HomeMy WebLinkAboutLetter Acknowledging City StandardsSchultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
September 25, 2013
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards — Castlegate II Subdivision — Section 103
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water,
sanitary sewer, streets and drainage for the above -referenced project, to the best of my
knowledge, do not deviate from the B/CS Design Guideline Manual except that
Waterline W-10 has a minimum bury depth of 3 to 3.5 feet for a section of the waterline.
The storm sewer pipe and sanitary sewer pipe proposed in this area limit the depth of the
waterline. No other alternate design or construction methodology was used.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B/CS Standard Details.
Sincerely,
Jos1h P. Schultz, P.E.
Civil Engineer
F-12327 -
SCHULTZ ENGINEERING, LLC.
P.O. Box 11995 • College Station, Texas 77842
sch u Itzeng i nee d ngl Ic. com