HomeMy WebLinkAboutDrainage ReportT: D4 a.vn
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
February 27, 2003
Mr. Spencer Thompson
Engineering Department
City of College Station
College Station, TX
Subject: Updated Drainage Report
University Heights Condominiums
College Station, TX
Dear Spencer:
Pleased find enclosed the referenced report for your review. This report is an update of
the original report submitted on November 22, 1999.
Sincerely,
GALINDO ENGINEERS AND PLANNERS, INC.
J ��
Christian A. Galindo, P.E., R.P.L.S.
President
cc: Horizon Homes
0 F tj
�'�' l t.
HRISTIAN A. GAL I
UNIVERSITY HEIGHTS CONDOMINIUMS
DRAINAGE REPORT
1. TRACT DESCRIPTION
The University Heights Condominiums project covers a 1.3978-acre tract located on the northwest
corner of Welch and Nevada Streets.
A separate 24"x36" sheet, Site Plan 8: Drainage Plan, is part of this report and will be referred here
as Exhibit 1.
The adopted Flood Insurance Study does not identify the existence of a 100-flood plain affecting this
tract (Map # 48041 C 0143 C, July 2, 1992).
2. STORMWATER RUNOFF
All of the runoff from the 1.3978 acres flows in a general southeast direction, as sheet flow, onto
Nevada Street. The current site is currently vacant. Exhibit 1 shows the tract, its location and its
topography. Topographic data was obtained from city of College Station records. The tract has
been defined as one drainage section.
Exhibit 2 shows the runoff calculations for 5, 10, 25, 50 and 100-year rainfalls for each of the two
sections. Runoff detention computations have been made using the 100-year return period and
therefore the maximum allowed runoff after development is 6.51 cfs. In order to mitigate the
effect of the increase runoff, a location for a detention facility was defined on the project parking
lot.
3. INFLOW HYDROGRAPHS
Haestad Methods Quick Tr-55 V. 5.47 was used for the analysis given in Exhibit 3 (in six pages). This
Exhibit graphically shows individual hydrographs for all storm frequencies. The estimated required
storage for the 100-yr storm is calculated at 0.096 ac-ft.
4. DETENTION FACILITY
The pond will be built on the project's parking lot. The weir will consist of a 3.0' long curb cut on
the south end of the parking lot. The curb at this location will be 0.8' (9.5" curb) high. The flow
elevation is set at 312.8' and the curb elevation is set at 313.6'. This weir will empty onto a 4'-wide
concrete flume with an upper flow elevation of 312.8'. This flow will in turn discharge onto Nevada
Street at the approximate gutter elevation of 311.5'.
Exhibit 4 shows the storage volume calculations based on the proposed grading of the parking tot.
5-03
Page 2
The available storage is calculated at 0.12 ac-ft. Exhibit 5 estimates that the available storage at a
maximum allowed peak outflow of 6.51 cfs the storage required will be about 0.1 ac-ft. Thus the
available storage is sufficient to pond the excess runoff.
Haestad Methods Pondpack V. 5.21 was used in the ponding calculations. Exhibit 6 (in two pages)
shows the input data for the proposed Vertical -Rectangular weir (curb cut). Exhibit 7 (in five pages)
shows the routing calculations for a multiple storm. Peak outflows for each frequency do not
exceed pre -development conditions.
The following is the routing summary in terms of maximum outflow allowed (pre -development
conditions) and peak attained:
Storm
Max. Allowed
Peak Attained
Max. 2levation
5-year
4.30
4.31
313.42
10-year
4.83
4.67
313.45
25-year
5.51
5.15
313.50
50-year
6.23
5.66
313.54
100-year
6.51
5.85
313.56
Exhibits 8 and 9 of the original report remain unchanged.
The above referenced Exhibit 1 shows the location of the pond and depicts the construction details
necessary for implementation of this project.
5. CERTIFICATION
This report and design conform to the City of College Station Drainage Policy and Design Standards.
