HomeMy WebLinkAboutLuther Eisenhower~~~/Ltn~
\~0 ~1't_at Pl~-si~~·
017~JA:lllu.: -i...cn,J d_,o c,<--e.-i---~ t {,~ ~----------
4-c 11pin-C priUJe w --..;
... /or~Ti(Jr\-? ~ l.:,1/lA...{~ ....
-S-tn..u..-~ -NX f-~3~1 -~ <;/.A { -Cl5)r(!~ JZ ( ~ ~~--. -
-I+ J-s ilv?. -
o__~r).__ -+. ~(.,. ,.,
(3 CflY' s~ w ~ ~ t fAA ct (51.--f ~
0-n~\ s~
7YJ .,
J
?~---,~ ... l -~i.+-
d~ Lw~
--1 ° LtSUk~ ex:..1~~°1 s~~c:_ --.../
At>A?
o (ZA)W lr'I ct_~ -ac 4 1 A~-crv-).
IT -•
o~s;cA» -5~d.LGJV~c? -[c;olC°'-t-~~j~·
~ 0 ·IV\~sec.;n~· -~
"Eis~~
o ()Lo~ s ~e ~<ti CT1A ? ..
Venessa Garza
From: Alan Gibbs
Sent:
To:
Thursday, November 14, 2013 10:54 AM
Danielle Singh; Venessa Garza
Subject: FW: Luther and Eisenhower Street Projects
fyi
-------------
From: Alan Gibbs
Sent: Wednesday, October 30, 2013 4:50 PM
To: Casey Rhodes
Cc: Danielle Charbonnet
Subject: RE: Luther and Eisenhower Street Projects
u0_
Casey, Q,(V
My understanding for both would be the 48 ft pvmt secB.·o with striped bikelanes and center
turnlanes, allowing 5 ft sidewalks on each side with 4+ ft greenspace offset. The multiuse path
was considered, but the concluded the above was prefer •
Thanks,
Alan
From: Casey Rhodes
Sent: Wednesday, October 30, 2013 4: 11 PM
To: Alan Gibbs
Cc: Danielle Charbonnet
Subject: Luther and Eisenhower Street Projects
Alan,
I'm am trying to firm up the SOW for both the Luther St. rehab and Eisenhower St. extension projects. The project sheets
indicate that each sheet is to be upgraded to a two-lane major collector. According to the Streets design manual there
are two cross sections for a major collector and I want to make sure I understand which cross sections is desired for each
project. Do we want to have the cross section with a turn lane or no turn lane and two travel lanes in each direction?
Also, do we want sidewalks on both sides of the street or just one side in each project? Maybe a 10' wide multi use path
on the north side of Luther?
Maybe some of these can be answered by the engineer, but I thought I would get your feedback first. Thanks .
Thank you,
Casey Rhodes, EIT
Project Manager
Public Works Department
City of College Station
300 Krenek Tap Road
College Station, TX 77840
P: (979) 764-6248
F: (979) 764-3489
crhodes@cstx.gov
City of College Station
1