PRESUBMISSION CONFERENCE
4-6-82 9:00 a.m.
Attending:
P & Z Commissioner Kelly
Director of Planning Mayo
Public Works Director Ford
Water & Sewer Suprintendent Luedke
Asst. to City Engineer Smith
Planning Technicial Volk
SUBJECT:
FINAL PLAT - POST OAK MALL
(case 82-224)
\.
1. Plat needs to indicate the name of the right-of-way.
2. Lots are landlocked. Have agreement in contract that allows access and
easement. There should be a note on the plat to indicate common easement
or right-of-way.
3. Ford queried what happened to "as built" plans showing water & sewer.
In lieu of these plans, they were supposed to put up $6,000. Mayo to
check with Paulson on this. If it's the City's to maintain, we must
have plans. Lines should be defined on the ground for location purposes.
4. Easement sheet has no notations which indicate what utilities are in what
easement. They can be called "utility easements" and then identify
each utility ("water", "gas", etc.) on sheet.
5. Easement should'be 20 feet by the substation. Plat shows 15 feet.
6. A roadbed to the property was supposed to be established (from parking
area to substation). If this is not done, we should be granted temporary
access until the permanent access is available.