Kevin Phillips
From: Kevin Phillips
Sent: Wednesday, September 18, 20131129 AM
To: rabon@mengineercom'
Subject: Nothing Further Certificate; 75+ acres, J. W. Scott, A-49, Brazos County
Attachments: 1301026-nfc pdf; 1301026-imroice.pdf
Ration,
As requested, please find attached our Nothing Further Certificate and Invoice on the described property. If you have any
questions, please feel free to contact us. Thank you for your business.
Best regards,
Kevin H. Phillips
Abstractor/ritle Examiner
Brazos County Abstract Company
3800 Cross Park Dr.
Bryan, Texas 77802
9/18/2013
Matt Robinson
From: Rabon Metcalf [rabon@rmengineer.com]
Sent: Monday, July 22, 2013 11:49 AM
To: Matt Robinson
Cc: jimmy easterly` Danielle Singh
Subject: RE: Summit Cross - Phase 2
Attachments: Summit -Phase 2.pdf
Matt— If Phase 2 is broken up into two parts (per attached exhibit) would the rezoning issue for the detention facility
and thoroughfare adjustment need to take place at this time? I am aware that the Preliminary Plan would need to be
revised and approved to reflect the phase change.
Thanks,
P.O. Box 9253
College Station, TX 77842
Off.• (979) 764-0704
Fax: (979) 764-0704
The information transmitted, by RME Consulting Engineers (RME), for the above referenced project is considered by RME to be confidential. This material is intended
ONLY for the use of the recipient named above and permission is not granted to the recipient for distribution of these documents in any form or fashion. The recipient
understands and agrees to RME that upon release of these documents is no longer responsible for their use or modification. The user and recipient of the documents
accept full responsibility and liabilityfor any consequences arising out of the use of these documents.
From: Matt Robinson [mailto:mrobinson@cstx.gov]
Sent: Wednesday, May 29, 2013 4:25 PM
To: 'Rabon Metcalf
Cc: 'jimmy easterly'; Danielle Singh
Subject: RE: Summit Cross - Phase 2
Rabon,
In response to the three follow-up items:
1) In doing further research, it appears that the University Summit project has completely expired with no vesting
remaining.
2) Planning and engineering are both in agreement that the detention needs to be included as part of a project
and not "off -site". As such the property will need to be incorporated into the zoning, preliminary plan and final
plat.
3) With the University Summit project having expired, the rezoning would be the first step. This would need to
include the property to the north (for detention purposes) and show a revised concept plan for the street
layout/detention etc. Please keep in mind that a waiver to block length for the plat will probably be necessary
due to the revised street layout.
Let me know if you have any additional questions.
® A4!SJQATu fl WWV ssxaZ Jo auzog
uot;z;S OBOIJODJO �4I0
t,OL0-b9L (61-6) rxej
POLO-6911 (6L6) WO
ZbBLL XL uo/;e;s a4allo0
&s06 xoa •O'd
<Ot822> FsE a;/ns `anu0 s/aew;sea L09L
i l
aw
ij
g
'3'd'bleo;aW vuogea
:(@Suega uolsua,xa,aa„s jo},uaw,snfpe,daouoo) SuluoZ £
:(... o;a'sJano-dlg VOH 's,uawasea
'6ui;;eld'2wuueld tieulwllaod'3uiuoz)„a,ls-}}o Sulaq 11 g;Inn paean aje sanssl;egm :uoi;ua;ap a;Is-go 'Z
Za;eaao;eg; saop sanssl,egm pandxa,ou s1,131 L;eld tieulwllaJd,lwwnS A;Isaanlun ag„o uol,ealdx3 'T
'ulese sNuegl
•o, sjamsue,a8 o, Sulog wam noA swa,l aU, aie Sulmollo;
ag, alp spunos sl Sul,aaw ag, gad -In}dlag Nan sem Sul,aaw,uawdolana0-aid agi AepjaJs@A awl, onoA ao} sNuegl
'„e W
Z asegd - ssoao,lwwnS ::pa[gns
,Aiwa;sea Awwl[, :00
uosulgo-d },eW :o,l
Wd 60:Z £TOZ '£Z AeW 'Aepsingl quas
[woo•aaaul6uawo@o uogero;llew];leo;aW uoged :woaj
V4!sjan/un W'8 y sexal;o acuOH
uoge;s 060//on;o Avo
no •x;so uosu/gojw ://nw3
961,E-1,9L (6L6) :xo3
OLSE-1,9L (6L6) :auogd
51,8LL XL 'uo/;o;S aba//oD
anuan y soxal TOTT
uo/;o;s aba//o0 Jo A;/D
JauuDld Jo/uaS
d91Y'uosulgoa j oDpV