HomeMy WebLinkAboutMiscellaneous
City of College Station
POST OFFICE BOX 9960 1101 TEXAS AVENUE
COLLEGE STATION. TEXAS 77840
May 28, 1981
MEMORANDUM
TO:
Planning & Zoning Commissioners
Frank Seeley, Hamilton McKinney, Architects
and Engineers
FROM:
Project Review Committee:
Al Mayo, Director of Planning ~
Elrey Ash, City Engineer
Ann Hazen, P & Z Commissioner
SUBJECT:
Plan review - Taco Bell
The P.R. C. met with Mr. Seeley on Tuesday, May 26, 1981, to review
the proposed plan. The P.R.C. recommends approval of the plan with
the following conditions:
(1) Add a drive at the front of the site connecting
the two drives that intersect with Harvey Road.
This will provide circulation on the site instead
of forcing traffic onto Harvey Road. This drive
should be set back eight (8) feet from the property
1 i ne ;
(2) The dumpster should be relocated so that it will
not conflict with parking;
(3) If the rear employee parking area is retained, islands
should be raised curb, not painted;
(4) The radius of the curb cuts should not intrude onto
adjacent properties;
(5) Drainage headwalls must be by standards set by the
Texas Highway Department.