Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Nome of To A&M University' MEMORANDUM DATE: September 12, 2013 TO: Adam Wallace, via e-mail: adamCa2atmsurveving.com✓ FROM: Jason Schubert, AICP, Principal Planner SUBJECT: WEST PARK LOTS 9R&IOR BLK 6 (FP -MINOR) Thank you for the submittal of your FINAL PLAT -MINOR OR AMENDING application. This project will be distributed to staff next week for their review PC: Donald Keith Sewell, via e-mail: keithno agshacks.com f P&DS Project No. 13-00900192 ,Planning & Development Services P.O. BOX q)60 • 11011'EXAS AVENUE • COLLEGE STA110N •'TEXAS • 17842 CITY OF COLLEGE STATION Home of Texas A&M University' MEMORANDUM DATE: September 23, 2013 TO: Adam Wallace, via e-mail: FROM SUBJECT: Morgan Hester, Staff Planner WEST PARK LOTS 9R & 101 Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed: One (1) 24"x36" copy of the revised final plat; Parkland Dedication in the amount of $1,261 must be submitted prior to the filing of the final plat. After Staff approval, the following will be required: One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsd ig italsubm ittal (a)cstx. gov. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after Staff approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments CC: Donald Keith Sewell, via e-mail: keith(aagshacks.comv_'_*� P&DS Project No. 13-00900192 Planning 6, Development Services P.O. BOX 9960 • I I W TF„XAS AVENUE • COLLEGE STATION • TEXAS • 7 7811 TEI,. 979 e 64.3570 - FAX. 979.76i.3°496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: West Park Lots 9R &10 Block 6 (FP -Minor) (13-00900192) PLANNING 1. Please revise the title block to show that this is the Final Plat of Lots 9R and 10R, Block 6 West Park Addition Being a Minor Replat of 7' of Lot 8, Lots 9 & 10, Block 6 West Park Addition. 2. As this is a Minor Plat, please remove the Certificate of Planning & Zoning and add the Certificate of City Planner: I, , City Planner of the City of College Station, Texas, hereby certify that this Subdivision Plat conforms to the requirements of the Subdivision Regulations of the City of College Station. City Planner City of College Station 3. Please move Note 8 in the Survey Notes box. 4. Please revise the title of the original to `Original Plat'. 5. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 6. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Morgan Hester ENGINEERING COMMENTS NO. 1 Date: September 17, 2013 1. Please add a 10' public utility easement along the rear of the lots. 2. The metes and bounds description does not match the calls on the plat. Please revise. 3. Please remove the improvements from the original plat side. FYI- the sanitary sewer is located in the rear alley and the water is located in Grove Street. 4. Please change the label in the survey legend from utility easement to public utility easement. Reviewed by: Danielle Singh Date: September 23, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: wdavisCcDcstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 4. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 5. The following easements will be required: • 10' PUE along Grove Street • 5' PUE along all side exterior and side interior lot lines • 10' PUE along the back lot line, parallel to the 15' alley. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: September 17, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 20, 2013 CITY OF COLLEGE STATION Home ofTcxAdaM UxLye tyI MEMORANDUM October 24, 2013 / w 1��\A TO: Adam Wallace, via email: adam@aTmSurveying.com ✓ ` ` FROM: Morgan Hester, Staff Planner SUBJECT: WEST PARK LOTS 9R$10R BLK 6 (FP -MINOR) - Final Plat Staff has approved the above -mentioned final plat as requested. Please be aware that as a condition of the approval, all existing structures encroaching into any setbacks must be moved or removed prior to the filing of the plat. The following page is a list of items that need to be addressed: One (1) 24"x36" mylar of the revised final plat; Parkland Dedication in the amount of $1,261 must be submitted prior to the filing of the final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdig italsubmittal(@cstx.gov. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If you have any questions or need additional information, please call me at 979.764.3570. J�C cc: Donald Keith Sewell, via e-mail: keithAagshacks.com ✓ �� Case file #13-00900192 Planning drDe elapir tServices P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAR 979.764.3496 cstx.gov/devservices