Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 It4I:IMRIC7_1kiIbig 1k41 March 3. 2003 TO: Grant Barnby, Via fax 764-6975 FROM: Bridgette George, Assistant Development Manager SUBJECT: DP -SIGNS NOW— Development Permit Staff reviewed the above -mentioned construction documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review, approval and issuance of the development permit: Clarification on the Drainage Report One (1) Erosion Control Plan If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details. If you have any questions or need additional information, please call Carol Cotter at 764-3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693-2554 Case file # ( 03-00100011) Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: DP -SIGNS NOW -DEVELOPMENT PERMIT( 03-00100011) ENGINEERING 1. It does not appear from the Site Plan that energy dissipation will be included. Exit velocities were not provided in the Drainage Report, so I am assuming that they do not exceed maximum allowed per the City's Drainage Policy and Design Standards. Please verify. 2. A Roof Gutter Splash Block is shown on the Site Plan. What impact does this have on Drainage Area 5? 3. Please submit an Erosion Control Plan. Reviewed by: Carol Cotter Date: March 3, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review comments Page 2 of 4