HomeMy WebLinkAboutDrainage AddendumJanuary 11, 2010
Ms. Jennifer Prochazka
City of College Station Planning Services
1101 Texas Avenue
College Station, TX 77842
Re: Storm Water Drainage Study - Addendum
College Station ISD Transportation Center
College Station, Texas
Gessner Engineering Job No.: 09-0317
Dear Ms. Prochazka:
This letter serves as an addendum to the drainage report that conveys the results of the
storm water drainage study conducted by Gessner Engineering for the proposed College
Station ISD Transportation Center in College Station, Texas.
Based on the results of the Traffic Impact Analysis, the City of College Station requested
that the drive onto Rock Prairie Road be moved south of the originally proposed location.
This move shifted the drainage areas as shown in the attached revised Proposed Drainage
Area Map (sheet C4.1). However, the amount of impervious area did not increase
significantly and will not have an impact on the results of the previously submitted Storm
Water Drainage Study Report.
Sincerely,
GESSNER ENGINEERING
��'TE'�*1,
'��
�G[v�
ME
SSA ... THOMAS
Melissa P. Thomas, P.E.
�j o.
98398 :.
x4lydli �
Morgan S. Lund, P.E.
IRS
11111111112
0
6
EE
I
m
w
HIM
3
p:
$
5g
gggqq
55LL
a
's
J�.
�?�3-�xix>
e
r
:a 8
q.p ,
k$
7 v
m M
0.
y Qm
O K
z
Z
—
DZL
".
m ti ?�a CO 6n
Ln
�ONJ
� 3> w
p
a
m A� tt
F
is <1
j g 'c m
mCO,STRICT
_$_
eg�A1
SOY O
z
8•
December 7, 2009
Mr. Stephen Maldonado Jr.
City of College Station Water Services Department
1101 Texas Avenue
College Station, TX 77842
Re: Fire Flow Report
Proposed College Station ISD Transportation Center
Rock Prairie and William D. Fitch
College Station, Texas
Gessner Engineering Job No.: 09-0317
Dear Mr. Maldonado:
The fire flow test information was provided by the City of College Station to
Gessner Engineering in regards to the fire hydrant located at 7804 Rock Prairie
Road, and the fire hydrant located at William D. Fitch Parkway. The fire flow
information is as follows:
7804 Rock Prairie
William D, Fitch
Static Pressure
110 psi
116 psi
Residual Pressure
110 psi
112 psi
Flow
1635 gpm
1680 gpm
According to the International Fire Code, the fire flow demand at this site
is 2,500 gallons per minute with a flow duration of two (2) hours. This
demand was determined for a Type IIA building with less than 33,200
square feet of fire flow calculation area. All proposed buildings will have
sprinkler systems built in. According to an email by Ms. Carol Cotter,
College Station City Engineer, structures including sprinkler systems
allow for a 50% reduction of required fire demand. This reduces the total
fire demand to 1,250 gallons per minute for the site.
The standard formula given in AWWA M-17 (1989), shown on the next
page, was utilized for converting test flow data to distribution capacity at
the minimum 20 psi residual pressure.
0,54
Ps — Pr
P,
where, Qr = fire flow at residual pressure Pr (gpm)
Ql = hydrant discharge during test (gpm)
Pa = static pressure (psi)
Pr = desired residual pressure (psi)
Pt = residual pressure during test (psi)
CV
Gessner
Engineering
2501 Ashford Drive
Suite 102
College Station, Texas 77840
P.O. Box 10763, 77842
979.680.8840
fax 979.680.8841
2204 S. Chappell Hill Street
Brenham, Texas 77833
979.836.6855
£ax 979.836.6847
The flow available with a 20 psi residual and 1 psi assumed drop in pressure at
7804 Rock Prairie Road (planned area of connection) is calculated to be greater
than 18,000 gallons per minute from the hydrant test data provided. Therefore,
the proposed site should have adequate fire flow for both the currently planned
and future development.
Fire hydrant supply pipes were sized using the water distribution modeling
software, EPANET, developed by the EPA's Water Supply and Water Resources
Division. The modeled system head loss was computed using the Hazen -
Williams based hydraulic analysis. Please see the attached calculations from
EPANET for pipe and node details.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLP F-7451
OF TF'k1jo��
Melissa P. Thomas, P.E.
° . F. iH6mks
98
393
Kyle tZapalac, M.E., E.I.T ®BBBBOQo�FiPi?�cq��?-
ko GessnerEngineering
October 2, 2009
Mr. Stephen Maldonado Jr.
