Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
pPA-t6-RF. MEIN RR-tq rpl TNT1h FN(_TNFFAC q7q RGF.RRF.R p q'J GrALINDO ENGINEERS AND PLANNERS, INC 3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868 Job: 5-03 UNIVERSITY HEIGHTS CONDOS Date: 03/11/03 1.4-ACR, TRACT WELCH AVE. & NEVADA ST. COLLEGE STATION, BRAZOS COUNTY, TX ENGINEER'S CONSTRUCTION ESTIMATE PUBLIC INFRASTRUCTURE ITEM --- - ••.......•_ -- - - - ----------------- SPEC # DESCRIPTION UNIT QUANT, - -- -- -........... - - - PRICE _.. ._-- TOTAL WATER 1 -"----------_--- .-.'------- ---------- -.--_.-------- ---- -- 4" PVC C900, CL200 (4' bury) If 690 14.00 9,660 2 4" - 45 Degree Bend ea. 1 100.00 100 3 4" - 22.5 Degree Bend ea. 2 100,00 200 4 4"-11.25 Degree Bend ea. 2 100.00 200 5 6"X6"X4" Tapping Sleeve & Valve ea. 1 1000.00 1,000 6 3/4" Short Single Service ea. 2 130.00 260 7 1 112" Short Double Service ea. 10 160,00 1,600 8 2" Blow Off Valve ea. 1 150,00 150 9 Contingency % 3 13,170.00 395 10 Construction Layout & As -built Drawings % 3 13,170.00 395 Subtotal $$ 13,900 SIDEWALK ALONG WELSH STREET 11 N-Wide Sidewalk s.f. 1.700 4.00 6,800 12 Handicap Ramps ea. 5 200.00 1,000 13 Construction Layout & As -built Drawings % 3 7,800.00 234 14 Construction Layout & As -built Drawings % 3 7,800-00 234 Subtotal $ -- 8,034 DRAINAGE 15 Concrete Flume s-f, 110 8.00 880 16 Contingency % 3 880.00 26 17 Construction Layout & As -built Drawings % 3 880.00 26 Subtotal $ 933 Total Estimated Construction Cost - - - -- $ - -- 22927 ist n A. Galindo, P.E. a 53425 11-Mar-03 -IRISYIAN A. GALIND _....,..53425..... ...1 - wE r;,