PRELIMINARY PLAN
for
Summit Crossing Phase 2A
13-00900200
SCALE: 46 lots on 5.607 acres
LOCATION: 1447 Buena Vista, generally north of Harvey Road and east of
Crescent Pointe
ZONING: PDD Planned Development District
APPLICANT: Rabon Metcalf, RME Consulting Engineers
PROJECT MANAGER: Matt Robinson, AICP, Senior Planner
mrobinson@cstx.gov
RECOMMENDATION: Staff recommends approval of the Preliminary Plan
Planning & Zoning Commission Page 104
November 7, 2013
Planning & Zoning Commission Page 2 of 4
November 7, 2013
DEVELOPMENT HISTORY
Annexation: 1980
Zoning: A-O Agricultural Open to PDD Planned Development District
(2003); revision to PDD Planned Development District (2007)
Site development: Phase 1 of Summit Crossing is currently developed with
townhomes.
COMMENTS
Water:
There are existing 8-inch waterlines along Lonetree Drive and
Buena Vista. Domestic and fire flow demands will necessitate
future water main extensions with the Final Plat. These utilities
will be required to be designed and constructed in accordance
with the BCS Unified Design Guidelines.
Sewer:
Sanitary sewer service will be provided from existing 6-inch and 8-
inch mains which were extended to serve this phase with the
construction of Summit Crossing Phase 1. A sewer report for the
subdivision is required with the Final Plat, but preliminary analysis
of the existing system has indicated that there is available
capacity to serve this development. Sewer is to be provided to
each lot in accordance with the BCS Unified Design Guidelines.
Off -site Easements:
An offsite private drainage easement will be needed for private
detention and drainage infrastructure with the Final Plat.
Drainage:
The subject tract is located in the Hudson Creek drainage basin.
Development of the subject tract will be required to meet the
requirements of the BCS Unified Stormwater Design Guidelines.
Detention will be required when the property is final platted.
Flood Plain:
No portion of the property has been designated FEMA Special
Flood Hazard Area.
Greenways:
No greenway dedication is required or proposed.
Pedestrian Connectivity:
Sidewalks will be continued alongBuena Vista and Lone Tree
Drive.
Bicycle Connectivity: There are no planned bicycle improvements proposed with the
Preliminary Plan and none called for as part of the Bicycle,
Pedestrian, and Greenways Master Plan.
Streets: The proposed development will continue Buena Vista and Lone
Tree Drive, which connect to Harvey Road to the south.
Oversize Request: None at this time.
Parkland Dedication Fees: Park land dedication was previously dedicated with initial
development (Summit Crossing Phase 1). Neighborhood parkland
Planning & Zoning Commission Page 3 of 4
November 7. 2013