Loading...
HomeMy WebLinkAboutCost EstimateJanuary 27, 2010 Ms. Carol Cotter City of College Station Water Services Department 1101 Texas Avenue College Station, TX 77842 Re: Engineering Cost Estimate Proposed College Station ISD Transportation Center Rock Prairie and William D. Fitch College Station, Texas Gessner Engineering Job No.: 09-0317 Dear Ms. Cotter: Based on current estimations for direct material and direct labor costs, the prime cost of the public infrastructure for the above referenced project is estimated to be $204,782. Values used to determine this estimate are included in the attached table. This estimate does not include indirect costs due to overhead or indirect manufacturing expenses. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING, LLP F-7451 I y 1. 0 :M�� Melissa P. Thomas, P.E. II0-d Morgan S. Lund, E.I.T. Attached: Estimated Cost Table �PZtiQFlF,t��!! Gessner ........................... :e MELISSA.P. THOMAS.� Engineering 1732 I'ksvy Su4[ 105 College Swtion,Tcsas 77840 CO. B4 . 10763, 77342-0763 979.680.S340- FA\ 979.680,8811 2204 S. Chappell Hill So. I3cnham,7esas 778.33 979,836.6855 FAX 979.836-6847 Probable Estimate of Sitework Construction Costs CSISD Transportation Center Gessner Engineering, LLP GE Job #: 09-0317 WATER Item Quantity Units Unit Cost Total 12" PVC 1250 LF $ 60 $ 75,000 8" PVC 315 LF $ 40 $ 12,600 18x18x12 Tee Cut to Existing 1 EA $ 6,160 $ 6,160 Fittings 1.5 TON $ 4,310 $ 6,465 18" Gate Valve 2 EA $ 2,756 $ 5,513 12" Gate Valve 4 EA $ 1,838 $ 7,350 8" Gate Valve 4 EA $ 1,225 $ 4,900 6" Gate Valve 1 EA $ 919 $ 919 4" Gate Valve 2 EA $ 459 $ 919 3" Meter 2 EA $ 110 $ 220 Fire Hydrant Assembl 3 EA 3 3,149 $ 9,447 Pressure Testing and Disenfecting 1 EA $ 5,500 $ 5,500 Trench Safety 1,565 LF $ 2 $ 3,130 Sub Total -Water $ 138,122 SANITARY SEWER , Item QuantityUnits Unit Cost Total Boring under William D. Fitch 1 LF $ 50,000 $ 50,000 16"x318" Steel Casing 85 LF $ 100 $ 8,500 8" PVC 204 LF $ 40 $ 8,160 Sub Total - Sanitary Sewer $ 66,660 Total Construction Cost $ 204,782 Gessner Engineering