HomeMy WebLinkAboutDevelopment PermitDEVELOPMENT PERMIT
PERMIT NO. 03-24
Project: UNIVERSITY HEIGHTS CONDOS
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
1.3978 ACRES
VOL. 124 PG 553
CBL A-7
DATE OF ISSUE: 4/22/03
OWNER:
CHARLES SZABUNEWICZ
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
WELSH AT NEVADA
DRAINAGE BASIN:
Bee Creek Trib. "B"
VALID FOR 9 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
PLEASE NOTE, PHASE II TCEQ REGULATIONS IN EFFECT. PLEASE ENSURE COMPLIANCE
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
y -D
A!� strator/R r I
tive Date- f
STtd b 3
Owner/Agent/Contractor Date
DEVELOPMENT PERMIT
PERMIT NO. 03-24
Project: UNIVESITY HEIGHTS CONDOS
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
UNIVESITY HEIGHTS CONDOS 1200 WELSH
DRAINAGE BASIN:
Bee Creek Trib. "B"
DATE OF ISSUE: 4/10/03 VALID FOR 9 MONTHS
OWNER: CONTRACTOR:
CHARLES SZABUNIEWICZ
3801 5TH ST
BRYAN, TX 77801
TYPE OF DEVELOPMENT: Clearing Grading Permit mn�y
SPECIAL CONDITIONS: [
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
NOTE: INSURE COMPLIANCE WITH NEW TCEQ PHASE 11 STORMWATER REGULATIONS.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
y•—istr rl.�
cl l �o l o3
Date `
Owner/Agent/Contractor Date
DEVELOPMENT PERMIT
PERMIT NO. 03-24
Project: UNIVERSITY HEIGHTS CONDOS
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
1.3978 ACRES
VOL. 124 PG 553
CBL A-7
DATE OF ISSUE: 4/22/03
OWNER:
CHARLES SZABUNEWICZ
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
WELSH AT NEVADA
DRAINAGE BASIN:
Bee Creek Trib. "B"
VALID FOR 9 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
PLEASE NOTE, PHASE II TCEQ REGULATIONS IN EFFECT. PLEASE ENSURE COMPLIANCE
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
Ad i inistrator/R pr sentative
Owner/Agent/Contractor
Date