HomeMy WebLinkAbout7-11 SW at Wellborn 03 SPECIFICATION FOR CONCRETE PARKING AREAS .. 1. SCOPE OF WORK 5. FINISHING , . . 5.1 AFTER CONC~ETE HAS BEEN STRUCK OFF AND CON- SOLIDATED, A BULLFLOAT MAY BE USED TO REMOVE ANY HIGH OR LOW SPOTS. BULLFLOAT USE SHALL BE CONFINED TO A MINIMUM. A FINAL SKID-RESISTANT FINISH SHALL BE MADE WITH A BURLAP DRAG OR BROOM. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, FORMWORK, EQUIPMENT, AND SERVICES REQUIRED TO COMPLETE ALL THE CONCRETE PARKING AREA WORK SHOWN THE DRAWINGS AND SPECIFIED HEREIN, INCLUDING SIDHJALKS, CONCRETE PAVEMENTS, RAMPS, AND CURBS. 2. MATERIALS 6. CURING 2.1 UNLESS NOTED OTHERWISE, ALL MATERIALS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: 6.1 CONCRETE SHALL BE CURED BY PROTECTING IT FROM LOSS OF MOISTURE, RAPID TEMPERATURE CHANGE, AND MECH- ANICAL INJURY FOR AT LEAST THREE DAYS AFTER PLACEMENT. AFTER ALL FREE WATER HAS DISAPPEARED FROM THE SURFACE. A LIQUID MEMBRANE-FORMING COMPOUND OR OTHER APPROVED CURING MATERIAL SHALL BE UNIFORMLY SPRAYED ON ALL EX- POSED SURFACES. RATE OF APPLICATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SCALE: 1"= 1'-0" I 1/4 t1A'" F'II..-L- JoiH'1';;' 1Iov'e-rz 1/81 1...J1V'e: @ ~ ~ ,,' , ~,. ,,' .'" v "A" =J\ " : tJ: ' , ' lJ' =~ 6' -' ~ ' " S b " , . . t. ' " ~ " 1 ~ " 1>,. t:. ,; , ..; CONSTRUCTION JOINTS 2.1.1. CEMENT A. CEMENT SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATION FOR PORTLAND CEMENT, AMERICAN SOCIETY FOR TESTING AND MATERIALS, (ASTM) C1S0, OR STANDARD SPECIFICATION FOR BLENDED HYDRAULIC CEMENTS, ASTM C595. CEMENT SHALL CORRESPOND TO THAT CEMENT ON WHICH THE SELECTION OF CONCRETE PROPORTIONS WAS BASED. io SAWED JOINT 1;4'1 MA ~ ---IF 1/4-11 r-1,A.~ KAI?IU? "I fR\=;r-: A . ~. i.' '4" = ~. ',-~' ~. '\:::.J l'~ "'A .t:r0:(:r ~ ';,'6. ""A',,: 6.2 i.JHEN CONCRETE IS BEING PLACED IN COLD WEATHER AND THE TEMPERATURE MAY DROP BELOW 3soF., STRAW, HAY, INSULATED CURING BLANKETS, OR OTHER SUITABLE MATERIAL SHALL BE PROVIDED ALONG THE LINE OF WORK TO PREVENT FREEZING OF CONCRETE. CONCRETE INJURED BY FROST ACTION SHALL BE REMOVED AND REPLACED AT THE CON- TRACTOR'S EXPENSE. B. . HAND FORMED JOI NT PK'.e:=t""OL.i/e-c:' r 1/411 .vi I:;:;IL-l..r:::e FLLJ7rl--f1- IIA"', = _1~~I1',~~hU~,7~::',,1 ~d, 6, ,;" " ~--t @ T~4 '4'- A. ~ ,', ~ C; , " :L:,.A \ ~.,':" - PI :. '" -:' 1 PREMOLDED FILLER JOINT . 2.1.2. CONCRETE AGGREGATES SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATIONS FOR CONCRETE AGGREGATES, ASTM C33. MAXIMUM COARSE AGGREGATE SIZE SHALL BE NOT MORE THAN ONE-FOURTH THE SLAB THICKNESS. 