HomeMy WebLinkAboutLetter of Completion (2)LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
DATE: LyLe- i, .2(i15
RE: COMPLETION OF�—
<� <� `1 DP 13 - lob,
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by 6644147, 4-
and by their subcontractors as indicated by signatures below. v
WORK COMPLETED
S�wP.i
Uux�en
Owner: 3-t) Qfaln��. f C Lc
Phone Number: LaRo- 5D
Address: `lLf.Q0 G3&04
J
Signature:e���,
ACCEPTAN E APPROVAL
WARRANTY DATE
Zltvie 1, 3N1 T
Contractor:
Phone Number: q7q-
Address: L lLtqO-
u1c auuvI IM@le flL'Cli UI'012G1. �.
rS 7k
Signature: LJ�.K,�
epre en tiv
..KLPLAT -ED
.grla MG1rE ESMTS FILED
�A'4- TOW BLANKET ESW FILED
i y Engine r ENO OTNEl1 ESWS NEEDED
Revised 1/31N7