City of College Station Water Services Department
1101 Texas Avenue
College Station, TX 77842
Re: Wastewater Design Report
Proposed College Station ISD Transportation Center
Rock Prairie and William D. Fitch
College Station, Texas
Gessner Engineering Job No.: 09-0317
Dear Mr. Maldonado:
The peak wastewater flow was calculated in accordance with the fixture count
determination method. A total fixture unit count of 118 was determined for this
building. This calculation was determined based on the fixture unit load factor
given in Table I of the Sanitary Sewer Chapter of the Bryan/College Station
Unified Design Guidelines. The values are shown below in Table One.
Fixture
Number
Load
TotalFactor Value
Kitchen Sink
2
1
2
Lavatory
9
2
18
Shower Group
2
3
6
Urinals
3
4
12
Water Closets,
Valve O erated
10
8
80
Total
118
Table One: Fixture Units
The peak wastewater flow based on the fixture units is 125 gallons per
minute for less than 500 fixture units. Using the Manning equation with
an n value of 0.010, the velocity in all sections of the proposed sewer
line were calculated as shown in Table Two below.
Pipe Section
PiperSize
PipeaSlope
Pipe Velocity (ftls)
BLDG - MH1
6
2.06
5.35
MH1 - MH2
6
0.80
3.33
MH2 - MH3
6
0.80
3.33
MH3 - MH4
8
0.40
2.85
MH4 - EXIST MH
8
0.45
3.03
Table Two: Pipe Size, Slope and Velocity
C7
Gessn .r
Engineering
1712 South,,., pk„y
Suite 105
College Station, lexa 77&10
CO. B. 10763, 77842-0763
979.680.3840
FAX979.680.SS41
2204 S. Chappol Hill Sr.
Brenham, Tc. 77833
979.836.6855
FAX 979.836.6847
All pipe slopes are within the required range of minimum/maximum pipe slopes
for sanitary sewer from the Bryan/College Station Unified Design Guidelines.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLP F-7451
:5n6OFT
Melissa P. Thomas, P.E. <'
MEtISSA
e...:............
Kyl M. apa ac, M.E., E.I.T. °t. ° ' "91
0 Gessner Engineering
Page 1 12/7/2009 3:13:54 PM
* E P A N E T
` Hydraulic and Water Quality
* Analysis for Pipe Networks
* Version 2.0
Input File: 09-0317.net
Link - Node Table:
---------------------------------------
Link Start End
ID Node Node
-------------------
P1
N1
P2
N2
P3
N3
24
N4
PS
N5
P6
N6
P7
N7
28
HYD3
P9
N8
P10
N8
P11
N9
P12
N4
P13
N3
ExistingMain
Nl
Node Results:
Node
Demand
ID
GPM
--------------------------
N1
0.00
N2
0.00
N3
0.00
N4
0.00
N5
0.00
N6
0.00
N7
0.00
HYD3
1250.00
N9
0.00
N8
0.00
BLDG_FIRE
500.00
BLDG_DOM
125.00
HYD2
0.00
HYD1
0.00
ExistingMain
-1875.00
N2
N3
N4
N5
N6
N7
HYD3
N8
BLDG_FIRE
N9
BLDG DOM
HYD2
HYD1
ExistingMain
Length Diameter
ft in
134.01
12
551.14
12
171.98
12
109.30
12
305.41
12
72.53
12
119.11
8
125.12
6
35.25
6
5.32
4
42.23
4
52.00
8
136.44
8
30.66
12
----------------------------------------
Head
Pressure
Quality
----------------------------------------
ft
psi
249.81
108.24
0.00
248.72
107.77
0.00
244.25
105.83
0.00
242.85
105.23
0.00
241.96
104.84
0.00
239.48
103.77
0.00
238.89
103.51
0.00
231.92
100.49
0.00
227.99
98.79
0.00
228.04
98.81
0.00
227.48
98.57
0.00
227.62
98.63
0.00
242.85
105.23
0.00
244.25
105.83
0.00
250.00
0.00
0.00 Reservoir
Page 2
Link Results:
Link
Flow
VelocityUnit
Headloss
Status
ID
--------------------------------------------------------------
GPM
fps
ft/Kft
P1
1875.00
5.32
8.12
Open
P2
1875.00
5.32
8.12
Open
P3
1875.00
5.32
8.12
Open
P4
1875.00
5.32
8.12
Open
P5
1875.00
5.32
8.12
Open
P6
1875.00
5.32
8.12
Open
P7
1875.00
11.97
58.51
Open
P8
625.00
7.09
31.06
Open
P9
500.00
5.67
15.76
Open
P10
125.00
3.19
8.72
Open
P11
125.00
3.19
8.72
Open
P12
0.00
0.00
0.00
Open
P13
0.00
0.00
0.00
Open
ExistingMain
-1875.00
5.32
6.23
Open
Pressure
20.00
60.00
80 00
100 00
Psi
Velocity
4.00
8.00
12.00
16.00
fps
P2
HY03