HomeMy WebLinkAboutHoliday Inn Express HotelPROJECT REVIEW COMMITTEE (PRC) MEETING
September 15, 2000
TO:
FROM:
Parvis, Via Fax 764-7827
Mr. & Mrs. Ismail, Via Fax 764-7827
Clint Baker, EBCO, Via Fax 260-7825
PRC Review Subcommittee:
Joe Horlen, P&Z Commissioner
John Happ, P&Z Commissioner
Carolyn Williams, P&Z Commissioner
Staff Attending:
Bridgette George, Asst. Development Coordinator
Jessica Jimmerson, Staff Planner
Shauna Laauwe, Staff Planner
Tammy Macik, Secretary
00-1'10
SUBJECT: Holiday Inn Express Hotel -proposal to change the color of a
portion of
the
The PRC held a meeting on Wednesday, September 13, 2000 to review the above-
mentioned project. The PRC discussed the proposed color change to the front and
back portion of the building, as well as the existing sign ordinance requiring signs
to include one of the predominate colors of the building. The building is a cream
color, and the proposed sign does not include a cream color; it includes blue,
yellow, orange, and white. Although the sign has four colors and the ordinance
allows only three, the current city policy is that "white" is not a color unless the
predominate color of the building is white. The applicant proposed to add the
Sedona Clay color in order to meet the sign ordinance requirement, but stated
they would rather leave the building as it is currently. When asked about why
they did not change their sign colors, Parvis stated that the sign is a nationally
recognized sign with its logo colors and would rather change the color of the
building, than request a variance for the sign.
After further discussion regarding the proposed Sedona Clay color, the PRC
determined that painting the building with the orange color would detract from
its current attractiveness. The PRC also determined that the building was really
painted a neutral color and therefore did not have a predominate color that
should be included in the sign.
Commissioner Horlen motioned to not paint the front and back portion of the
building with the Sedona Clay color. He also reiterated that the white in the sign
is a non-color and that would make the sign have only three colors.
Commissioner Happ seconded the motion, which passed 3-0.
Date: October 23, 2000
To: Amanda Hudec, Accountin\\ .ti\
From: Bob Mosley, City Enginee~\
Subject: Completed Infrastructure from Private Development
By the attached letter of completion for the Holiday Inn Express development, we have
accepted the following improvements to the City of College Station infrastructure.
Sanitary Sewer:
Service tap
Water:
6-inch PVC main
(C900 CL 200)
Fire Hydrant, Type II
1 each
15 8 linear feet
1 each
Based upon our previous meeting, Development Services has begun providing us
engineering estimates with the private development plans. This will allow us to identify
the cost of the infrastructure in the future. We do not have the engineering estimates for
this project. This memo provides a record of the infrastructure acceptance. However, the
engineering cost estimates for this infrastructure will be required from Development
Services.
c: Natalie Ruiz, Development Coordinator
John Logan, Engineering Technician
Missy Green, Staff Assistant
LETTER OF COMPLETION
CI1Y ENGINEER
CI1Y OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
DATE: Jo/s(CD
RE: COMPLETION OF Yo J ;J 4 L( [p.,J
The purpose of our letter is to request that the following listed
improvements be approved and accepted as being constructed under city
inspection and completed according to plans and specifications as
approved and required by the City of College Station, Texas. This
approval and acceptance by the City is requested in order that we may
finalize any sub-contracts and to affirm their warranty on the work. This
approval and acceptance by the City of the improvements listed below
does hereby void the letter of guarantee for the listed improvements on
the above referenced project.
The one year warranty is
EBCo
hereby affirmed and agreed to by
and by their sub-contractors as
indicated by signatures below.
WORK COMPLETED DATE
~ tv1--1<. ~ d R.; u Q_ Le/c#I
F in. e... u 'f d /(I»/) :.;;:: 'JCKC-G--.d
;$ ev...-~ r / i llJ ~ -KCJ'je.. ?/t, J.
-. r IJ,0/,Pi
rt/ il{D
lo/ ijla~
1-;QQ_ Srr•N)<)~-... L~(IJQ__-SA-.F£
&t3~L Owner:5.AU#t /slfltfU-
Address: /2o 3 (1.,.J 1 v.i!;tste:y ..GK'.
Cof{Cg;e Sm/tc>~} 1X 7?34-Q
~ffc;,_...!.....1....L..<!.~~~¥-I..tJ'::...L.44cJCl(;z_ Contractor: E 13 CO .
Address: 305 W ~>f-C i J /; s
C Q""' .Q, v-otJ lJ\ 7 (c,S 2 L>
~.10(12/9'2 d(
NO.