7. JOINTS 2.1.3. ALL MIXING WATER SHALL BE CLEAN AND FREE FROM DELETERIOUS AMOUNTS OF ACIDS, ALKALIES, OR ORGANIC MATERIALS. 7.1 JOINTING SHALL CONFORM TO THE ATTACHED JOINTING PLAN - SOUTHLAND FIELD REP TO BE NOTIFIED PRIOR TO ANY CHANGES. 2.1.4. EXPANSION-JOINT MATERIAL WHERE REQUIRED SHALL BE ~-IN.-THICK ASPHALT-IMPREGNATED PREMOLDED FIBER CONFORMING TO THE LATEST REVISED STANDARD SPECIFICA- TION FOR PERFORMED EXPANSION JOINT FILLER FOR CONCRETE, ASTM D1752. 2.1.5. CURING COMPOUND SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICATIONS FOR LIQUID MEMBRANE- I FORMING COMPOUNDS FOR CURING CONCRETE, ASTM C309. VERIFY TYPE OF COMPOUND WITH SOUTHLAND REPRESENTATIVE PRIOR TO COMMENCEMENT OF WORK. 7.2 CONTROL JOINTS OR CONTRACTION JOINTS SHALL BE FORMED BY ONE OF THE FOLLOWING METHODS: SAi.JING, FORM- ING BY HAND, FORMING BY PREMOLDED FILLER, OR USING FULL DEPTH CONSTRUCTION JOINTS. JOINT DEPTH SHALL BE A MINIMUM OF ONE-FOURTH THE SLAB THICKNESS. HAND- FORMED JOINTS SHALL HAVE A MAXIMUM EDGE RADIUS OF ~ IN. SAWING OF JOINTS SHALL BEGIN AS SOON AS THE CONCRETE HAS HARDENED SUFFICIENTLY TO PERMIT SAWING WITHOUT EXCESSIVE RAVELING. ALL JOINTS SHALL BE COMPLETED BEFORE UNCONTROLLED SHRINKAGE CRACKING OCCURS. JOINTS SHALL BE CONTINUOUS ACROSS THE SLAB, UNLESS INTERRUPTED BY FULL DEPTH PREMOLDED JOINT FILLER. JOINTS SHALL EXTEND COMPLETELY THROUGH THE CURB. JOINT OPENINGS WIDER THAN ~ IN. SHALL BE CLEANED AND SEALED BEFORE OPENING PARKING AREA TO TRAFFIC. PROJECTING/ ABUTTING SURFACES CONTROL JOI NTS sc: 1'-1'-0" _ c..cl'-h--lZol. JCIr4n ~Ai.-Ji?1 HAr-1D-r:......_: :....:01 crz. p'(.Z'eMOLV'eo FIl.-I..-F-:i<. 1"i2AHc:;,v'f::.fZ~e ?OH-rrzcL JOI ti,..-: 5>A..weVI HAHI:?-F'o!<'rleV'1 cr<: Pr2er10L..V'e C? r='1 L-L-ee, 1j~1I!~\ e":,-7AM'S> or! JDlrl'f' f"11..-L.e::e .6 ,I, ;. .-<J;' -4, 0- , '..6 @~f ",,' , ~- ' 2.1.6. AIR-ENTRAINING ADMIXTURES FOR CONCRETE SHALL CONFORM TO THE LATEST REVISED STANDARD SPECIFICA- TIONS FOR AIR-ENTRAINING ADMIXTURES FOR CONCRETE, ASTM C260. I( II C" '2 -1 CE) ~ :~1~ei,~~~.;~: ~~~t~~%;,~<J: e:;:,(PANc;;>IC"H JOIH"I FIL-LE::.I<:: 2.1.7. ALL OTHER MATERIALS USED IN THE CONCRETE SHALL CONFORM TO CURRENT APPLICABLE ASTM SPECIFICATIONS. 7.3 ISOLATION JOINTS (EXPANSION JOINTS) SHALL BE USED TO ISOLATE FIXED OBJECTS ABUTTING OR WITHIN THE PAVED AREA. THEY SHALL CONTAIN PREMOLDED JOINT FILLER FOR THE FULL DEPTH OF THE SLAB. .. 2.2 UNLESS NOTED OTHERWISE, ALL CONCRETE SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: 2.2.1. ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI. CONCRETE SHALL BE MANUFACTURED AND DELIVERED IN ACCORDANCE WITH THE LATEST REVISED STANDARD SPECIFICATION FOR READY MIXED CONCRETE, ASTM C94. .. 7.6 LAY OUT JOINTS TO FORM SQUARE PANELS. WHEN THIS IS NOT PRACTICAL, RECTANGULAR PANELS CAN BE USED IF THE LONG DIMENSION IS NO MORE THAN 1~ TIMES THE SHORT, E.G. 8x12 FT. JOINT CROSS SECTIONS 7.4 WHEN APPROVED, THE CONTRACTOR SHALL BE PER- MITTED TO Mi\KE MINOR ADJUSTMENTS IN JOINT LOCATION TO MAKE THEM COINCIDE WITH DRAINAGE OR OTHER STRUCTURES. NEW / EXISTING PAVEMENT 7.5 JOINT SPACING IN FEET SHOULD NOT EXCEED 15 FT. ISOLATION JOINTS . 2.2.2. MINIMUM CEMENT CONTENT SCALE: 1"= 1'-0" CONCRETE SHALL BE PRODUCED WITH A MINIMUH CEMENT CONTENT OF 560 LB. PER CUBIC YARD AND AN ENT~\INED AIR CONTENT OF 6% PLUS OR MINUS 1~% BY VOLUNE. -AHARILLO, LUBBOCK, RUIDOSO, ALMAGORDO. 2.2.3. IN AREAS WHERE FREEZE-THAi.J DURABILITY IS NOT ESSENTIAL, CONCRETE SHALL BE PRODUCED WITH A MINIHUM CEMENT CONTENT OF 520 LB. PER CUBIC YARD. ALL OTHER LONE STAR DIVISION CITIES. , . 7.7 JOINTS SHOULD RUN CONTINUOUSLY AND EXTEND THROUGH INTEG&\L CURBS. JOINTS CAN BE TERMINATED AND OFFSET AT ISOLATION JOINTS. 7.8 ADJUST JOINTING LAYOUT FOR THE LOCATION OF MAN- HOLES, CATCH BASINS, S~~LL FOUNDATIONS. AND OTHER BUILT-IN STRUCTURES SO THAT THE JOINTS WILL LINE UP WITH THE CORNERS OF THE STRUCTURES. 2.2.4. TANK PAD AREA SHALL BE 5" REINFORCED CONCRETE iHTH 113 REBAR 16" O.C. ALL STEEL TO BE SET ON 1~" PLASTIC HIGH CHAIRS. 7.9 OFFSET CONTROL JOINTS TO AVOID ACUTE ANGLES OR Sl-1ALL PIECES OF SLAB AT CURVES. OFFSETS SHOULD BE AT LEAST 13z FT. " 7.10 \.JHEN SAWING CONTROL JOINTS, BEGIN AS SOON AS POSSIBLE WITHOUT RAVELING THE NEW-CONCRETE. . 8. OPENING TO TRAFFIC 8.1 THE PAVEMENT SHALL BE CLOSED TO PASSENGER CAR TRAFFIC FOR AT LEAST THREE FULL DAYS OR UNTIL SUCH TIME THAT THE MINIMUM COMPRESSIVE STRENGTH OF THE CONCRETE IS AT LEAST 75% OF ITS DESIGN STRENGTH. T&\FFIC SHALL BE RESTRICTED TO PASSENGER CARS AND LIGHT TRUCKS FOR AT LEAST SEVEN DAYS AFTER CONCRETE IS PLACED. IN ALL CASES APPROVAL SHALL BE OBTAINED PRIOR TO OPENING OF THE PAVEMENT TO TRAFFIC. rl c... rA., - e: "7 PC'I Ni--=:....-' ,C....-r A r.2.-r1 rl HOlE: ? A H c./ ~ A L I_ e.- C" ~ C. 