthextel1dedisl andso r re 1 ocate the cu rb cuts
sot.hey' are located."closer:.to each corn~r of-the .shopp iog center, "next
. .. \ ..... '. .'. ..' . .'.', .' .' .
to the areas . indicated "Not Part of Shopping Center & Reserved for
Future Dev'elopment".(H~eservedfor Future Development"should be
added to these locations'on site plan.) Relocating the curb cuts
would,~:enlarg~.thearea between the cuts. and thentraffic,should be
carriedthrough.tothe' first break.or irytersectionof1.t.~e parking lot.
: '
'~
fr
City of College
POST OFFICE BOX 9960 1 10 I TEXAS A'v'ENUE
COLLEGE STi-\TION, TE>G-\S 77840
Apri l,27,1982~'
~.
The following: points were covered In the P'.R.C. meeting on this
date, and .shquld be followed up on vlith the 'appropriate people
in charge:
Electric willbe overhead, with meters "gangedlt for "lndividual retail
locati'ons at specified locations~
A should be separated with a .firewall.
If there are more than 6 uni'ts leased' in Building A",a main
. disconnect will be necessary.
I nformat iarl .regard i ng ut i 1 i ty requ i rements must be fur,n i shed
to the Electrical Supe~intendent.
.Utility.service to building E to be overhead
acros s'.H i 9 hway 30.
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840-2499
December 16, 1982
MEMORANDUM
TO:
Pl anning and Zoni ng Dept. - Jane Kee
Building & Inspection - Coy Perry
FROM:
SUBJECT:
David Pullen, City Engineer
Post Oak Square Shopping Center ~ Site Plan Review
I have
and
prior
des;
unti
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION, TEXAS 77840-2499
December 15, 1982
PBR Architects Inc.
Summit Tower
11 Greenway Plaza Sui te
. Houston, Texas 77046
ATTENTION:
REFERENCE: Post Oak Square Shopping Center, College Station, Texas
a. Your letter of 11/24/82 to Mr. Bennie Luedke
. . ,", ," ...... ',' .
. .. ...... '.' ..". . , . ...... . .
b. Letter..0\P~l4.t.Parker to Michae1J. Ross dated 11/16/82
c. OLlrtel.:ephone conve:rsati on of Dec. 8, 1 982
Dear Mr. Ross:
afterarev.je'w o'f' your project
to .you:the fol'l'PWi n9:
Publ i c acceptance of the storm sewer will on1 ybe for the trunk 11 ne-.extending from the
south corner of your property tb the creek. The City of College Station has no desire
to maintain. your on site. drai -nage. However, if suff; cient space is' ava i'labl e along the
southerly side of your pr'operty, we may consideracceptance"of the stormseweri'n that
area after proper'designis completed and submitted. Your storm drain grates shall be
designed to prevent bicycle wheels dropping into them.
Your proposed outfall extends beyond the :propertyo.ftheCityof Coll,ege Station to
the creek. You must provide an easement for that portion of 'your work not on City
property. Your piping plan and profile sheets donottndicate.the location of
Holleman. Drive in the vicinity of your station 12 + 75. I expect your contractor
would 1 iketo know about aCCess at this point. .Also you do no<t show your storm sewer
crossing o.urexi sting sanitary ,.sewer line near station 16 + 50. You. may have a conflict
whi.chneeds to be considered at that point.
When you install your sewers andwat~r linesalohgour electrical. power lines.youmust
be particularly .car.eful when crossing our underground lines eminating from our substation.
The power from or to our substation must not be interrupted. 1 have visited with our
electrical people and they suggest you 'consider boring under rather than opening
cutting under these crossings. Also you \'Jill be passing close tosbme of our guy
anchores and pol es. They must not be disturbed nor sha 11 the soil ~round them be
lo...o.sened.. If t.he.f. need to be reset due to your work you can expect...: ..to assume the full
cost .there~..,.
It has long been the position of the City of College Station that ..the supply of water
for domestic, commercial and .fire protection uses and collection of sewage is our
responsibility and in the best interest of the public health and sq~etyof our city
for the city to own and maintainthe distribution and collection sXf'tems therefore.
Accordingl y, I. shallrequirepuoli.cdedicationof easements fora ll'wa terand sewer
lines thus empl oyedandthey must he desi gnedby a ReQi stered Pro f'~~s i ona 1 Engineer in
accordance with. the Texas Engi neeringPractice Act as currently am~~de9:-J For these
lines you must provide a utilityease.ment 20 feet in width which willl ~ncomp,ass the
pipe.
The water di stri buti on system must be desi gned to meet or exceed th~ foll owi ngcri teri a
and a di stri buti on. system analysi smustbe provided for my reviewa~d approval.
a. Thehydraulicgrade<atth(3
b. Peaking.factor..of.......5..
.'! '- - " ," " " .,", ....- ,'.-, ' .