1
2
3
4
5
6
7
ENGINEER'S COST ESTIMATE
HOLIDAY INN EXPRESS
PROPOSED WATER LINE IMPROVEMENTS
UNIT
DESCRIPTION QUANTITY UNIT COST
OVERSIZE PARTICIPATION REQUEST
Mobilization, Staking & Traffic Control 1 LS $1,500.00
6" PVC Water Line (C900, Class 200) w/Cement 146 LF $35.00 Stabilized Sand Embedment
6" D.l.P. Water Line (Class 52) 5 LF $20.00
12" X 6" (MJ) Tapping Valve & Sleeve 1 EA $1 ,200.00
Mechanical Joint Fittings, Glands, Bolts & Concrete 1 LS $1,000.00 Thrust Blocking
Erosion Control Silt Fencing 50 LF $10.00
Trench Saftey, Sheeting & Shoring 1 LS $500.00
ESTIMATED CONSTRUCTION COST =
(10%) CONTINGENCIES=
ESTIMATED TOTAL COST=
This engineer's estimate was prepared in our office
,at the date shown , and is released for the purpose of
public infrastructure cost projections.
-"--~__..___8 ~_BM ___ fl _~_02-#f!J
North B. Bardell, Jr., P.E. 60873 ~ Date
MU ICIPAL
255 1 TEXAS AVENUE SOUTH, STE. A
COLLEGE STATION, TEXAS 77840
Ph (409)693-5359 FAX (409)693-4243
E-mail: mdgcs@gte.net
000292-E.01 -75(3274)
/
TOTAL
COST
$1 ,500.00
$5,110.00
$100.00
$1,200.00
$1 ,000.00
$500.00
$500.00
$9,910.00
$991.00 -----
$10,901.00
Memo
Date: 9/12/00
To: Project Review Committee
From: Shauna A Laauwe, Staff Planner ?V
RE: Building colors for Holiday Inn Express Hotel & Suites
Item: Holiday Inn Express, located at 1203 E. University Drive, is within the C-B
Business Commercial Corridor Overlay District. Section 8.19, which details
additional requirements for sites located in the overlay district, gives the Project
Review Committee (P.R.C.) authority over building aesthetics.
Paragraph D states: "Building colors shall be harmonious with the existing man-
made or natural environment, and only compatible accent colors shall be used. All
colors shall be approved by the Project Review Committee."
Item Background: This item is before you due to the applicant having difficulty in
meeting the overlay district's sign requirements. Paragraph E states that "Signs shall
include no more than three colors and two lettering styles. At least one of the colors
must match the predominant colors of the building." Holiday Inn Express proposes a
freestanding sign with the colors of blue, orange, yellow and white. Staff and PRC's
policy in the past has been to consider white as a color only if it is being used to
meet the criteria of a predominant color. The existing predominant color of the
building has been determined to be off-white/cream. Instead of incorporating one of
these colors into the sign or removing either the blue, orange or yellow, the applicant
is proposing to add the sedona clay color to the face and to the rear of the building.
Decision Points: Is sedona clay, the proposed color,
1. Harmonious with the existing man-made or natural environment and compatible
with the accent colors of the building;
2. A matching color to the proposed freestanding signage?
9/12/00
' -
10" SW. PIPE
SEC MOD 25
12 CTR.
4" 5Tl.Jl3 PIPE IN
TOP SIGN
FOUNOA110N
2' X 10'8 W11'H W. OF
CONCRETE UNDER NORMAL
SOIL CONDITION5
.;.m.;:11.., "' r n rv~ \A..l"\VVll"'f\7
F~-PANFORMEV & EM80$EV lEXAN WI
RJU. Bl.EEC) RETAINERS
SHOOTING STAR -3M SCOfa-mNT
YELLOW TO PMS fl
HI SCRIPT --3630-15 YELJ.OW
EX & HS -WHITE
REAVER ---Fl.lif WHrrE lEXAN WTTH ~.
8WE !3ACKGROIJNO Q-fAN<
CLEAR LETTERS WI 1-112"
FRAME--1-112" X 14 GA SQUARE 1V8E 80X TR
CABINET -.D6.3 SHEET ALUM.. PTO HINNEX 8L
LJGHT7NG--HO FWORESCENT LAMPS WITH flAJ 8ROMO 8LJ.JE NEON WITH 1--9000.
IN OPEN CHANNELS PTO. HINN BU. RECESSEIJ LJGH11NG FIXTURE IN 8ii
FOUNIJA110N-PIER TYPE 2' X 10'6" WITH 1 n
IN5TALLA110N--2r CMH. WI POLE COVER PTO.
GRIP GARD INN 169 WITH 5T1Pi ATOMJZAT10N ANO 6-PSI POT .
,
,_
I
11
·(o ~ 6 1-\A\JAJA
flOM -: fAe.v1 L--
I
_ _i____ --11
1
11
---
011-U?tL f?fJt,T> ot /fl& l3LJ)C, ·
f t7M/J!N5 11-tt? 1£x!J(!A/?J u U Jd.-5''
)\\~ &owP-
flloJJ I r 6A~'f!-
0F TltE--pU\LJ)(/..?~
o ;.JL-<f
I I
II
11
I·
I 11.
I I ---