HomeMy WebLinkAboutApplication (09-64)re
CITY OF COLLEGE STATION
Home of Tex&AdM U j,,e V-
,CHK
'kNr
SITE PLAN APPLICATION
GENERAL
FOR OFFI� lJ$E ONLY
CASE NO.: t `'fN,-��1r�� �'..:�: r=' I
DATE SUBMITTED.
yy
TIME:
STAFF:
MINIMUM SUBMITTAL REQUIREMENTS:
❑X $668 Site Plan Application Fee.
❑ $250 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the
balance is due prior to the issuance of any plans or development permit).
❑X Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
❑X Fourteen (14) folded copies of site plan.
❑ One (1) folded copy of the landscape plan.
❑ One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate
Building Review (if applicable).
❑ Building elevations for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
❑ Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively.
❑ Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
❑ Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
❑X The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
-- - - - - • • • •. vvi,.. lu,1 ul oiuiniwa[er management conterence September 2, 2009
NAME OF PROJECT College Station ISD Transportation Center
ADDRESS William D. Fitch & Rock Prairie Road
LEGAL DESCRIPTION (Lot, Block, Subdivision) A000901 Thomas Carruthers Tract 8.17 Vol 8413 Pq 291
APPLICANTIPROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Gessner Engineering E-mail mlund@gessnerengineering.com
Street Address 2501 Ashford Drive, Suite 102
City College Station State Texas
Phone Number 979-680-8840
PROPERTY OWNER'S INFORMATION:
Name College Station Independent School District
Street Address 1812 Welsh Avenue, Suite 120
City College Station
Phone Number 979-694-5610
10/09
Zip Code 77840
Fax Number 979-680-8841
E-mail %hall@csisd.org
State Texas
Fax Number
Zip Code 77840
Page 1 of 9
ENGINEERING CERTIFICATIONS (required for development in Special Flood Hazard Areas):
A. I, Thomas E Gessner
certify that any nonresidential structure on or proposed to be on
this site as part of this application is designated to prevent damage to the structure or its contents as a result of
flooding from the 100
-year storm.
Engineer
B. I, Thomas E Gessner
_ Ia 1 to j01
Date
ify that the finishd floor elevation of
including any basement, of any residential structure,rtproposed as part of his application sche lowest floor
at or above the base
flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and map, as
amen ed.
`� , to �41
Engineer Date
C. I, Thomas E. Gessner
certify that the alterations or development covered by this permit
shall not diminish the flood -carrying capacity of the waterway adjoining or crossing this permitted site and that such
alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13
concerning encroachments of floodways and of floodway fringes. %
V lo/tic/1
--—
Engineer Date '
D. I, Thomas E. Gessner
certify that the proposed alterations do not raise the level of the
100-year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
v� 2X i r—
Engineer
Conditions or comments as part of approval:
106(' �2
Date
10/09
Page 3 of 9