HomeMy WebLinkAboutCapstone FM 2818f •
Venessa Garza
From:
Sent:
To:
Cc:
H...'nry Mayo, RPLS <hmayo@base linesurveyors.net>
Friday, March 15, 2019 12:09 PM
Venessa Garza
James Batenhorst
Subject: Land Acquisition for Greenway Property
Attachments: Ritchey to CoCS 100.64ac survey exhi bit plats.pdf; Ritchey to CoCS 100.64ac survey
description.pdf; Spring Creek Substation staked boundary 2004.pdf; Spring Creek
Substation staked boundary and road.pdf; CoCS-Greenway-Easement1 Sa_signed.pdf;
JOl-CoCS_CC_basemap2007.pdf; 13216_014.pdf
*****This is an email from an EXTERNAL source. DO NOT click links or open attachments without positive
sender verification of purpose. Never enter USERNAME, PASSWORD or sensitive information on linked
pages from this email. * * * * *
Venessa,
I scanned the attached survey exhibit maps and signed M&B description of the 100.64 acres, from our Ritchey project
folder.
I am copying James Batenhorst on this too, since we discussed some of this the other day in regards to the Midtown
Business Park platting that we are working on.
I did not find any written correspondence in the folder as I hoped, mentioning how much and where the limits of the
greenway area would be, but I do recall the following from memory:
In 2000, we surveyed the Creagor, Windham and a few other properties for the City to purchase for a new
Business Park (Corporate Campus). This adjoined, but did not include any of the Ritchey property.
By early 2002, we worked w.th the City staff (you?) to define a greenway reserve boundary, generally along the
floodplain boundary. We staked the boundary of this within the CoCS tracts.
Around 2004, CSU instigated the idea of purchasing an electrical substation site in the south corner of the
Ritchey 300+ acre tract. We were hired to survey the 6.50 acre tract, with a stem for access from the City's
recently-purchased adjoining tracts. We also surveyed an access easement along the existing driveway in Barron
Park (now Christ UMC), so they would only need to build a short road to the substation.
Negotiations with Mr. Ritchey (by Mark McAuliffe or someone else from the City) soon evolved into the
agreement to purchase the entire floodplain area too, not just the 6.5 acre substation site. I guess this is when
"greenway" started being used on some of our maps (see image pasted below).
We then surveyed about 141 acres, using existing fences through the Ritchey tract. Soon, it was decided to cut
back the area to 100 acres, and we determined that we could simply cut across the property between some
existing property corners and have 100.64 acres. On the March 2005 survey, we show that approximately 74
acres of the 101 acres was in the lOOyr floodplain.
When the Spring Creek Sub~tation pad and road was designed (by us), we had to put the access gate at its east
corner due to topography, so the access road could not all be contained within the previously surveyed 6.5 acre
tract originally designated. .
In 2007, the City had us extend the greenway boundary along the floodplain through the 100.64 acre tract,
stopping where the floodplain intersected the old 6.5 acre boundary.
We also prepared exhibit maps for the City, to show how much land they had designated at Greenway and how
much was available for the Business Park (278 .7ac). I can't recall exactly how it was decided, but we did not
include a few acres of the land SE of the substation in the land designated for BP. (see attached 2007 exhibit
map).
1
' In 2015, CSU started constructing another aerial power transmission line from the substation to the BVSWMA
tract. Tony Michalsky called me and said that he was told they had to get a survey to designate a corridor
through the Greenway area of the CoCS property. He designed the width of 70' and I honored the 2002/2007
greenway boundary lines, but did not have a recorded document/description to cite. A "notice of utility .. on City
property" for this area was filed in vol. 13216, pg. 14 (attached).
.... :· .... : . ··· .. .....
I •· •: • •.
'.
. ~ . . ~ . . . .
. >'."· ~/~ ..... ·. ···:· ..... :".. '. -·:·~<~:::~:. . .
. . . . . .... : . . . . . . ~ . .. ..
·.: . . .··.". . ..