'Z c::.. N He H )" ~-j ::J HN ""H P::7 E:- ? c F' 1~e: Z~, e:.. --r /^' 1 L <S; He--;:::: -I. . (() --+--' 9. Sfu~PLING AND TESTING 9.1 IF 4SPECIFIED BY SOUTHLAND THE CONTRACTOR SHALL FURNISH FOR TEST AND ANALYSIS REPRESENTATIVE SAMPLES OF THE MATERIALS TO BE USED IN THE WORK. ALSO IF SPECIFIED BY SOUTHLAND, THE CONTRACTOR SHALL PROVIDE CERTIFICATION THAT MATERIAL FURNISHED IS IN ACCORDANCE iHTH THESE SPECIFICATIONS. SAMPLING AND 3ESTING SHALL BE IN ACCORDANCE WITH THE LATEST REVISIONS OF THE AMERICAN ASSOCIATION OF STATE HIGH- WAY AND TRANSPORTATION OFFICIALS (AASHTO) OR THE fu~ERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) , STANDARDS PROCEDURES FOR Sfu~PLING AND TESTING THE MATERIALS BEING USED IN THE PROJECT. 10. GUA~\NTEE 10.1 THE CONTRACTOR SHALL GUARANTEE IN WRITING THE SATISFACTORY PERFORMANCE OF THE COMPLETED PAVEMENT FOR A PERIOD OF 2 (n.JO) YEARS. .. ~~~~R I . )- lU -1 .-l ( -r.. -=:l H oi't:: AV'JLJ&7-r -reAN"?verz.::;,c::- JOIN-( ~F'.A~.I N~ ~ J.:::::w-j 1'" ....J 1 L..I.- r:=-.... L-L 0 rl <:::. E:. rl1" e- FC' 1..-1 H e;. or==: ~OUHv ~7""'IHy<? AHD A-r ~R B>el"we:-eH <:::.clZrie:lZ4? or::- i2'~c..-rAl-k1JJL"""i<." c::::.~-rltk....::... ,...-t2.~.,v'~I2c:;,e Jo ""'1"1 @ ;" MANHOLE CASTI NG A...JAY F"'~r-1 L.C'~'1I"n.JC'1 HAl... I '1'2 E::.,LPAH'?lorl JCIH""- ~1L-1_e:1C: CD CATCH BASI N OASTI NG L-Or-j~ 1'1 J C'I r1AL.. Jc I H-r . ENERGY CODE CERTIFlaATION ACCEPTABLE PRACTICE METHOD I II ~I ' 1'2 E;';" P.... n,,? I OH JOINl" rlL.L.erz. ~ Address of Building Permit AopllcatioTl S i Apts, Hotels. Hotel. 3 story or less - .. u 0- .. ~ - ..... e u'" c .JI:!? !~)(. u Commercial Buildings 5000 Sq. Ft. or les.. or ) stories or less Lot Block Subdivl.io~ See Si,te Plan CIry of Austin Overall surface area of new, exterior. heated and insulated wall, measured in sq. ft. (include all windows & doors. Do not include 1960 unheated walls such as garages. porches, etc.) Glass area contained by walls found in Step II, mea.ured in S~. fT. (include sliding glass doors, patio door., french doors). 264 Divide gla.s area of Step #2 bv 'Jall area of Step II. Glass W~ - 13 L.o,..Jc::.r 11'U 01 Hf"o-L. JOI H'I Check glass type used 1n project. Double Pane l~.ulatlon R-Value of wall cavitv of Step II is Insulation R-Value of ce111ng is R-19 or better. (R-19 ~i i~~m). ..)01 t11' Insulation R-Value of floofs over Jnheated spaces is R-7 RIVla.o.a: 11- 8-83 - CoN:5TRuc rrrwJ JOINTS 0'" AIM;> PAD, . Date SQ. FT. SQ. ?T. Percent 8 The wall assembly I is W-22 ,(See Energv Code Appendix. assembly I that most closely re.e~bles the applicant's wall). se the wall r better, (R-7 Hin1mu~) 27 Percent I H -re:c:::::., f2AL c.. uK' e;> 9 The allowable gla.s percentage of the wall as.embly I of Ste~ .