Loading...
HomeMy WebLinkAboutMiscellaneous PRESUBMISSION CONFERENCE 4-6-82 9:00 a.m. Attending: P & Z Commissioner Kelly Director of Planning Mayo Public Works Director Ford Water & Sewer Suprintendent Luedke Asst. to City Engineer Smith Planning Technicial Volk SUBJECT: FINAL PLAT - POST OAK MALL (case 82-224) \. 1. Plat needs to indicate the name of the right-of-way. 2. Lots are landlocked. Have agreement in contract that allows access and easement. There should be a note on the plat to indicate common easement or right-of-way. 3. Ford queried what happened to "as built" plans showing water & sewer. In lieu of these plans, they were supposed to put up $6,000. Mayo to check with Paulson on this. If it's the City's to maintain, we must have plans. Lines should be defined on the ground for location purposes. 4. Easement sheet has no notations which indicate what utilities are in what easement. They can be called "utility easements" and then identify each utility ("water", "gas", etc.) on sheet. 5. Easement should'be 20 feet by the substation. Plat shows 15 feet. 6. A roadbed to the property was supposed to be established (from parking area to substation). If this is not done, we should be granted temporary access until the permanent access is available. sjv