. .... : .. -........ ·: .... ,_:;:e~:., ·.... .:·-. ~
. .:_ .·-" ~ .. ·.. · .. : ..... ; ~ ..
-. . ~ ':.
. :. :·.···.· ;· : : \·. ·.· .. : .. : .. · .~ .. : .. , .. ·, . . ..... . .. .. .... :·· .·.~.: ... ·. . -. . ·-. :_. ·': ·... . . . . . . . . ··. ·~:r·· .. :.:. -..... ···: ::: ::.:.: . ·~ . . ... . . :·-.. ~· · .. · .. ~··· ··. . .. . . ·. :• ... '•. . : .. :"'· '\: <>
. . -'. '. "" · .:9<:1g pipelir"ie ( Mltc:h~lf~
, . . , .. :·:;. .. .... _. .. . . . · · -aoproxlmal8 l'OcCJ ion --
. . .. ... · ... : := ''·:; .... =. • ... : ::· · .•. • .. '·:'' ::: ........ : ~-.. ;:· -=,;"'.-•• ;:,:
... . · .. :. : .. . _: ..... · ... . . . .. .· .
• I : . . . . . . ·. ·. :. : . ·,, ... ;..r .. . .:
_. ::"·: .,: ... · · :.". -. "100 ... 64=· .. A.bre "T'~ac -. ·.:. · ... ·. ;·; . . : ': .. : ...
. "(.
·,. ·:~? . ·. :;:-.: .. = . ;._ .... ,,... ...
":·.:-.-:proposed Gree woy arid Electric
::: ..
Tract _'.. · .. ",;, ub-statio
.. : ..
••• •1 • .-
. · .... •.!__·,',mo
' . . ··. :·,,
. .... ·
. . :
... .• : ... · .
. ; .
.... : ·-:
~:'· ... .. ·.:•. -. ........ .
~ Stotion -
·es
'g. .3.2 1
. I
10" i..ntr £aurr1iU'll:1-._ 11 Phil • Yd . f.YJ, ptc 2 i)g I
-~11' ~11 ~CllM\eM. Cpt Diil·) .
V.!iol 2'l>7, p,,. v I t
Lot 3 1 Lo 1
Let me know if I did not provide what you needed . Also, if you have an official greenway designation document (i.e.
ordinance) for the BP, please share it with us for reference in our legal descriptions. If there is not anything more official
2
.I.
than the working drawings of the business park for the past 18 years, then I assume the City can move the greenway
boundary as needed.
Henry
Henry Mayo, RPLS I Regional Vice President
Joe Orr/ Baseline Corporation I TBPLS 10054400 I 979.693 .2777 p I 979.777.1426 c
From: Venessa Garza
Sent: Friday, March 15, 2019 9:55 AM
To: Henry Mayo, RPLS
Subject: Land Acquisition for Greenway Property
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hey Henry,
Hope you're doing well.
I'm doing some research on past purchases of greenway property.
The City purchased property from the Ritchey family and the final acreage purchased was 100.64. I have an
exhibit/boundary survey for 140.44 acres but as mentioned we only purchased 100.64 . In the real estate contract, there
is a legal description with metes and bounds dated April 27,2005 for the amount we actually purchased but not an
exhibit. Could you check to see if an exhibit was ever created with the new boundary that we purchased? No need to
create something just would like a copy of it if it exists.
I've attached the document for reference.
Thanks so much !
Venessa Garza, AICP
Senior Program Manager
Bicycle, Pedestrian & Greenways Program
Plann ing and Development Services Department
Mailing Address: P.O. BOX 9960, College Station, Texas 77842
Physical Address: 1101 Texas Avenue
Office 979-764-3674 I Fax 979-764-3496
Ctn'" ~•lfJJ .1. ·., 11 •
I 1/{rv A' IH ..,
City of College Station
Home of Texas A&M University ®
3
PRE-APPLICATION CONFERENCE
The purpose of a preapplication conference is to meet the City staff that will be
involved with your development and identify general issues that need further
analysis. Along with the discussion of these major issues, staff will talk about the
development process, distribute necessary information and discuss what permits will
be required for your particular development. This meeting is in no way a complete
review of your project. Staff will perform a formal, thorough review once the
minimum requirements are submitted for your particular development.