�4 6
CHRISTIAN A. GALINDO, P.E. # 53425, R.P.L.S. # 4473
February 27, 2003
Page 3
11
m 11
r
N
N
II
11
II
� II
11
N II
N
N
O
<
T 11
tG
N
N
O 11
p 11
Q 11
11
'- 11
N 11
y
d T 11
1 0
b
N 11
y II
N II
II
r
�
,
a II
11
I M
W
M
m
I fp
I N
f0
w
O
1
> 11
II
i
1
N 11
II
i 0
O
; O
O
11
� II
C'1
th
!D
b
U II
II
at
11
II
i
L
3 ii
N
ii
,
O 11
T II
Ip
)O
p II
11
II
-
O II
O II
II
�
11 11
II
i
11
11
T II
O II
�
II
11
II
II
11
II
y 11
11
i
f0
W
II
N II
�
OI
i
�
II
11
w
II
O
O
11
11
ZcL
X
w
N it
H II
I
Ol
A
0 o
Z
~
II
II
r
Q Q
z
6 11
R L)
O
11
II
^
N
y 1-
F
11
II
m
n
0 �
~
N
11
N II
O
O
F
11
II
g =
w
ii
II
i
v iit
;
0
o
0
o
J
II
O
II
II
U w
>
n
D
~
it
i
1
O
z
ii
U 11
j
D
�
11
II
II
11
L
11
11
'
�
11
II
q
G
11
� 11
;
O
i
O
II
11
II
ry
J
11
11
it
II
11
n o
O
II
n
N 11
o
O
i
0
O
n >
n
n
n
,
u
n
n
t
o
t
o
II
n
y II
�
OJ
p)
I
CO
p)
11
II
it
Q 11
11
it
I
r-
it
II
II
it
it
11
�
6
Q
11
�
11
Y
'Op
a
11
U
IIy
N �
N
EXHIBIT 2
EXHIBIT 3
Quick TR-55 Ver.5.47 SIN:
Executed: 14:47:35 02-26-2003
*
*
* MODIFIED RATIONAL METHOD
* ---- Grand Summary For All Storm Frequencies ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
UNIVERSITY HEIGHTS CONDOMINIUMS
............................................................................
Area =
1.40 acres
To = 10.00
minutes
............................................................................
VOLUMES
Frequency
Adjusted
Duration
Intens.
Qpeak
Allowable
I Inflow
Storage
(years)
----------------------------------------------
'C'
minutes
in/hr
cfs
cfs
I (ac-ft)
(ac-ft)
5
0.800
13
6.903
7.72
4.30
---------
0.138
0.063
10
0.800
13
7.770
8.69
4.83
0.156
0.071
25
0.800
13
8.885
9.94
5.51
0.178
0.081
50
0.800
13
10.056
11.25
6.23
0.201
0.092
100
0.800
13
10.495
11.74
6.51
0.210
0.096
Quick TR-55 Ver.5.47 SIN:
Executed: 14:47:35 02-26-2003
F
L
0
W
c
f
s
MODIFIED RATIONAL METHOD
---- Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
UNIVERSITY HEIGHTS CONDOMINIUMS
* RETURN FREQUENCY: 5 yr I Allowable Outflow: 4.30 cfs
* 'C' Adjustment: 1.000 1 Required Storage: 0.063 ac-ft
*--------------------------------------------------------------------*
* Peak Inflow: 7.72cfs Inflow .HYD stored: 5IN .HYD
Td = 13 minutes I
Approx. Duration for Max. Storage ------/
I
I
Tc= 10.00 minutes 1
I = 7.693 in/hr
Q = 8.60 cfs
.I. I
- Required Storage I
-- 0.063 ac-ft I
I I I
x x x x x x xIx x x x x x x x x x x
I
Return Freq: 5 yr
C adj.factor: 1.00
Area (ac): 1.40
Weighted C: 0.80
Adjusted C: 0.80
Td= 13 minutes
I = 6.903 in/hr
Q = 7.72 cfs
x x
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q= 4.30 cfs
x o I• Ix (Allow.Outflow)
0 1
x o 1 NOT TO SCALE I x
o--------- I
0 1 x
----------------------- 1----------------------------- I------------
15.00 minutes 17.43 minutes
Quick TR-55 Ver.5.47 SIN:
Executed: 14:47:35 02-26-2003
F
L
O
W
c
f
s
MODIFIED RATIONAL METHOD
---- Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
UNIVERSITY HEIGHTS CONDOMINIUMS
* RETURN FREQUENCY: 10 yr I Allowable Outflow: 4.83 cfs
* 'C' Adjustment: 1.000 Required Storage: 0.071 ac-ft
*--------------------------------------------------------------------*
* Peak Inflow: 8.69 cfs Inflow .HYD stored: LOIN HYD
Td = 13 minutes I Return Freq: 10 yr
/------- Approx. Duration for Max. Storage ------/ C adj.factor: 1.00
I
I
To= 10.00 minutes
I = 8.635 in/hr
Q = 9.66 cfs
•I• I
• I
Required Storage I
.-- 0.071 ac-ft I
I I I
x x x x x x xIx x x x x x x x x x x
I
x
0 0 0 0 0 0
x o
0
x 0
0
I •
------------------I----------
15.00 minutes
Area (ac): 1.40
