HomeMy WebLinkAboutAlternate Sidewalk DesignSchultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
February 13, 2015
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Alternate Sidewalk Design— Second Street Apartments
Dear Mr. Gibbs:
The purpose of this letter is to request an alternate sidewalk pavement section for the
above referenced project. The alternate sidewalk section between street trees will bridge
the bedding mix material and consist of 5" reinforced concrete pavement, 1" sand
cushion and brick pavers.
The pavement section will provided is capable of providing support for standard
passenger vehicles parking and driving on the sidewalk.
Sincerely, itofPjE °F, rfkz
'DEVEN L.DOYEN
.... ..I ..............
Deven L. Doyen, P.E. % ' 109835
Civil Engineer X.
-'IVAL'-' I�
WWiOi'0/I 2 13 1S
FIRM # 12327
SCHULTZ ENGINEERING, LLC
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com