HomeMy WebLinkAboutStaff Comments4 rr CITY OF COLLEGE STATION Home of Texas AdM University" MEMORANDUM DATE: October 2, 2013 TO: Rabon Metcalf, via e-mail; rabon aarmengineer.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: SUMMIT CROSSING PHASE 2A (PP) I reviewed the above -mentioned PRELIMINARY PLAN application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal. Please submit the following information by 10 a.m. on any Monday for review that week: As the owner of the property is a corporation, provide proof of authority for Jim Easterly to sign on behalf of The Summit Crossing, LLC. Please be aware that if this application is not completed before Monday, November 11, 2013, it will expire and a new application and fees will be necessary to continue the platting process. If you have any questions or need additional information, please call me at 979.764.3570. PC: The Summit Crossing, via e-mail; iimeasterlingna gmail.com P&DS Project No. 13-00900200 Planning &Development Services P.O. BOX 9960 • 1 101 I LEAS AVI V UL. • COI I I t,L; S'rA`1-It )1y • "I'P.XAS "' M2 "I"€L. 9'97/6 .3570 • FAX. 9'9.'640/i9C IF 0 a CITY OF COLI:;fii,GE STATION Home of'Te A&m University° MEMORANDUM DATE: October 7, 2013 TO: Rabon Metcalf, via e-mail; rabon(a)rmengineer.comvz FROM: Jason Schubert, AICP, Principal Planner SUBJECT: SUMMIT CROSSING PHASE 2A (PP) Thank you for the submittal of the required documents for your PRELIMINARY PLAN application. This project will be distributed to staff this week for their review. PC: The Summit Crossing, via e-mail; limeasterling(a)gmail.com, / P&DS Project No. 13-00900200 llh�� Planning & Development So -vices P.O. BOX 9960 • 1101 TEXAS AVENUE - COI LEGE. STATION • TEXAS • 77842 TEL. 979.1-64,3570 • EAX. 979.764_34% cstx.govldevservices CITY OF COLLEGE STATION Home ofTeeas A&M University MEMORANDUM 01) October 16, 2013 TO: Rabon Metcalf, via email: rabon(drmengineer.com FROM: Matt Robinson, AICP, Senior Planner SUBJECT: SUMMIT CROSSING PHASE 2A (PP) - Preliminary Plan Staff reviewed the above -mentioned Preliminary Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 21, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 7, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24" x 36" copy of the revised Preliminary Plan; and Thirteen (13) 11" x 17" copies of the revised Preliminary Plan. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. hftp:/Iwww.r-stx.gov/pz Please note that a Mylar original of the revised preliminary plan will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: The Summit Crossing, via email: jimeasterling(c)gmail.com Case file #13-00900200 Plranningri Development Services P.O. BOX 9960 - 1101 TEXAS AVENUE - COLLEGE STATION • TEXAS - 71842 TEL. 979.7 64.3570 - FAX. 979J6 i3496 cctxanv(riaucarx.#rac - STAFF REVIEW COMMENTS NO. 1 Project: SUMMIT CROSSING PHASE 2A (PP) — (13-00900200) 1. Provide a street name for "New Street' 2. Add a private access easement on the backside of Block 4 and between Lots 8 Block 4. 3. Is there a reason why the block numbers are not continuing from the previous phase Block 1 is Block 4 on Summit Crossing Phase 1). 4. Add PDD Ordinance # to plat. It is #2668 5. Revise note #8 to remove "section 8.2.a.20" 6. Curve C5 should be labeled C4 on the plat. 7. GIS had the following comments: - The metes and bounds do not close. The Chord Bearings for C1 and C2 off. - For Boundary Line Data: Line 4 - Change bearing to N and W Lines 5 & 6 — Change bearings to S and W Line 7 — Change bearing to S and E 8. Parkland dedication fees of $16,468 will be due upon filing of the final plat. Reviewed by: Matt Robinson Date: 10/11/13 M (i.e. are NOTE: Any changes made to the plans which have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. ENGINEERING COMMENTS NO. 1 1. Please run the sanitary sewer line along the southwest side of Buena Vista and along the north side of New Street rather than at the rear of the lots. 2. Can the water or sanitary sewer be placed on opposite sides of the street along Lonetree Drive? 3. Verify that all utilities are at least 5.5-ft from the edge of the PUEs. Reviewed by: Erika Bridges Date: 10/14/13 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 2. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 3. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 2 of 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido ADDRESSING 1. Please propose a street name for New Street. 2. Block Ranges: 1400 Buena Vista @ 3800 New Street 1700 Lonetree Dr @ 3800 New Street Reviewed by: Robin Krause SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: 10/14/13 Date: 10/8/13 Date: 10/9/13 3 of development fees of $16,468 (46 lots x $358) will be due prior to filing of the Final Plat. Impact Fees: None in this area currently. REVIEW CRITERIA 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The subject property is designated Urban on the Comprehensive Plan Future Land Use and Character Map. The property is currently zoned PDD Planned Development District with townhomes the intended use as proposed with this Preliminary Plan. 2. Compliance with Subdivision Regulations: The proposed Preliminary Plan is in compliance with the Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATION Staff recommends approval of the Preliminary Plan. SUPPORTING MATERIALS 1. Application 2. Copy of Preliminary Plan Planning & Zoning Commission Page 4 of 4 November 7. 2013