HomeMy WebLinkAboutMiscellaneous
\ -.) .
DATE SUBHITTED:
P & Z CAS E NO. XI - '2 OJ '
PROJECT NA..ME: ::'))' i v..:;
: l~ "~",,..:. f', ',.<' ,L"
APPLICANT:
ENGINEER:
If "'" 1 ,
t ,!,'p, 7' ~"'\'i r~~
I
r -:\ . ~ ~
'" -~:;--,J, "l . (-~ l"'~ ~ "'"
1. Plat Received - Copy in P & Z Case File
./ 2. Application and Fee received.
P & Z ACTION
Stipulations:
3. Heeting with staff to determine problems & geometry (PRC)
4. Copy in holding drawer/engineering
Approved V
~ ,'"
Date /q/ ('
I
Disapproved
COUNCIL ACTION
Stipulations:
Approved -l..L-
Disapproved
Date2/20/' 1/
;) (I
/;/i
I~a
;l/Y
--1JiJ
/
~.
,/
/
/
-__.7
,//
~.
/'
PARKLA..~D DEDICATION (Rl, RIA, R2) (R-4 thrufR-6~ review at time of
request -or uUlldlng permLt)
Taxes Current
Construction Plans
Letter of Guarantee
Corrections per P & Z and Council
Signatures Checked
City Engineer signature
FILING PROCEDURE
Make one paper copy
Paper copy and original to courthouse
File original and leave at co~rthouse; have paper copy
stamped with file number and date.
Keep paper copy on file until original is returned from courthouse.
Place plat on City Map.
File original in plat drawer ~nd RETAIN paper copy.