Weighted C: 0.80
Adjusted C: 0.80
Td= 13 minutes
I = 7.770 in/hr
Q = 8.69 cfs
x
0 0 0 0 0 0 0 0 0 o Q= 4.83 cfs
Ix (Allow.Outflow)
I
NOT TO SCALE I x
x
------------------- I ------------
17.44 minutes
Quick TR-55 Ver.5.47 SIN:
Executed: 14:47:35 02-26-2003
F
L
0
W
c
f
s
MODIFIED RATIONAL METHOD
---- Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
UNIVERSITY HEIGHTS CONDOMINIUMS
* RETURN FREQUENCY: 25 yr I Allowable Outflow: 5.51 cfs
* 'C' Adjustment: 1.000 1 Required Storage: 0.081 ac-ft
*--------------------------------------------------------------------*
* Peak Inflow: 9.94 cfs Inflow .HYD stored: 25IN .HYD
Td = 13 minutes
/------- Approx. Duration for Max. Storage
10.00 minutes
9.861 in/hr
11.03 cfs
Required Storage
I Return Freq: 25 yr
-/ C adj.factor: 1.00
I
--
0.081
ac-ft f
I
x x x
I
I
x x x xIx x
I
x x x x
I
x x x x x
Area (ac): 1.40
Weighted C: 0.80
Adjusted C: 0.80
Td= 13 minutes
I = 8.885 in/hr
Q = 9.94 cfs
x x
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q= 5.51 cfs
x 0 Ix (Allow.Outflow)
0 1
x 0 NOT TO SCALE I x
o ___________= I
1 0 1 x
------------------------ I ----------------------------- I ------------
15.00 minutes 17.45 minutes
Quick TR-55 Ver.5.47 SIN:
Executed: 14:47:35 02-26-2003
F
L
0
W
c
f
s
MODIFIED RATIONAL METHOD
---- Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at To hydrograph recession leg.
UNIVERSITY HEIGHTS CONDOMINIUMS
* RETURN FREQUENCY: 50 yr I Allowable Outflow: 6.23 cfs
* 'C' Adjustment: 1.000 1 Required Storage: 0.092 ac-ft
*--------------------------------------------------------------------*
* Peak Inflow: 11.25 cfs Inflow .HYD stored: 50IN .HYD
Td = 13 minutes
Approx. Duration for Max. Storage ------/
I
I
To= 10.00 minutes
I = 11.148 in/hr
Q = 12.47 cfs
•I• I
• I
Required Storage
-- 0.092 ac-ft
• I I I
x x x x x x xlx x x x x x x x x x x
I
Return Freq: 50 yr
C adj.factor: 1.00
Area (ac): 1.40
Weighted C: 0.80
Adjusted C: 0.80
Td= 13 minutes
I = 10.056 in/hr
Q = 11.25 cfs
x x
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q= 6.23 cfs
x o Ix (Allow.Outflow)
0 1
x 0 NOT TO SCALE I x
o
0 x
----------------------- I ----------------------------- I ------------
15.00 minutes 17.46 minutes
Quick TR-55 Ver.5.47 SIN:
Executed: 14:47:35 02-26-2003
F
L
0
W
c
f
s
MODIFIED RATIONAL METHOD
---- Graphical Summary for Maximum Required Storage -
First peak outflow point assumed to occur at Tc hydrograph recession leg.
UNIVERSITY HEIGHTS CONDOMINIUMS
* RETURN FREQUENCY: 100 yr I Allowable Outflow: 6.51 cfs
* 'C' Adjustment: 1.000 1 Required Storage: 0.096 ac-ft
*-------------------------------------------------------------------*
* Peak Inflow: 11.74 cfs Inflow .HYD stored: 100IN HYD
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
x
o
o
Td = 13 minutes
Approx. Duration for Max. Storage ------/
I
I
Tc= 10.00 minutes
I = 11.639 in/hr
Q = 13.02 cfs I
•I• I
• I
• Required Storage
-- 0.096 ac-ft
• I I I
x x x x x x xIx x x x x x x x x x x
I
x
0
Return Freq: 100 yr
C adj.factor: 1.00
Area (ac): 1.40
Weighted C: 0.80
Adjusted C: 0.80
Td= 13 minutes
I = 10.495 in/hr
Q = 11.74 cfs
x x
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o Q= 6.51 cfs
o Ix (Allow.Outflow)
0 1
NOT TO SCALE I x
x
------------ I ----------------------------- I ------------
15.00 minutes 17.45 minutes
POND-2 Version: 5.21
SIN:
UNIVERSITY HEIGHTS CONDOMINIUMS
CALCULATED 02-26-2003 15:00:36
DISK FILE: c:\ldata\data2003\5-03\pond\5-03 .VOL
Planimeter scale: 1 inch = 1 ft.
