Loading...
HomeMy WebLinkAboutStaff ReportCP'Y OF COLLEGE STATION PRELIMINARY PLAN for Summit Crossing Phase 2A 13-00900200 SCALE: 46 lots on 5.607 acres LOCATION: 1447 Buena Vista, generally north of Harvey Road and east of Crescent Pointe ZONING: PDD Planned Development District APPLICANT: Rabon Metcalf, RME Consulting Engineers PROJECT MANAGER: Matt Robinson, AICP, Senior Planner mrobinson@cstx.gov RECOMMENDATION: Staff recommends approval of the Preliminary Plan Planning & Zoning Commission Page 104 November 7, 2013 Planning & Zoning Commission Page 2 of 4 November 7, 2013 DEVELOPMENT HISTORY Annexation: 1980 Zoning: A-O Agricultural Open to PDD Planned Development District (2003); revision to PDD Planned Development District (2007) Site development: Phase 1 of Summit Crossing is currently developed with townhomes. COMMENTS Water: There are existing 8-inch waterlines along Lonetree Drive and Buena Vista. Domestic and fire flow demands will necessitate future water main extensions with the Final Plat. These utilities will be required to be designed and constructed in accordance with the BCS Unified Design Guidelines. Sewer: Sanitary sewer service will be provided from existing 6-inch and 8- inch mains which were extended to serve this phase with the construction of Summit Crossing Phase 1. A sewer report for the subdivision is required with the Final Plat, but preliminary analysis of the existing system has indicated that there is available capacity to serve this development. Sewer is to be provided to each lot in accordance with the BCS Unified Design Guidelines. Off -site Easements: An offsite private drainage easement will be needed for private detention and drainage infrastructure with the Final Plat. Drainage: The subject tract is located in the Hudson Creek drainage basin. Development of the subject tract will be required to meet the requirements of the BCS Unified Stormwater Design Guidelines. Detention will be required when the property is final platted. Flood Plain: No portion of the property has been designated FEMA Special Flood Hazard Area. Greenways: No greenway dedication is required or proposed. Pedestrian Connectivity: Sidewalks will be continued alongBuena Vista and Lone Tree Drive. Bicycle Connectivity: There are no planned bicycle improvements proposed with the Preliminary Plan and none called for as part of the Bicycle, Pedestrian, and Greenways Master Plan. Streets: The proposed development will continue Buena Vista and Lone Tree Drive, which connect to Harvey Road to the south. Oversize Request: None at this time. Parkland Dedication Fees: Park land dedication was previously dedicated with initial development (Summit Crossing Phase 1). Neighborhood parkland Planning & Zoning Commission Page 3 of 4 November 7. 2013