" . ..',: ' ..> " ,'" ,".,.:.
. . . " '." .. . . .. c... ' . . _ . . .....",':," '. . . .' ~
- '. . '. -,>:,"""',:: ;'. -'- . '.' -.. .," . '. ,- .
c. :Maximumheadloss.of5" 'per'
fl. ows..thts. . may.' .... be 'exce eded.
With fire
.; ..' ,.' , "'~', - -, - ,'. ;. . - ','. . . - . - . - . . - '. .
d. Fi re protecti on sys tern's h~jl<bedes i gned to produce 1500 gall onspe r mi nute
with a minimum residIJalpressure of20psi . (Minimum requirements of State
Board of Insuranceforme'rcan.til e areas).. Youranalysi sshalldemonstrate
the capability of the system to meet the fire demands at peak hour (factor
of 5 times averagelwi,thtwo.hydrantsin. use.
e. Analysis shall be provided for the system with no fire demand, one fire demand,
and 2 fire demands. 8 in. diameter lines are minimum in mercantile areas.
Water temperatures in excess of 100 of are normal in our water system. This fact must
be considered in the selection of water distribution system piping materials.
Calculations for pipe classing are required. If PVC water piping is used in the water
distribution system, it must meet the requirements of AWWA SpecificationC-900.
~ ( ...
You wi 11. berequiredtosubmi.t .sanitarysew.er plans and profiles, and easements as
previously discussed, for my approval on all.... collector lines serving all present and
future building sites witn;inyour.tract. Twi'll approve noli'nesize lesstnan 8
inches di ameterfor -use in publ icsewers serving. commerci a 1 properties. Youmust
also p'rovide design forthe..sewer along the southern side of .the project and comply
, wi th muni c;pal standards, i. e., cleanouts are nOot perm; tt.ed. All connect; ons to
the collector of diameters greater than 411 shall be mad~ with a manhole. The'u~e
of SDR-35 PVCgravity sewer pipe<is prohibited 'by the City of College Station Plumbing
Code.
The i nformationrequired fora-pproval of thi soffi ceof works to be accepted and
maintained by the City of College Station shall include:
," ::",. .". ,', :' ..: ," -,' . .", ",' ~.:.' '. ~ ',':",".
All easements' shalf be'~r()vided to my office either by plat or by separate instrument
for my approval along with the design requirements for the public works portions of
your project before I can recommend the grantingofabuilding permit for this project.
Sincerely
~
cc:
Development/Property'Management
-
November 10, 1983
Mrs. Jane Kee
City of CollegeStatiol1
College Station,.Texas
RE: Post Oak Square Shopping Center
College'S tati on, Texas
Dear Mrs. Kee:
In accordance with today'stelephoneconversation,please be advised that we are
conscientiously proceeding with the striping and ,completion of . the ingressdri vewa y
into the referenced shopping center. It appears that we will be underway on our
landsca pin g, ,but ,will>not be co rnpletebySunda y,N ave mber 13, 1983, when
Weingarten's. Supermarket> will open. . .We wil1diling~ntly work . toward completion
of the landscaping with the understanding that if said JandscaI'ing . is not complete
by the time any other tenant is ready to open in the center, saicl tenant will be
delayed from opening until the Jandscapingis complete.
If this understanding and agreement is acceptable, please so indica te by signing on
the place provided below.
Very truly yours,
R~,
Raymon
RSLJ Ids
580 Westlake Park Blvd.e Suite 810-Houston. Texas 77079 e (713)870-0770
April 13,1982
Mr . Albert Mayo
Director..of City Planning
City of College Station
P.O. Box 9960
College Station, Texas 77840
RE: A 15.027 Acre tract, Morgan Rector League,
Brazos'County, Texas, Vol.366, 'Page. 501
Dear Mr. Mayo:
Investment Builders
Enclosed please find an application for site plan permit along with three copies of
the site plan for the above referenced property. If you have any questions please
contract our architects,PBR Inc., Dan Boggio, 713-965-0608.
Sincerely,
~~
Antoinette . Phillips
Encls.
777 South Post Oak Road Suite 880 713 626-0862 Houston, Texas 77056
I BR
PBR Architects, Inc.
Summit Tower
11 Greenway Plaza
Suite 614
Houston, Texas 77046
713/965-0608
February 2, 1983
Jane Kee
Planning & Zoning
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Sta.tion,Te'xas 77840
Re: Post Oak Square Shopping Center
College Station, Texas
PBR Job #8116
Dear Jane:
In reference to our conversation,2-2~83, I have listed below your requirements
regarding the project referenced above. These requirements, as I..understand
them, must be complied with prior to. obtaining a certificate of occupancy from
the city.
1. A 6" high raised concrete curb must be constructed around each power pole
located in the parking lot, this curb must be part of a landscaped planter
surrounding. the pole.
