DEVELOPMENT PERMIT
PERMIT NO, 03-20
Project: CRESCENT POINTE
FORAREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
LOTS 1, 2, 3, 4
CRESCENT POINTE
DATE OF ISSUE: 5101103
OWNER:
TAC REALTY
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS.
SITE ADDRESS:
3$00 UNIVERSITY DR
DRAINAGE BASIN:
Cartser Creek
VAUD FOR B MONTHS
CONTRACTOR:
YOUNG CONTRACTORS
Clearing Grading Permit
e
Ali construction must be in oompgance with the approved construction plans " a'7 (g - &r g. SC' r
AN trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded Y411 not
count towards landscaping paints. Barricades must be T per caliper inch of the tree diameter.
NO TREES SHOWN AS PROTECTED. PLEASE ENSURE TCEQ TPDES PHASE II STORMWAMR
REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the Immediate
construction site in accordarim with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it Is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements_ The Owner endfor Contractor shall assure that all disturbed areas are sadden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erasion
control. The Owner and/or Contractor shalt also insure that any disturbed vegetation be rMumed to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
a4acont properties, city streets or infrastructure due to heavy machinery and/or equipment its well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
betore any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the•City of CoOegc Station, measures shall be
taken to insane that debris from construction, erosion, and sedimentation shall not be deposited in city sheets4
or existing drainage facTities.
1 hereby grant this permit for development of an area outside the special flood hazard area. All development
shag be in accordance with the plans and specifications submitted to and approved by the City Engineer in tho
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
Date
3
Date
7(}Irn Z�41J YJC ILrJWJITJn�(I' C'lm
Re CGhMC Cic CT :CT PWA717GICd
C
DEVELOPMENT PERMIT
PERMIT NO. 03-20
Project: CRESCENT POINTE
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
LOTS 1, 2, 3, 4
CRESCENT POINTE
DATE OF ISSUE: 5101/03
OWNER:
TAC REALTY
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
3300 UNIVERSITY DR
DRAINAGE BASIN:
Carter's Creek
VALID FOR 9 MONTHS
CONTRACTOR:
YOUNG CONTRACTORS
Clearing Grading Permit
All construction must be in compliance with the approved construction plans ')') (.# _ L a % r
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
NO TREES SHOWN AS PROTECTED. PLEASE ENSURE TCEQ TPDES PHASE II STORMWATER
REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
5 r fl
Date
Date
I�GS� Sl5h er .J�e` urn_
DEVELOPMENT PERMIT
PERMIT NO. 03-20
Project: CRESCENT POINTE
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
LOTS 1, 2, 3, 4
CRESCENT POINTE
DATE OF ISSUE: 5/01/03
OWNER:
TAC REALTY
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
3300 UNIVERSITY DR
DRAINAGE BASIN:
Carter's Creek
VALID FOR 9 MONTHS
CONTRACTOR:
YOUNG CONTRACTORS
Clearing Grading Permit
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
NO TREES SHOWN AS PROTECTED. PLEASE ENSURE TCEQ TPDES PHASE II STORMWATER
REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
5 1 r
Date
Date
SPL-GIAL UUNUI I IUNti!
All construction must be in compliance with the approved construction plans "}") (' _ L a.'i' r
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be V per caliper inch of the tree diameter.
NO TREES SHOWN AS PROTECTED. PLEASE ENSURE TCEQ TPDES PHASE 11 STORMWATER
REQUIREMENTS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be retumed to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
betore any operations of this permit can begin.
In accordance with Chapter IS of the Code of Ordinances of the, City of Collcgc Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in tho
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
Date
Date
(eA5 t5�� � [Z
W03
allVGNb1S
3QOW
AO
i-inS36
Z0
(S)39tid
£7:00:00
NOIivdna
88Z99LL6
3WdN/'ON XVd
£T:9T T0/90
3WI1`31dQ
£LOT4EMMIH : #'2i3S
0L9£b9L6L6 : _131
964£t9L6L6 : Xt7d
J3S 1N3WdO13AM S000 : 3WVN
bT:9T £00Z/10/90 : 3WI1
1JOd3J NOIiVOIdIJ3R NOISSIWSNViJl