Elevation Planimeter
(ft) (sq.in.)
----------------------
312.80 0.00
312.90 200.00
313.25 7,300.00
313.60 16,900.00
Area Al+A2+sgr(A1*A2
(acres)
--------------------------
(acres)
0.00
0.00
0.00
0.00
0.17
0.20
0.39
0.81
EXHIBIT 4
*
Volume
Volume Sum
(acre-ft)
---------------------
(acre-ft)
0.00
0.00
0.00
0.00
0.02
0.02
0.09
0.12
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Areal))
where: EL1, EL2 = Lower and upper elevations of the increment
Areal,Area2 = Areas computed for EL1, E12, respectively
Volume = Incremental volume between EL1 and EL2
POND-2 Version: 5.21 SIN:
EXHIBIT _5
»»> OUTFLOW HYDROGRAPH ESTIMATOR ««<
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\100IN .HYD
Qpeak = 11.7 cfs
Estimated Outflow: c:\ldata\data2003\5-03\pond\ESTIMATE.EST
Qpeak = 6.5 cfs
Approximate Storage Volume
(computed from t= 0.00 to 0.29 hrs)
0.1 acre-ft
Outlet Structure File: 5-03 .SIR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
UNIVERSITY HEIGHTS CONDOMINIUMS
***** COMPOSITE OUTFLOW SUMMARY ****
Elevation (ft) Q (cfs) Contributing Structures
312.80 0.0 1
313.00 0.8 1
313.20 2.3 1
313.40 4.1 1
313.60 6.3 1
Outlet Structure File: 5-03 .SIR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
UNIVERSITY HEIGHTS CONDOMINIUMS
Outlet Structure File: c:\ldata\data2003\5-03\pond\5-03 .STR
Planimeter Input File: c:\ldata\data2003\5-03\pond\5-03 .VOL
Rating Table Output File: c:\ldata\data2003\5-03\pond\5-03 PND
Min. Elev.(ft) = 312.8 Max. Elev.(ft) = 313.6 Incr.(ft) _ .2
Additional elevations (ft) to be included in table:
SYSTEM CONNECTIVITY
Structure No. Q Table Q Table
WEIR-VR 1 -> 1
Outflow rating table summary was stored in file:
c:\ldata\data2003\5-03\pond\5-03 .PND
Outlet Structure File: 5-03 .STR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
*******************************
UNIVERSITY HEIGHTS CONDOMINIUMS
*******************************
»»» Structure No. 1 «««
(Input Data)
WEIR-VR
Weir - Vertical Rectangular
El elev.(ft)? 312.8
E2 elev.(ft)? 313.601
Weir coefficient? 3.087
Weir elev.(ft)? 312.8
Length (ft)? 3.00
Contracted/Suppressed (C/S)? C
Outlet Structure File: 5-03 .SIR
POND-2 Version: 5.21 SIN:
Date Executed: Time Executed:
*******************************
UNIVERSITY HEIGHTS CONDOMINIUMS
Outflow Rating Table for Structure #1
WEIR-VR Weir - Vertical Rectangular
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Computation Messages
--------------------- ------------------------
312.80 0.0 H =0.0
313.00 0.8 H =.2
313.20 2.3 H =.4
313.40 4.1 H =.6
313.60 6.3 H =.8
C = 3.087 L (ft) = 3
H (ft) = Table elev. - Invert elev. ( 312.8 ft )
Q (cfs) = C * (L-.2H) * (H**1.5) -- Contracted Weir
POND-2 Version: 5.21 SIN: Page 1
EXECUTED: 02-26-2003 15:03:19 STORM # 1 Return Freq: 5 years
* *
* UNIVERSITY HEIGHTS CONDOMINIUMS
* *
* *
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: c:\ldata\data2003\5-03\pond\5-03 .PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\5IN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\5 OUT HYD
Starting Pond W.S. Elevation = 312.80 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 7.72 cfs
Peak Outflow = 4.31 cfs
Peak Elevation = 313.42 ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 0.06 ac-ft
---------------
Total Storage in Pond = 0.06 ac-ft
STORM # 1 Return Freq: 5 years
Pond File: c:\ldata\data2003\5-03\pond\5-03 PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\5IN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\5 OUT HYD
EXECUTED: 02-26-2003
Peak Inflow = 7.72 cfs 15:03:19
Peak Outflow = 4.31 cfs
Peak Elevation = 313.42 ft
POND-2 Version: 5.21 SIN: Page 2
EXECUTED: 02-26-2003 15:03:19 STORM # 2 Return Freq: 10 years
* *
* UNIVERSITY HEIGHTS CONDOMINIUMS