2. A 6ft high raised concrete curb must surround each parking lot where the
'pavement ends.
If you have any additional questions and/or comments please call.
Sincerely, . ~/?
/7Jcrdr/~
MichaelJ. .~.~
Architect
MJR:mcm
cc: Ray Lister, Lister Properties Co.
Bill Parker, Civil Concept, Inc.
Calvin E. Powitzky Jr. AlA Daniel L. Boggio AlA Michael J. Ross
City' of College Station
POST OFFICE 130X9960 1.101 TEXAS AVENUE
CO L,LEG E STATION, l-EXAS 7784Q-2499
December 10,1984
M EfViORy!\NDUM
TO:
Planning Department
:::::i:~ ~:~;::e::ty Engine~
Post:OakSquareShoppi ngCenter - Sui 1 ding Permi ts and
Certificates of Occupancy
l ~.. !..
"......~ ~
FROM:
RE:
I have recei vedthesignature of Mr.' Mark Luhn, Leasi ngAgent for Lister
Properties, acknowledging lherequirementsplaced upon the above project.
With his signature I have no further objections to the issuance of a Building
Permi tfor the tanning salon . '
I have received the legal,descri ptionsforthe easements, revi ewed them and
transferred them to the legal department for preparation and execution.
cc: Lister' Properties, Mr. Raymond S. Lister Jr.
Art; san Group, Mra>tarry Muller
PBRArchitects, Mr. Dan Boggio, AlA
City of CollegeStadon
POST OFFICE. BOX 9960 1'101 TEXAS . AVENlJE
COLLEGE. STATION. TEXAS 7784O-2499
November 20, 1984
Lis ter. Pi~oper~;YCorqp~niY.
'SSO>We'st'[-ake' . Par k . Boulevar d
Suite 810
Houston, Texas 77079
AIT: Mr. RaymondS. lister Jr'.
RE: Post Oak Square Shopping Center, Coll~geStation,Texas
De a r Mr. List e r :
I am in receipt of your letter dated November 14, 1984 concerning
Certificates of Occupancy and BuildlngPermits for tenant
spaces. Tribble and Stephens representatives have been ,in
contact wi.th my office r.egardingcompletion of. the entrance drive
drainage structures. When I have the. metes and bounds
des c r ipt i on s of the water lfnee asemen tsp rep a red by a.. Reg i s t e red
Public Surveyor in my office and have verified their correctness
w'ith respect to the As Built pipe locations, I will forward them
to the legal Dept. for preparation of the easement document. At
the same time, I will .recommend to the Building Dept. that a
Building Permit for the tenant space may be issued under the
following conditions:
There will be no Certificate of Occupancy issued for, this phase
ora n y 0 the r ten ant sp ace b u 11 d i n9 pe r m its i s s ue d f or t his c e n t e r
until the entrance drive drainage structures are accepted as
complete in accordance with the Texas Dept. of Highways and
Public Transportation Standards and the easement documents have
been executed, returned to the City Attorney and filed.
Please sign a copy of this letter in acknowledgement of these
conditions of development and return it to my office.
IzI7/G't/
o a tel '
M C ~ · #,. ~ !r.-~' _L r;.
.1 . F~~l-
R . a ym.o n d S.' {l S t e rJ r .
J
KLING ENGINEERING AND SURVEYING
Consulting Engineers. Land Surveyors
(409)846-6212
4101 Texas Avenue
Bryan, Texas 77802
TO
DATE
Bi 11Ta 'CoJ1structionComan, Inc.
3900 Texas Avenue South, Suite 108
77840
PROJECT NO.
PROJECT NAME
ATTENTION
REFERENCE
Bill Tap
WE TRANSMIT:
D Under Separate Cover
[[I Enclosed
THE FOLLOWING:
o Prints
rxlCopies
o Originals
o Plat
fXIField Notes
o Plans
o Report
o Estimate
D Cut Sheets
D Computer Printout
DFile
D Contract
D
VIA:
flJ. Mail
o Messenger
o Federal Express
o Express Mail
o Special Courier
o Picked Up By Your Office
u need additional information,pleasedon't
o advise.
P. O. Box 4234
Bryan, Texas 77805
Ma 12 1986
Gold's G m -Additional ease-
ment for valve vault
FOR:
DYour Review & Approval
DYour Review & Comment
[Xl Your Review & Distribution
o Your Review, Revision & Return
o Your Sign'ature& Return
o Your Fileand/or Use
DAsRequested By:
o Please Acknowledge Receipt of
Enclosures
o Please Return Enclosures To Us
o Copies Of This Letter Of Transmittal
Sent To: Mr. Dav;dPullen
City Engineer
If Enclosures Are Not As Noted,
Please Notify Us At Once.
Signed:(Y~
/..................~""......<.
',-
/. ~-.... '\\
((~ (; )