HomeMy WebLinkAboutDevelopment Permit��� DEVELOPMENT PERMIT
PERMIT NO. 09-64A
CITY OF COUEGE STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
PlanmV&D—lop—tSmicm RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
A000901 Thomas Carruthers
Tract 8.1
44 acres
DATE OF ISSUE:
OWNER:
December 17, 2009
CSISD c/o John Hall
1812 Welsh Avenue, Suite 120
College Station, Texas 77840
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
William D Fitch and RockPrairie Road
DRAINAGE BASIN:
Lick Creek
VALID FOR 24 MONTHS
CONTRACTOR:
Clearing and Grading Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
'*TCEQ Phase II Rules In Effect"Driveway Location on Rock Prairie Contingent on TIA Approval".
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
It-/7'0r
Date
Date
���` DEVELOPMENT PERMIT
'/ PERMIT NO. 09-64B
CITY OFCOUECESMION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
11., q,tn..,m,p. w.n RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
SITE ADDRESS:
A000901 Thomas Carruthers
William D Fltch and Rock Prairie Road
Tract 8.1, 44 Acres
DRAINAGE BASIN:
CSISD Transportation Center
Lick Creek
DATE OF ISSUE: 01/15/10
VALID FOR 24 MONTHS
OWNER:
CONTRACTOR:
CSISD c/o John Hall
1812 Welsh Avenue, Suite 120
College Station, Texas 77840
TYPE OF DEVELOPMENT:
Full Development Permit
CONDITIONS:
1. No work of any kind may start until a Development Permit is issued.
2. No work beyond limits covered in permit is authorized.
3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
4. Development shall not be used or occupied until Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NO]) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
10. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
12. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
13. Special Conditions:
1 01 , the Contractor, hereby agree to comply with all conditions herein.
1AL70XV
ontractor t,11
^'' �/ .I fe
I hereby grant this permit for development. Contact^� %IA XI 4<, 1q 1—W I I , the Public Works
In sp rassign o is project24 hours prior to beginning construction for scheduling required Inspections.
azw
DI•lSlo
City Engineer/Representative Date