Date of PAC: I~ T~me:-:f..il) Submittal Deadline (Monday, 10 am):l~Ol
Main Contact: ~(\t m \ {_jJ ' fJloV{ftn Phone Number: ~ lDO . (Qtj W?
Phone Number: --------
Project Location/Legal description (includi,pg # of acres): __________ _
Ca~~ Wl · 8' ~ l2 µJ?j-ak .
Proposal (type of development -r~tail, apts, single-family, restaur~nt, etc.): __ _ ~ . dl5WSS rt1.lmlh:§ ~ CDYUphwJ stk ) \)\DJ!J
City Staff Present:
D Bridgette George D Jason Schubert D Eric Dotson
D Brittany Korthauer D Carol Cotter D Steve Smith
D Deborah Grace ~ osh Norton ,tB.Jerry Duffey ~andi Alford D Alan Gibbs D Brent Read D Nicole Menchaca D Molly Hitchcock D Sam Weido
D Jennifer Prochazka D Bob Cowell D Gilbert Martinez
D Lindsay Boyer ¢,.Lance Simms ~el don J;4tvis
:ia-crissy Hartl _ D Ken Fogle (-, () ~ , kCT\'b~ ~ .3fbr~~&et li~b1/)AA~/ CjWICP.£
Contact pplicant) on following issues: ~~~~~~~.!_J_~~~~~~~~~~~? ~~~~~~~~~~~~~~-Af lPiJJ}) ,·/Yl//5
5) ____________________________ ~
Existing Land Use I Zoning: PfJ f\ ------Proposed: ~
Platting: ------
Parkland Dedication Review / Fees: ;l'~~lZ~~~:-r1~;--1 ~--;-:-1J-:~'V-~-. 1Jr2-t~-nxeit-O>.-iJ>v ~
Access I Dnveways: -1.JJrVLRl!j, tL
NRAS: Parking-::---------------------
Landscaping: Scr~~n~uffi:e=rin~g~:J~~~~7u~d~-~,3~~~~~~~----------
Streetscaping: r Dumpster: -------------------
Lighting: Easement-~sW~\M~t L~l-=a=1'.)ta.-;-:d1-:@::--:-LudA---:--Qh~d.Mi--ct-~--.-----
Fire Lanes:
Fire Hydran~t:~~~~Yf~~~~~~~W~~~~.filJ!j
Fire Flows: ff-Ff tJc;>f>( (ij a-u_--=----. -. -.-~--;}7\Ro-~~----ft~----.: ... :----~--
Jf 2 otl Vl7f M!:r;s J1ca.-lt Oh_,
Drainage I Detention: -------------------------
Water: -------------------------------
Sanitary Sewer:---------------------------
Impact Fees: Mi&ellaneous-:~~~~~~~--~~~~~-~~~~~-~-~~~~~--~~~-
Possible Variance Requests:----------------------
Permits required for this development:
Building Permit
Development Permit
Conditional Use Permit
TxDOT Utility Permit for work in State ROW
TxDOT Driveway Permit for work in State ROW
Special Review required by:
ZBA
City Council
Planning and Zoning Commission
Information Provided:
Unified Development Ordinance
Subdivision Regulations
N orthgate Design Guidelines
Development Resource Guide
Design Review Board
Parks and Recreation Board
Guide to Building & Development
Drainage Policy & Design Standards
Specifications for Street Construction
Water & Sewer Specifications Manual
Driveway Access Location & Design Policy
CS Business Center Covenants & Restrictions
Fire Department Construction & Development Guide
CS Building Regulations (Local Amendments to the Building Code)
-----
;-
_,, ~~-\ ''-._ __ , \ \ .. "
[ '
',
\ \
\' , \
' \ .),
. ....,,,._,_)\ \
\ \
DL'N GAN
l E Q L' p~·; ·~ ll·~ I c T'
Pn:limin:iry CuncL1>l Pbn
College Srnrion
Master Piln