* *
* *
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: c:\ldata\data2003\5-03\pond\5-03 .PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\LOIN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\10 OUT HYD
Starting Pond W.S. Elevation = 312.80 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 8.69 cfs
Peak Outflow = 4.67 cfs
Peak Elevation = 313.45 ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 0.07 ac-ft
---------------
Total Storage in Pond = 0.07 ac-ft
STORM # 2 Return Freq: 10 years
Pond File: c:\ldata\data2003\5-03\pond\5-03 PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\10IN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\10 OUT .HYD
EXECUTED: 02-26-2003
Peak Inflow = 8.69 cfs 15:03:19
Peak Outflow = 4.67 cfs
Peak Elevation = 313.45 ft
POND-2 Version: 5.21 SIN: Page 3
EXECUTED: 02-26-2003 15:03:19 STORM # 3 Return Freq: 25 years
*************************************
*
* UNIVERSITY HEIGHTS CONDOMINIUMS
* *
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: c:\ldata\data2003\5-03\pond\5-03 .PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\25IN .HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\25 OUT HYD
Starting Pond W.S. Elevation = 312.80 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 9.94 cfs
Peak Outflow = 5.15 cfs
Peak Elevation = 313.50 ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 0.08 ac-ft
--------------
Total Storage in Pond = 0.08 ac-ft
STORM # 3 Return Freq: 25 years
Pond File: c:\ldata\data2003\5-03\pond\5-03 PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\25IN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\25 OUT HYD
EXECUTED: 02-26-2003
Peak Inflow = 9.94 cfs 15:03:19
Peak Outflow = 5.15 cfs
Peak Elevation = 313.50 ft
POND-2 Version: 5.21 SIN: Page 4
EXECUTED: 02-26-2003 15:03:19 STORM # 4 Return Freq: 50 years
* UNIVERSITY HEIGHTS CONDOMINIUMS
* *
* *
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: c:\ldata\data2003\5-03\pond\5-03 .PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\50IN .HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\50 OUT .HYD
Starting Pond W.S. Elevation = 312.80 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 11.25 cfs
Peak Outflow = 5.66 cfs
Peak Elevation = 313.54 ft
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 0.10 ac-ft
---------------
Total Storage in Pond = 0.10 ac-ft
STORM # 4 Return Freq: 50 years
Pond File: c:\ldata\data2003\5-03\pond\5-03 PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\50IN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\50 OUT HYD
EXECUTED: 02-26-2003
Peak Inflow = 11.25 cfs 15:03:19
Peak Outflow = 5.66 cfs
Peak Elevation = 313.54 ft
POND-2 Version: 5.21 SIN: Page 5
EXECUTED: 02-26-2003 15:03:19 STORM # 5 Return Freq: 100 years
* *
* UNIVERSITY HEIGHTS CONDOMINIUMS
* *
* *
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File: c:\ldata\data2003\5-03\pond\5-03 .PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\100IN HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\100 OUT .HYD
Starting Pond W.S. Elevation = 312.80 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow = 11.74 cfs
Peak Outflow = 5.85 cfs
Peak Elevation = 313.56 £t
***** Summary of Approximate Peak Storage *****
Initial Storage = 0.00 ac-ft
Peak Storage From Storm = 0.11 ac-ft
---------------
Total Storage in Pond = 0.11 ac-ft
STORM # 5 Return Freq: 100 years
Pond File: c:\ldata\data2003\5-03\pond\5-03 .PND
Inflow Hydrograph: c:\ldata\data2003\5-03\pond\100IN .HYD
Outflow Hydrograph: c:\ldata\data2003\5-03\pond\100 OUT .HYD
EXECUTED: 02-26-2003
Peak Inflow = 11.74 cfs 15:03:19
Peak Outflow = 5.85 cfs
Peak Elevation = 313.56 ft