Loading...
HomeMy WebLinkAboutDevelopment Permit��� DEVELOPMENT PERMIT PERMIT NO. 09-64A CITY OF COUEGE STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA PlanmV&D—lop—tSmicm RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: A000901 Thomas Carruthers Tract 8.1 44 acres DATE OF ISSUE: OWNER: December 17, 2009 CSISD c/o John Hall 1812 Welsh Avenue, Suite 120 College Station, Texas 77840 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: William D Fitch and RockPrairie Road DRAINAGE BASIN: Lick Creek VALID FOR 24 MONTHS CONTRACTOR: Clearing and Grading Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. '*TCEQ Phase II Rules In Effect"Driveway Location on Rock Prairie Contingent on TIA Approval". The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. It-/7'0r Date Date ���` DEVELOPMENT PERMIT '/ PERMIT NO. 09-64B CITY OFCOUECESMION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA 11., q,tn..,m,p. w.n RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: A000901 Thomas Carruthers William D Fltch and Rock Prairie Road Tract 8.1, 44 Acres DRAINAGE BASIN: CSISD Transportation Center Lick Creek DATE OF ISSUE: 01/15/10 VALID FOR 24 MONTHS OWNER: CONTRACTOR: CSISD c/o John Hall 1812 Welsh Avenue, Suite 120 College Station, Texas 77840 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work of any kind may start until a Development Permit is issued. 2. No work beyond limits covered in permit is authorized. 3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. 7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NO]) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 10. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy. 11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 12. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 13. Special Conditions: 1 01 , the Contractor, hereby agree to comply with all conditions herein. 1AL70XV ontractor t,11 ^'' �/ .I fe I hereby grant this permit for development. Contact^� %IA XI 4<, 1q 1—W I I , the Public Works In sp rassign o is project24 hours prior to beginning construction for scheduling required Inspections. azw DI•lSlo City Engineer/Representative Date