Loading...
HomeMy WebLinkAboutLetter Acknowledging City StandardsSchultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 September 25, 2013 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards — Castlegate II Subdivision — Section 103 Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual except that Waterline W-10 has a minimum bury depth of 3 to 3.5 feet for a section of the waterline. The storm sewer pipe and sanitary sewer pipe proposed in this area limit the depth of the waterline. No other alternate design or construction methodology was used. I also acknowledge that, to the best of my knowledge, the details provided in the construction plans are in accordance with the B/CS Standard Details. Sincerely, Jos1h P. Schultz, P.E. Civil Engineer F-12327 - SCHULTZ ENGINEERING, LLC. P.O. Box 11995 • College Station, Texas 77842 sch u Itzeng i nee d ngl Ic. com