HomeMy WebLinkAboutApplication
APPLICATION FOR REVIEW AND APPROVAL
Master Prelimina~Plat
Preliminary Plat
,/ Final Plat
~~* NOTICE: Submission of this application is 110t complete until platting flees
are paid and all requirements of Ordinance No. 690, Subdivision
Regulations, have been met. Application process must be completed
at least ten (10) days before a regul,arly scheduled Planning and
Zoning Commission meeting.
Please answer all questions fully.
Please print or type.
1. Name of subdivision 50 ' J T'l-\ Ut..' Q 0 ~ \J' ft1 .... ~ E- '/
~z.~
.
2. Subdivider
SD t-' -r \-l LU t'.J 0 0
\J ~LLLY.
The above is (check one):
~ Owner
Agent
3. Licensed surveyor, 'or engineer
Name
Q ~\J \ l\
~ ~'1D
Address 2. (0 ~ S~11T.t1 wo 0 t:>
oR..
c s.
Phone No. IIOf3. !'~"'6
4. Specific location of proposed subdivision ~ EST ~~
5 tU, \J '2-'
5. Requested "variances to Ordinance No. 690:
......, 0 u l!.
./
6. The undersigned hereby requests approval by the City of College Station of the
above identified plat:
SifJlature ~~~ S~~
Title -&~
Date lb 12-/80
~O...IIO
~G,l,
'1~.~
~7;, (, l.,.
~-~.,
~
~/
~
Subdivision: Southwood Valley 22A
Date Submitted: 10-2-80
10-16-80 P&Z
Engineer:
David Mayo for
Southwood Valley, Inc.
1. Plat Received
2. Application Fee Received
3. Filed in holding drawer/file
4. Meeting held with staff to determine problems & geometry
P&Z Action
Chairman's Signature
Secretary's Signature
Countil Action
Mayor's Signature
City Secretary's Signature
'c...,...
...~..."?L>-
Parkland Dedication (Rl, RIA, Duplex)
Taxes Current
Construction Plans
Letter of Guarantee
Corrections as per P&Z or Council
~~ \.
Signatures Checked~ f fTc~H NE:L05 1D S/(1 JJ ti Q. /tYl ftf f)
City Engineer signature
Make 1 paper copy
Take paper copy and original to Courthouse.
File original and leave, get paper copy stamped with File
number & date.
File paper copy until original returned from courthouse.
Place plat on City Map.
File original plat drawer and trash paper copy.