~ i. (See table on wall assembly page found in Step 18). riG -re : J01 rl"T"<? .::..r.zeA1'~v L..or-l~ I-(JV' I r-1ALl...Y BY "lrie:: ~t?'-1eC;;. Or::- P'AV'IH t:1 L-,e...He::c::;. O~ ~Arl?VeK'SeL..""" A'- rrlt:= erlV' ~~ "......,..~ j..Joe~ 0 ~~ 14" r-1A)(, r ~AI? Ue? / @=r""'6~~ ','(;9~,c>'4 U\ b _ - .. " ',' .." tJ . ' , ," ~,b ' Q. 4' , l>.r I ~ '.' ' .. . 11211~~\ Ke'l"'~^"f" ~~r1e:-f\ ~.,.... F"....,~r-11 Nc; Ke"'( ""-0 -=-Or<r-1 MANHOLE CASTING Al" ";Ut-ic::--rIOri of L-oric::.,I-rUI7IHA.L A"'P 'f'17,4..H<?velO2c:.;e:. JCIN1' T I@ ~/~ 1/'2 f-;:)(.~AH-;'IOr1 JOIH-r PI LL-e::r< "'((Z AH."v'c:.2?e::. JOIH'f___ 10 If the percentage found tn Ste? nJ is less than or equal to the ~ercentage found tn Step 09, the building envelope will comply with Section 1~-5104 of tbe Austin Amendment. to the Uniform Building Code, 1979 Edition. Buik211'\q InspechOt'! Dept .6/82 lO'6 S lC....\1 URE ~ EXPANSION JOI NT PLANS FOR NON-TELESCOPING , CASTI NGS SC: NONE '7 G W ( ~ ( ,3 '" / TYP\CAL e:-il &..711 H L1 A p~AI_-r I? -"' ~-J I: ... :II ... - ... I I- .- W w a::: .- (j) Jon..; T 5 6AS 15UfNDSj ON 01-:: PumP STREET o I 1 .c' /.' t". . -- <8 - - -/""-N v0c..A-PE C? - @ l LuRe \t: !?' - - ,1' - D. - ILl 11 - U\ --( I? u I ~~~ - Lv r ----...... \ ~ 1- W ~ / -r - -@ I '-'\r YPIc:..,A. -<( - L," -1 - ~ I - I I I . -J\ @ I , Ie 1'1 -- < J-r;:? 1 ~ e=c.. 1 c- r===- - v r<AI'1A ~e: -----r- - ?lv::'::::~A..LK_ - I I -@ - -U'I - p.., F' P --1 , , MI-/ '";/ --- e:: :<' "II r ---;r- PA,? 1--- ,- - I - -@ - re - k6J - -@ B C5- ,A Nvc;;C-A?E:v ') CUKE> -- - I --",- I _I I 1 I Ii?I 0 (' ~ 101 II.-;::? I,?I 10 1r::;,1 IS> I @ \ ) - ~ 1 1 ;7 10 10 -J\I . .1 . . - . . I . . ... . - .; - . .. I . -I I ... , . . . . . I--- -r-A~~ . 0 l - - . . . . , M ;?'::-J / . I , .... v . -- - "~ . . "'- -, ---4 G I CE)- . . . f- 'tr' ~-^"'----,~'""--- ~- t ... . - '- - -- - . . ~-~- . . - . . - --- CONS Tit' uc, 7/011I . - I' - . . i -, ~ _...~ -\"pi BoTti slues n;:::- . . . - - - -+ A..vo AT M/{) ,SeCTI . . . - I ?Af). - ~ . . . . . , . I -..- -- cEJ - 1St ~ -G - -@ ~ / V. , @ - - - \..P C:;l.Ja~ -.... CuKe I ~---- I "- ~- I /~~ LA~ V'c c.. ,A.. V e:. 10 L A Ii v C;.> c.. A.. f' e. ;:::' ;7 A P e6AC. H ~ I .::::> c;", C'" ' PA V IN G LAYOUT S c.: I" = 20' JOB NO. LoeA T ION o o f'J '" t- z o ::) rnen I ",1ft >.... -- a:.... o t- e a: o a. a: Z ~ o 0 a: u - e aI D. - 0> I&.,Z- alrn oeO rne ... "')( Z%II !'" o t- e aI t- - ::) t- ::) - ~oal .z >aI - '" 0 t- O",z NaI %0 CD::) et-~._e "\