HomeMy WebLinkAboutJones Butler ExtentionJC j 0 N E s & c A R T E RI N c.
ENGINEERS · PLANNERS · SURVEYORS 1716 Briarcrest Dr., Suite 160
Bryan, TX 77802-2776
ROSENBERG
SANANTONIO
THE WOODLANDS
BRYAN/COLLEGE STATION
TEL 979 731 8000
FAX 979 846 2893
AUSTIN
DALLAS
HOUSTON
BRENHAM
Texas Board of Professional Engineers Registration No. F-439
September 16, 2010
Jeff Haeber, P.E., C.F.M
Project Manager
Capital Projects Department
City of College Station
2613 Texas Avenue
College Station, TX 77842
Re: Jones-Butler Road Extension
JC No. C0008-004 I City No. ST0905
Dear Mr. Haeber:
Please find the fo llowing items that require Texas A&M University's in put and determination for the
above referenced project. The responses to these questions are necessary for the des ign of this project.
1. Need final determination on proposed cross-secti on (Please see the attached options).
2. Are additional easements possible for street lighting, drainage structures and/or intersection design?
3. Confomation on the prefeffed lighting control method in the livestock crossing structure (photo-
cell, motion, or manual).
4. Any add itional livestock crossing requirements?
5. What amount of water is acceptable within the livestock crossing during pa1ticul ar storm s? Are grate
inlets on the fl oor acceptable for draining the crossing?
6. What is the required gate type and size for both sides of the livestock crossing?
7. Need TAMU Design Guidelines fo r stom1 sewer design and stom1 water management.
8. Need input for the driveway location from new Jones-Butler into Pierce Pavilion parking lot. What
size roller gate is required at this location, in conj un ction w ith the cattle guard?
9. What, if any, work is required for the existing Pierce Pavili on driveways off of George Bush?
10. Can we close Penberthy Dr to save construction costs related to traffic contro l procedures?
11 . How does TAM U want to divide th e costs for the intersection/signalization work of Jones-Butler a nd
George Bush?
I 2. Need Penberthy Rd record drawings/maps.
Smart Engineering. Smart Solutions TM www .jonescarter.com
S:\O-JOB,C0008 Coll~ge S1mion-City\C0008·UO./ Jo1111s-B111/r:r RoadtDATA\Cross-section',1010-09 Jonl!s B11tl1tr TAi\-!U imus-Trro1mil.ckK·
J ,-j 0 N Es & c A RT E RI NC.
_...., ENGINEERS• PLANNERS•SURVEYORS
Texas Board of Professional Engineers Registration No. F-439
Mr. Jeff Haeber
September 16, 2010
Page 2
13. Need utility record drawings/maps for all TAMU utilities in or around the Jones-Butler and Penberthy
intersection.
14. Need storm sewer record drawings/maps for storm sewer infrastructure around the Jones-Butler and
Penberthy intersection.
15. Need TAMU input on Jones-Butler and Penberthy intersection layout (lane designations).
16. Need existing stonn models for Whites Creek.
17. Can we designate construction laydown/yard areas adjacent to the proposed Jones-Butler Rd for
construction staging purposes? If so, what fencing and protection requirements must we meet?
18. Need input on number, location and size of driveways off Jones-Butler for access into pastures. Will
this work include concrete driveway apron and gate? If so, what type and size of gate?
19. Are there any known private or public utilities, including waterlines from the pavilion, in the pastures
that the proposed work may cross?
20. Does TAMU want new streetlights proposed along the improved portions of Penberthy Dr.?
21. Confirm that TAMU will pay for tbe electric use for the lights in the livestock crossing. Will this
require a separate TAMU electric service lead and meter or will it come from Pierce Pavilion ~xisting
electric service? How does Pierce Pavilion get electric service?
Sincerely,
~ Steve E. Duncan, P.E., LEED® AP
Vice President
Bryan/College Station Operations Manager
SED/emm
Smart Engineering. Smart Solutions™ www.jonescarter.com
S:\O-J08'C0008 College Stoliw,..Ci1y\C0008-00./ Jo11es-B111h•r Road1DATA'(.'ro.ts-sedio11120/0-09 J011t•.s Huller 1°AJ\4U items-fraumit.doc
t
I
t
I
l
l
1----------------80.0'---------------t
OPTION #1 -PROPOSED IN RFQ PLUS BIKE LANES
1----------------80.0''----------------1
1~:·-f-·:+~--+-~~! r~·o
v I v ii THRU I THOU 1-..
"'-DECORATIVE PA.YING
OPTION #2 - 4 LANES WITH 10' HIKE BIKE & 6' WALK
1----------------80.0'----------------I
1-------------00.0·-----------1
1------30.0''------1------30.0'-----1
OPTION #3 - 4 LANES WITH BIKE LANES & 6' WALK ON BOTH SIDES
i-----------.,,,._----80.o··-----------------1
13.0'--1---......,,C...------'i4.0''----------~-13.0'--
1s.o·-112.0·11. 12.o·-11s.o·
- -~ 0 0 v v I --
ON #4 -4 LANES WITH NO BIKE LANES OR WALK (B/CS UDG "MAJOR COLLECTOR")
CROSS -SECTION OPTIONS
PAGE 2 OF 2
JONES-BUTLER ROAD
EXTENSION
CITY OF COLLEGE STATION
~ I BRAZOS COUNTY' TEXAS JS<... 9i /pf/D ~E;,,;;.1.1!_E~~ ~ CltrJoOMo.STOtOS
J r J 0 N ES & CARTE R.m
..._. ENGINEERS• PL.ANNERS •SURVEYORS
Tam H()(Jrdnf Pm~ F.1tJ!irtet:n ReJ;1$rration No. F-4J9
1718ari«t.rHIDrift,Sle.180,ary.,,,Tu.7"n/. (978)i'St-a'.l00 f '-----------------------------------------~
• ' i
t
1 l
t
I J
EXISTING PENBERTHY BLVD. BETWEEN TOM CHANDLER & GEORGE BUSH
f-----------------80.0'----------------t
f------------56.0'-----------I
f------28.0'-----t-------28.0'------I
16.0'112.0'
now lHAU v v
EXISTING JONES-BUTLER ROAD BETWEEN LUTHER AND HOLLEMAN
f-----------------80.0·----------------1
,__----------56.0'-------------<
PROPOSED BY TEA CONCEPTUAL DESIGN STUDY, APRIL 2009
f-----------------80.0'----------------I
16.0'---f----------·48.0'---------+----16.0'
B/CS UDG 2-LANE "MAJOR COLLECTOR"
1-----------------;B0.0'----------------1
13
.o·-!1----15.0-·-1 -12.o·
5
:,.o· __ 12.o·-115.o·-~: 13
.o·
~ MN lHRU ~ 0 0 ~ v v ~ - -
B/CS UDG 4-LANE "MAJOR COLLECTOR"
CR OSS-SECTION OP TIONS JONES-BUTLER ROAD
EXTENSION
ror
11 0 BRAZOS COUNTY. TEXAS § q lf#.'/O SEPTEt.tBER 2010 r~ JC"'"'jKt No..~ ca1 '°" Mo. SToto~
PAGE 1 OF 2 CITY OF COLLEGE STATION
f Jf""JONES&CARTER,,,c. I ...... ENGINEERS•PLANNER$•$URVEVOIU >1 Ta01/kJ.arJ(Jj Pr<>fUSbtalEJt1:'11ttnlf.1g1$tro11MNo. F-119
1r1esn.ttnto.ivT,S1e..1eo, ~ r-~ (979)731~ ~~----------------------------------------~